, EVN Users Meeting Tom Muxlow Cagliari, 9 th October 2014.

Slides:



Advertisements
Similar presentations
United Nations Statistics Division
Advertisements

Onsala Space Observatory Present status and technical directions of the EVN Michael Lindqvist Onsala Space Observatory, Sweden Arpad.
FACET: The Proposal Process with Q & A Carsten Hast SLAC National Accelerator Laboratory.
NRAO Proposal Tool (PST) Gustaaf van Moorsel NRAO Community Day 1/13/2012.
Very Long Baseline Interferometry (VLBI) – Techniques and Applications Steven Tingay ATNF Astronomical Synthesis Imaging Workshop Narrabri, 24 – 28 September,
VLBI Report LBA Operations & eVLBI Tasso Tzioumis ATNF May 2008.
J.M. Wrobel - 25 June 2002 PROPOSALS 1 PROPOSAL WRITING TUTORIAL Outline 30 minutes: Lecture on Generic Issues 60 minutes: Small Groups Write Proposals.
VLBI in Africa Michael Bietenholz Hartebeesthoek Radio Observatory.
An idea of Space mm/sub- mm VLBI Array Xiao-Yu Hong ( 洪晓瑜 ) Jun-Hui Zhao ( 赵军辉 ) Zhi-qiang Shen ( 沈志强 ) Shanghai Astronomical Observatory ( 中国科学院上海天文台.
PhD SLAT Student GradPath Presentation Nancy Lindsay.
E-VLBI: Connecting the Global Array of Radio Telescopes through High-Speed Networks Participating U.S. organizations: MIT Haystack Observatory MIT Lincoln.
KVN RAS in KOREA Current status. RAFCAP 7 th meeting, Tokyo, 5 June, 2010 Final Goals for Freedom Challenge and Change - Domestic and International Activities.
National Radio Astronomy Observatory May 17, 2006 – Legacy Projects Workshop VLA/VLBA Large Projects Jim Ulvestad Assistant Director, NRAO.
EVLA Early Science: Shared Risk Observing EVLA Advisory Committee Meeting, March 19-20, 2009 Claire Chandler Deputy AD for Science, NM Ops.
LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009.
上海天文台 Shanghai Astronomical Observatory e-VLBI Progress in China Zhang Xiuzhong, team of Chinese VLBI Network Shanghai Astronomical Observatory Chinese.
E-VLBI over TransPAC Masaki HirabaruDavid LapsleyYasuhiro KoyamaAlan Whitney Communications Research Laboratory, Japan MIT Haystack Observatory, USA Communications.
ALMA Software B.E. Glendenning (NRAO). 2 ALMA “High Frequency VLA” in Chile Presently a European/North American Project –Japan is almost certainly joining.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
Designing Experiments T. Venturi Istituto di Radioastronomia, Bologna, INAF ERIS, Manchester, 9 September 2005.
Althea Wilkinson RadioNet Project Manager University of Manchester Jodrell Bank Observatory Project Manager’s Report & Finance Report Rome September 2008.
EVLBI and the Australian SKA Pathfinder (ASKAP) Prof. Steven Tingay Curtin University of Technology Perth, Australia 7th eVLBI workshop SHAO, 2008 June.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Transition Operations Claire Chandler.
JVLA capabilities to be offered for semester 2013A Claire Chandler.
Status and capabilities of the Australian LBA Phil Diamond Chief, Astronomy & Space Science.
Step 4 Presenter: Updated 6/21/2013. Training Overview Introduction Walk Through Step 4 Scheduled FET Trainings & Completion Dates for FET Step(s) Question(s)
The Progress Report for KVN Construction Seog-Tae Han and KVN staffs Korea Astronomy and Space Science Institute March18 th 2009.
Status and future of East Asia VLBI network H.Kobayashi(NAOJ) East Asia VLBI
FAO/WHO Codex Training Package Module 4.2 JOINT FAO/WHO CODEX TRAINING PACKAGE MODULE FOUR – SCIENTIFIC BASIS FOR CODEX WORK 4.2 Requesting, accessing.
Four hot DOGs eaten up with the EVN Sándor Frey (FÖMI SGO, Hungary) Zsolt Paragi (JIVE, the Netherlands) Krisztina Gabányi (FÖMI SGO, Hungary) Tao An (SHAO,
E-VLBI FP6 Proposal. Outline Background The Call Content of Proposal & Aim Possible Participants Overall preparation plan.
02/6/ jdr1 Interference in VLBI Observations Jon Romney NRAO, Socorro ===================================== 2002 June 12.
An FX software correlator for VLBI Adam Deller Swinburne University Australia Telescope National Facility (ATNF)
Rolling Resistance Standards Work at ISO (TC31 WG6) Prepared for GRB Review 19 Sep 2011 Angela Wolynski WG6 Convenor Informal document GRB (54th.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Observing with NRAO.
Westerbork Netherlands Dedicated Gbit link Onsala Sweden Gbit link Jodrell Bank UK Dwingeloo DWDM link Cambridge UK MERLIN Medicina Italy Chalmers University.
A Global 86 GHz VLBI Survey of Compact Radio Sources Sang-Sung Lee MPIfR In collaboration with A.P. Lobanov, T.P. Krichbaum, A. Witzel, J.A. Zensus (MPIfR,
Iván Agudo with the collaboration of: S.N. Molina, J. L. Gómez (IAA-CSIC) T. P. Krichbaum, A. Roy, U. Bach (MPIfR) I. Martí Vidal (Chalmers) B. Campbell.
GLAST Science Support Center June 21, 2007 Getting Involved with GLAST GLAST Guest Investigator Program David Band, GSSC CRESST/GSFC/UMBC.
GBT Future Instrumentation Workshop Fixing the frequency coverage hole in C-Band Jagadheep D. Pandian Cornell University.
Tenth Summer Synthesis Imaging Workshop University of New Mexico, June 13-20, 2006 Proposal Writing Joan Wrobel.
Ninth Synthesis Imaging Summer School Socorro, June 15-22, 2004 Proposal Writing Joan Wrobel.
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
Eleventh Synthesis Imaging Workshop Socorro, June 10-17, 2008 Proposal Writing Joan Wrobel.
Single Dish Summer School, Green Bank 2007 Things to do with Single Dish: VLBI Tapasi Ghosh NAIC/Arecibo Observatory Outline: Interferometry Basic.
EVN Performance and Reliability Iván Agudo. Collection of Highlights A large improvement of the EVN in terms of new stations & sensitivity! First fringes.
SA1: second year overview Arpad Szomoru JIVE January 30EXPReS Board Meeting, Utrecht, the Netherlands: SA1Slide #2 Outline Accomplishments in 2007.
Coordinator’s report Huib van Langevelde EXPReS board Utrecht, 30 January, 2008.
Scenario use cases Szymon Mueller PSNC. Agenda 1.General description of experiment use case. 2.Detailed description of use cases: 1.Preparation for observation.
Targeting transient phenomena with e-VLBI Zsolt Paragi (JIVE), for the EXPReS project.
WP2- EVN-NREN On behalf of Richard Hughes-Jones 2012 Jun 20.
EVN Amplitude Calibration Iván Agudo. Quality of Calibration EVN Amplitude Calibration, Iván Agudo (JIVE) EVN TOG Meeting, Cagliari, Italy,
NEXPReS WP5 - Cloud Correlation Work Package Overview Arpad Szomoru JIVE.
Obtaining e-MERLIN Data For Use With NRAO Legacy Projects Tom Muxlow May 17 th 2006.
INFSO-RI Enabling Grids for E-sciencE Demonstrations Session Introduction Bob Jones 2 nd EGEE conference Den Haag, Netherlands 24.
Draft thoughts on selecting LSST DDFs
Updating the Regulation for the JINR Programme Advisory Committees
ALMA Cycle 5 Hiroshi Nagai (NAOJ).
IGG Agenda 23rd February 2011 Minutes from Previous IGG Meeting
CEOS Work planning Steven Hosford, ESA/CNES, CEO
Shared Risk Observing Claire Chandler EVLA SSS Review, June 5, 2009
Astro Space Center of Lebedev Physical Institute, Moscow
Shared Risk Science with the EVLA
Analysis of Network Outage Reports
Arecibo Observatory VLBI Program and Plans
EXPReS Annual Review April 17
A roadmap for the next decade
GAC Travel Support Rules Update
Rick Perley NRAO - Socorro
Leadership and Nominating Committee
Presentation transcript:

, EVN Users Meeting Tom Muxlow Cagliari, 9 th October 2014

Agenda for EVN Users Meeting Agenda for EVN Users Meeting 9th October :30 – 17:00 1) Introduction – Tom Muxlow a. EVN PC Update b. Recent additions to EVN capabilities c. Proposal statistics 2) Correlator and Proposal Tool Updates – Bob Campbell 3) EVN Scheduling – Alastair Gunn 4) Open Discussion – Miguel Perez-Torres (Motivator) a. Recent proposal numbers (suggested by Tom Muxlow) b. Calibration Issues (ANTAB tables) (suggested by Robert Schulz) c. Global VLBI at ~150MHz (suggested by Olaf Wucknitz) d. mm-band improvements (suggested by Richard Dodson/Maria Roija) 5) AOB Tom Muxlow,

EVN PC Membership Members from EVN Institutes A. Bartkiewicz (Torun) B. Campbell (JIVE) M. Giroletti (INAF-IRA) Z. Shen (Sh + Ur) M. Lindqvist (OSO) * A. Lobanov (MPIfR) – Secretary A. Polatidis (ASTRON) A. Melnikov (St Petersburg) T. Muxlow (JBCA/e-MERLIN)*-Chairperson “At Large” Members Angela Bazzano (INAF IAPS Rome) M. Pérez-Torres (IAA-CSIC) S. Frey ( FOMI) E. Humphreys (ESO) Representatives A. Gunn EVN Scheduler B. Campbell EVN Correlator at JIVE NRAO Representatives M. Claussen NRAO Scheduler Also Ken Kellermann & Toney Minter Recent Appointments Recent Appointments Chairperson rotates om January 1 st 2015 Chairperson rotates om January 1 st 2015 *Michael Lindqvist replaces Tom Muxlow *Michael Lindqvist replaces Tom Muxlow

Recent Additions to EVN Facilities The new 65m Tianma (Shanghai) telescope will become available for EVN operations from Session Default is still Sheshan (25m) so additional scientific justification is required See the EVN Status Table for details. Recent Additions to EVN Facilities The new 65m Tianma (Shanghai) telescope will become available for EVN operations from Session Default is still Sheshan (25m) so additional scientific justification is required See the EVN Status Table for details. The Korean VLBI Network (KVN) has now become an Associate Member of the EVN (as from January 2014). 3 21m antennas available: Yonsai, Ulsan, Tamna KVN telescopes may be requested for EVN observations at 1.3cm and 7mm wavelengths. For more details regarding the KVN, see:

Use of Australian VLBI Network Antennas (LBA) Starting in Session , some Australian Long Baseline Array (LBA) time has been made available for simultaneous scheduling with the EVN, thus enabling the possibility of joint LBA/EVN observations in that and future disc sessions. Proposals for joint LBA/EVN observations in session 2/2015 must be submitted separately to both the LBA and EVN: LBA in their 15 Dec 2014 deadline. EVN in their 1 Feb 2015 deadline. For details regarding proposing on the LBA, see: Use of Australian VLBI Network Antennas (LBA) Starting in Session , some Australian Long Baseline Array (LBA) time has been made available for simultaneous scheduling with the EVN, thus enabling the possibility of joint LBA/EVN observations in that and future disc sessions. Proposals for joint LBA/EVN observations in session 2/2015 must be submitted separately to both the LBA and EVN: LBA in their 15 Dec 2014 deadline. EVN in their 1 Feb 2015 deadline. For details regarding proposing on the LBA, see: EVN+LBA observations should be possible at all principal EVN wavebands from 21 cm to 1.3 cm.: See: No take-up as yet for these LBA facilities…

Out of Session Observing Out-of-Session observing time (up to a maximum of 144 hours/year), is now available to all proposals. Proposals requesting Out-of- Session observing time must provide full scientific (and technical if appropriate) justification as to why observations must be made outside regular sessions. Proposals will only be considered for dates occurring after the regular EVN session that follows the proposal deadline. Observations requiring much shorter lead times should be submitted as "Target-of-Opportunity" proposals. For this and all developments shown here – see the recent call for proposals: Out of Session Observing Out-of-Session observing time (up to a maximum of 144 hours/year), is now available to all proposals. Proposals requesting Out-of- Session observing time must provide full scientific (and technical if appropriate) justification as to why observations must be made outside regular sessions. Proposals will only be considered for dates occurring after the regular EVN session that follows the proposal deadline. Observations requiring much shorter lead times should be submitted as "Target-of-Opportunity" proposals. For this and all developments shown here – see the recent call for proposals:

A commensal survey of fast transients with the EVN EVN Proposal EP089 (LOCATe consortium) – agreed by the CBD Piggyback survey to run in the background on your proposal. Discussions continuing to put required infrastructure in place. PI will be able to opt out it they want to. Your programme data are still proprietary!! You will be fully consulted…… Automated trigger programmes Rapid response on timescale of minutes – new transient science (from user pressure) Carefully defined generic proposals allowed Rigorous trigger criteria required Limited programme lifetime Programmes will be graded by PC and will sit in a queue awaiting e-VLBI sessions Approved programmes can displace scheduled programmes of lower grade in e-VLBI. Trigger displacement tests are continuing – Once reliable, details to be announced… Coming soon to a telescope near you…

Detailed Proposal Trends Breakdown of submitted proposal band requests over the past four years. Dominated by L- and C-Band proposals - but significant demand for other bands Less recent demand for 5cm + Occasional 90cm Low frequencies?

Detailed Proposal Trends Breakdown of submitted proposal science areas over the past four years. Still dominated by classical areas of AGN/jets, stellar evolution Starburst/ULIRGs and masers still strong but demand has dipped a little More specialized astrometry and spacecraft tracking programmes continue

Proposal trends over 9 years 2014 final figures assume an average of 11 ToOs/year