TRIO-CINEMA 1 UCB, 2/08/2010 LVPS & Switching Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.

Slides:



Advertisements
Similar presentations
8xADC AMC board Tomasz Klonowski Warsaw University of Technology PERG – ISE
Advertisements

Team Harley ECU Larry Sawhill Mat Stein Justin Clark Sponsor: Biketronics Inc.Advisor: Chris Wagner.
P07301 Summary Data Acquisition Module. Team Members.
IFR/LST Meeting Feb 26, 2003K. Honscheid, Ohio State University High Voltage Requirements Commercial Solutions Custom Solutions.
Instrument TrainingIDPU - 1 UCB, Dec 6, 2006 THEMIS INSTRUMENT TRAINING IDPU.
GLAST LAT ProjectTower Power Supply Review Sept 22, 2003 Gunther HallerPart 2, Version 4 1 GLAST Large Area Telescope: Electronics, Data Acquisition &
Critical Design Review 27 February 2007 Black Box Car System (BBCS) ctrl + z: Benjamin Baker, Lisa Furnish, Chris Klepac, Benjamin Mauser, Zachary Miers.
TF Joint Voltage Drop Instrumentation Robert Marsala (609) Hans Schneider (609) Engineering Operations August 7, 2003 TF_JOINT_Final_Design_Review.ppt.
TRIO-CINEMA 1 UCB, 2/08/2010 STEIN Intro Davin Larson Space Sciences Laboratory University of California, Berkeley.
1 Applied Control Systems Technology. 2 Pin configuration Applied Control Systems.
Selda HeavnerFIELDS iPDR – Antenna Electronics Board Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Board Selda S. Heavner U.C. Berkeley
ISUAL Spectrophotometer Electronics C. Ingraham. 2NCKU UCB Tohoku CDR 9 July, 2001 Spectrophotometer Electronics C. Ingraham SP Electronics Functions.
BepiColombo/MMO/PWI/SORBET PWI meeting - Kanazawa 24/03/2006M.Dekkali MMO PWI Meeting Kanazawa University 24 th March 2006.
Network and Systems Laboratory nslab.ee.ntu.edu.tw 2010/12/10Wireless Sensor Network And Labs fall
DESIGN OF THE NEPTUNE NODE CONVERTER Vatché Vorpérian Jet Propulsion Laboratory.
Paguio, Cindy Sandoval, Andrew Valdez, Rozelle EE 241 Design Problem.
4 th NASA Space Weather & Robotic Mission Operations Workshop, NASA/GSFC, Greenbelt, MD, September 27, THEMIS Operations & Anomalies Manfred Bester.
TIM Phase A 1 SSL, 8/15/2007 Electric Field and Waves Instrument (EFW) Technical Interchange Meeting EFW Digital Electronics Digital Control Board (DCB)
LNA DC Bias Module Approach Block Diagram Schematic Program Plan
1 Dec SPP-Fields Antenna Electronics Board (AEB) Concept Status Report J.W.Bonnell, S. Harris, S. Heavner Space Sciences Laboratory UC Berkeley.
1 DAQ for FVTX detector Implementation Mark Prokop Los Alamos National Laboratory.
CaRIBOu Hardware Design and Status
The PDM-block M. Casolino on behalf of JEM-EUSO collaboration EUSO-BALLOON Phase A review 2 nd February 2012, CNES, Toulouse.
TRIO-CINEMA 1 UCB, 2/08/2010 Instrument Interface Board Dorothy Gordon CINEMA - EE Team Space Sciences Laboratory University of California, Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n t e g r a t e d D e s i g n C a p a b i l i t y / I n s t r u m e n t S y n t h e s i s & A.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
TRIO-CINEMA 1 UCB, 2/08/2010 Cinema Stein Interface FPGA (CSI) [Part II] Karthik Lakshmanan CINEMA - EE Team Space Sciences Laboratory University of California,
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR217 RBSP Electric Field and Waves Instrument (EFW) Instrument.
THEMIS/SRR ESA- 1 UCB, 06/08/2003 THEMIS Electrostatic Analyzer (ESA) instrument David W. Curtis Space Sciences Laboratory University of California, Berkeley.
Taeyeon Kim. Page  2 1.Vibration test plan for KHU 2.Harnessing 3.STEIN Housing 4.Future work.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Jerry Kim, SSL Mechanical.
C. Ingraham5-7 March 2001Data Processing Unit IFR1NCKU UCB Tohoku ISUAL Data Processing Unit (DPU) C. Ingraham.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
Student: Vikas Agarwal Guide: Prof H S Jamadagni
SDR 7 Jun Associated Electronics Package (AEP) Curtis Ingraham.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 213 Low Voltage Power Supply & Power Controller Board Peter.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes LVPS+PCB Peter BergRBSP/EFW CDR /30-10/1 IDPU LVPS AND PCB Critical Design Review.
AEP Mechanical and Power System H. Heetderks. CDR July, 2001NCKU UCB Tohoku AEP Mechanical and Power System H. Heetderks 2 AEP Mechanical Design System.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL System Engineer David Curtis, SSL STEIN.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL System Engineer David Curtis, SSL STEIN.
TRIO-CINEMA 1 UCB, 8/10/2010 CINEMA Project Update Thomas Immel UCB/SSL Space Sciences Laboratory University of California, Berkeley.
NameFIELDS iPDR – Subject Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Box Selda S. Heavner U.C. Berkeley 1.
TRIO-CINEMA 1 UCB, 2/08/2010 CINEMA Mechanical Systems David Glaser Mechanical Engineering Space Sciences Laboratory University of California, Berkeley.
TRIO-CINEMA 1 UCB, 2/08/2010 CINEMA Solar Array Design Review Yashraj Khaitan David Glaser Kevin Jenkins Chris Pasma Space Sciences Laboratory University.
TRIO-CINEMA 1 UCB, 2/08/2010 Integration and Test Program Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
TRIO-CINEMA 1 UCB, 2/08/2010 Mission Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
FIELDS iPDR – RFS Analog Dennis N. Seitz 1 Solar Probe Plus FIELDS Instrument PDR Radio Frequency Spectrometer Analog Dennis N. Seitz UC Berkeley SSL
STEREO IMPACT Critical Design Review 2002 November 20,21,22 P.Berg1 STEREO IMPACT POWER SUPPLIES Peter Berg, UC Berkeley Space Sciences Lab,
1 PFP Team Meeting Particles and Fields Package Weekly Team Meeting, SSL April Dave Curtis, PFP PM.
TRIO-CINEMA 1 UCB, 2/08/2010 End of Summer Review Kevin Jenkins Mechanical Engineering Space Sciences Laboratory University of California, Berkeley.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
TRIO-CINEMA 1 UCB, 2/08/2010 ClydeSpace Electronic Power System Yashraj Khaitan Space Sciences Laboratory University of California, Berkeley.
TRIO-CINEMA C&DH- 1 KHU, 10/19/2009 Command & Data Handling System (C&DH) Peter Harvey David Curtis David McGrogan Space Sciences Laboratory University.
TRIO-CINEMA 1 UCB, 2/08/2010 ACS Dave Auslander, Dave Pankow, Han Chen, Yao-Ting Mao, UC Berkeley Space Sciences Laboratory University of California, Berkeley.
TRIO-CINEMA 1 UCB, 2/08/2010 System Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
TRIO-CINEMA 1 UCB, 2/08/2010 FSW & Operations Winter Summary Seyoung Yoon KHU EE Team.
Particles and Fields Package (PFP) SWEA Pre-CDR Peer Review
FGM CDR FGM Electronics (FGE) Ronald Kroth MAGSON GmbH Berlin Germany.
CINEMA System Engineering
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
ISUAL Associated Electronics Package
Preliminary Design Review
ACS UC Berkeley Space Sciences Laboratory
Data Acquisition Systems
Low Voltage Power Supply & Power Controller Board
Digital Sub-System Dorothy Gordon.
P14372 Actively Stabilized Hand-Held Laser Pointer
Presentation transcript:

TRIO-CINEMA 1 UCB, 2/08/2010 LVPS & Switching Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley

TRIO-CINEMA 2 UCB, 2/08/2010 LVPS Requirements

TRIO-CINEMA 3 UCB, 2/08/2010 LVPS Requirements Summary LVPS converts bus voltage (~8V) to regulated analog voltages for STEIN and MAGIC LVPS switches analog and digital voltages to STEIN and MAGIC LVPS switches 8V bus to: –MAGIC boom actuator –UHF antenna actuator –STEIN attenuator actuators –Torque coils (2 polarities) –Spare LVPS shares a PC104 board with the Instrument Interface FPGA

TRIO-CINEMA 4 UCB, 2/08/2010 LVPS Block Diagram

TRIO-CINEMA 5 UCB, 2/08/2010 LVPS Implementation Schematic complete Deigned using commercial power converter ‘bricks’ –Calex 1W converters Instrument switches include overcurrent shutdown –latchup protection, testing protection Processor controls ‘Instrument’ switch which powers FPGA, MAGIC FPGA controls STEIN switch, Bus voltage switches –No protection on bus switches (part not available) Schematic provided to Hien Vo students for starting layout –Still needs FPGA, connectors added Fabrication and test plans TBD

TRIO-CINEMA 6 UCB, 2/08/2010 Issues Need to complete IIB schematics before layout can proceed Need to verify overcurrent circuit does not trip on instrument worst case consumption –Can replace with parts with no limit, but increased risk of latchup failure, bench testing failure.