NSTX TF Flag Joint Status of Design, Analysis, Test Activities & Design Review Preparations C Neumeyer NSTX Team Meeting 7/24/3.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

Testing Test Setup TapLok Insert Shear Key Copper Threads Friction Tests Collar Shear Tests NSTX TF FLAG JOINT REVIEW 8/7/03 Michael Kalish.
Fasteners / Joint Design Michael Kalish NSTX TF FLAG JOINT REVIEW 8/7/03.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
J. H. ChrzanowskiNSTX TF Flag Joint Design Review1 NSTX TF Flag Joint Design Review Fabrication and Assembly April 10, 2003 By: James H. Chrzanowski.
NSTX TF Flag Joint Review ANALYSIS & DESIGN C Neumeyer 9/3/3.
NSTX Center Stack Upgrade Workshop Brainstorming on Design Solutions for TF Joint C Neumeyer Jan 22, 2009.
Component Testing Test Setup TapLok Insert Shear Key Copper Threads Friction Tests Collar Shear Tests NSTX TF FLAG JOINT REVIEW 8/7/03 Michael Kalish.
Fasteners / Joint Design Michael Kalish NSTX TF FLAG JOINT REVIEW 4/10/03.
Fasteners / Joint Design Michael Kalish NSTX TF FLAG JOINT REVIEW 8/7/03.
NSTX Upgrade Testing TF Coil Flexible Connector Prototype In-Plane Deflection Test
Component Testing Test Setup TapLok Insert Shear Key Copper Threads
7A1 Friction & Galling Test
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
LARP QXF 150mm Structure Mike Anerella / John Cozzolino / Jesse Schmalzle November 15, nd Joint HiLumi LHC-LARP Annual Meeting.
M. Gilchriese Glued Fittings October 26, M. Gilchriese 2 Samples and Prep Three samples using Hysol 9396 Seven samples using Hysol 9394 Surface.
Majorana collaboration meeting, Seattle, Aug.7 - Aug. 9 Béla MajorovitsGERDA detector mounting 1 GERDA Detector Mounting The Detector Holders Detector.
TF FLAG JOINT HIGH CURRENT TEST FIXTURE INSTALLATION TO BE IN THE NSTX TRANSITION AREA Features Assembled Components: Flag and Mating Section of TF Center.
Office of Science Coupling Coil Status S. Gourlay August 1, 2012.
Proposed TF Joint Design C Neumeyer 2/26/9 Notes: 1)Several concepts included are based on ideas developed by R Woolley 2)No analysis has yet been performed.
NSTX TF Flag Joint Design Review INTRODUCTION C Neumeyer 8/7/3.
Electricity Currents, Circuits Electricity that moves… Current: The flow of electrons from one place to another. Current: The flow of electrons from.
NSTX TF Flag Joint Design Review OVERVIEW C Neumeyer 8/7/3.
ITER In-Vessel Coils (IVC) Interim Design Review Introduction C Neumeyer July 26, 2010 July 26-28, 20101ITER_D_3F7XHR.
Mechanical Testing of Flag Joint Assembly. TF Flag Assembly to be Tested.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 General List of Tasks by Performance.
Modular Coil Electrical Joint1 NCSX Peer Review Modular Coil Electrical Joint James Chrzanowski April 24, 2006.
Signals from ISTP-001 April 11-13, 2005 Preliminary Assessment C Neumeyer.
NSTXU-CALC TF Flex Joint and TF Bundle Stub
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Key Design Issues and Recent Reviews Tom Peterson, Fermilab DFBX PRR, October 23, 2002 US LHC ACCELERATOR PROJECT brookhaven - fermilab - berkeley.
M. Gilchriese - April 2001 Disk Sector Status. M. Gilchriese - April Technical Status Three prototypes to current dimensions(8-sector disks) except.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
NCSX NCSX TF Coil Procurement 1 February 3, 2006 Michael Kalish NCSX TF Coil Procurement.
Ronald Lipton Layer 0 Status PMG Sep Status of the Layer 0 Project – emphasis on hardware status, preproduction, and preparations for shutdown work.
TF Joint Operations Review Introduction C Neumeyer 2/10/05 Scope and Outline of Review Summary of Findings from 2004 Run Review of Joint Force, Pressure.
ITER In-Vessel Coils (IVC) Interim Design Review Thermal Structural FEA of Feeders A Brooks July 27, 2010 July 26-28, 20101ITER_D_353BL2.
NSTX Response to the Lessons Learned Report NSTX TF Coil Repair Review September 3-4, 2003 Al von Halle.
NCSX Operation of the C1 Modular Coil in the Coil Test Facility Peer Review June1, 2006 NCSX.
Peer Review NSTX TF Hub Assembly Friction Coating C Neumeyer 10/27/04 Requirements Testing Calculation Update Implementation.
Figure 1 – NSTX Upper Umbrella Assembly Upgrade Design: Version 3.
F. Dahlgren -SC Project Review of NCSX, April 8-10, 2008 PF, TF, & Trim Coil Supports (WBS-15) Core Base Support Structure (WBS-17) F. Dahlgren NCSX Coil.
NSTX TF Flag Joint Torque Collar Chit Review C Neumeyer 9/11/3.
TF Joint Operations Review Commissioning Plan C Neumeyer 2/10/05 Test Shots Instrumentation Benchmarking.
Testing Methods for Composites
NSTX TF Flag Joint Design Review SUMMARY C Neumeyer 8/7/3.
TF Joint Operations Review Simplified Modeling & Protection C Neumeyer 2/10/05 IP and OOP Load Modeling Linear Model of IP and OOP pressure at Joint FEMLAB.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
Proposed TF Joint Design Concept #1 C Neumeyer 3/23/9 Notes: 1)Several concepts included are based on ideas developed by R Woolley 2)No analysis has yet.
AWB NSTX TF Flag Joint Design Review April 10, 2003 Art Brooks.
A View of NCSX Structural System and Load Path for the Base Support Structure.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
REQUIREMENTS & ASSUMPTIONS C Neumeyer 4/10/3. FIELD AND CURRENT Base GRD requirement: 3kG at R 0 =0.854m with 4.5 sec flat top, once every 300s
A PROPOSED TF JOINT DESIGN FOR THE NSTX CENTERSTACK UPGRADE Robert D Woolley 25 February 2009.
Engineering Operations Outage Schedule The vessel & beamline are under vacuum. 1st Bake-out complete. Air leaks found and fixed. The OH coil will be installed.
Engineering Operations TF Commissioning Mechanical testing of TF flag/box assemblies complete, inner bundle installed, and all joints made up. Joint resistance.
Preliminary Analysis of TF Joint Behavior* C Neumeyer NSTX Team Meeting 2/12/4 *Summary from 1/29/4 Presentation.
TF Fabrication Progress is being made on TF bundle fabrication activities but the schedule remains tight. All 24 outer conductors have been machined but.
Magnetics Program Highlights VLT Conference Call September 13, 2000 presented by J.V. Minervini MIT Plasma Science and Fusion Center.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
TF Joint Testing Data Acquisition Special Test Equipment Hans Schneider with Robert Marsala (609) Engineering Operations April.
NSTX TF Flag Joint Design Review OVERVIEW C Neumeyer 8/7/3.
C.K. PITHAWALLA COLLAGE OF ENGINEERING & TECHNOLOGY
T5.2: Harmonization - Material and Component Reference
Energy Systems An energy system is a method by which energy is transferred and work is done. There are four basic types of energy systems: Mechanical Fluid.
DESIGN MODELING AND ANALYSIS OF SINGLE PLATE CLUTCH
GLAST Large Area Telescope:
MECH 3550 : Simulation & Visualization
Power Leads for Test Stands
GLAST Large Area Telescope:
Presentation transcript:

NSTX TF Flag Joint Status of Design, Analysis, Test Activities & Design Review Preparations C Neumeyer NSTX Team Meeting 7/24/3

DESIGN (Jim Chrzanowski and Bruce Paul)

DESIGN  Fabrication drawings issued for… conductors flags flag boxes shear shoes  3D modeling completed for remainder of design… hub coolant tube routing and bulkhead outer leg connections …except for torque collar and its interface with hub

ANALYSIS (Irv Zatz)  Finite Element Analysis has incorporated all aspects of the problem and is in active use in guiding the finalization of the design… both tiers of conductors out-of-plane load path through spline collar and wet lay-up representation in-plane, out-of-plane, thermal loads

ANALYSIS  Best design approach eliminates collar as a load path for the vertical force use collar for inner bundle torsion only friction and shear shoe are adequate for vertical load  As soon as suitable collar design is established, analysis can be finalized

COMPONENT TESTING (Mike Kalish et al)  Pullout testing pullout of inserts in copper at 100C complete (one time and cyclic) pullout of bolts in copper complete (one time and cyclic)

COMPONENT TESTING  Wet lay-up shear testing four groups of six samples tested (one time and cyclic) one with improved Hysol epoxy fifth group of samples now under test

COMPONENT TESTING  Friction testing five samples tested at various compression levels to establish friction coefficient for silver plated copper

PROTOTYPE TESTING  Mechanical Prototype (M Kalish et al) fixturing and instrumentation preparations are in progress  Electrical Prototype (Gene Baker et al) test stand is essentially complete instrumentation and protection preparations in progress

INSTRUMENTATION (Hans Schneider and Bob Marsala)  Voltage probe scheme selected for joint voltage drop (resistance) measurement  Will implement system to measure resistance at (200A) and voltage drop during operations on all 72 joints  Strain, temperature, displacement measurements still undecided

INSTRUMENTATION  Tested measurement technique and characterized silver plated copper joint resistance vs. pressure behavior

DESIGN REVIEW PREPARATIONS  Preliminary package goes out next Thurs, July 31 overview document chit resolution document set of drawings  Dry runs begin Mon, Aug 4  Review convenes on Thurs, Aug 7