NSQP MEETING 20-01-2011. Valery AKHNAZAROV January 20th 2011 Laminate the NTC-HV and PS harnesses Assembly Name: PP1 Penetration Tape Parts requires:

Slides:



Advertisements
Similar presentations
Manufacturing Processes for a 4 Layer Multi-layer PCB Section through PCB Via hole SMD Pad The following presentation covers the main processes during.
Advertisements

1 P720 PRINTER CLEANING PROCEDURES. 2 Printer Cleaning Instructions u For the P720 to Operate Properly It Is Important to Keep the Printer Clean and Free.
IMPERVIUS ENGINEERED COATINGS AN ECONOMICAL APPROACH TO PITCH ROOF WATERPROOFING.
Production Procedure for RX Manpower Arrangement Demonstration Production Schedule.
HQ Coil 18 Test Impregnation LARP Video Meeting November 21, 2013 Dan Cheng.
Presented by: Les Jenson Chief Engineer Beta LaserMike
Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China.
1 Peter Monaghan“Hall C January 2011 Users Meeting”15 th January 2011 SHMS Wire Chamber Update RECAP from August Review: Vendor price quote 5x larger than.
MM mechanical prototype Work progress at CERN MicroMegas General Meeting, CERN, 5-6 November
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
COB 08 RTM Fuse Modification Required – Soldering iron capable of removing resistor without damaging board. Metcal with tweezer attachment recommended.
Disassemble, Assemble and Perform a Function Check on the M9
Curing Mold Laminations Miao Yu 05/17/2012. QC on the cross-section 30/30 samples before production 16/500 samples during production 2.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
Atsuhiko Ochi, Kobe University 18/03/2015 RD51 CERN.
This task covers: a. Removal b. Cleaning and Inspection c. Installation INITIAL SETUP: Equipment Condition  Front axle spindle removed. Materials/Parts.
1 SBS Spectrometer / GEP5 Conf.. 2 Tracking Requirements Requirements Tracking Technology DriftMPGDSilicon High Rate: MHz/cm 2 (Front Tracker)
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia SCT week, Valencia, June 2002 Pre-series Low Mass Tapes 12 different lengths were produced for barrel.
NSQP MEETING Valery AKHNAZAROV January 20th 2011 ISP PP0 Board Bonding Procedure Type 1 Type 3 Type 4peek Type 4 Assembly Name: ISP ASM Parts.
Activities Status and Plan for the week D. Giugni / INFN Milano D. Giugni Monday Meeting
LSU 09/12/2013Electronics - SkeeterSat1 Building SkeeterSat Inventory Components  Identify components Use the parts list and assembly manual  Tape to.
Quality Control and Quality Assurance for PCB production Fabian Kuger on behalf of the MAMMA Collaboration Julius-Maximilians Universität Würzburg, Germany.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
Piotr Bielówka ul. Muchoborska 18 PL Wrocław Phone: Phone/Fax E -mail: 22 nd.
Some questions:  In which order cables will be put ?  Who, where will put PS signal cables in bundles ?  Which kind of cable binders: velcro or panduit.
NSQP X-1 ASSEMBLY Lessons learned Sébastien MICHAL January 30 rd 2012.
Module mounting. Status Stave 250 received… damaged – Repair now complete (see extras) Friday at 8:30 it will be collected by RAL driver and transported.
Factoring - Difference of Squares What is a Perfect Square.
Sils ATLAS Meeting 18-9 October 2003 Mechanics for the Barrel SCT.
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
Building A Co-Cure Cable Thomas Johnson
Uses of Radioactivity • Measuring the thickness of foil
Low Mass Rui de Oliveira (CERN) July
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
Atsuhiko Ochi, Kobe University 16/04/2014 MM PCB WG CERN.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
1. Take HV harnesses with label (IHV2) and transfer on the Stacking table. 1.1 Inspect HV harnesses visually. 2.1 Insulate HV Flex with 3M™ VHB™ Tape.
NSQP MEETING Valery AKHNAZAROV January 20th 2011 Corrugated Panel Bonding Procedure Assembly Name: ISP Corrugated Panel ASM Parts.
ECR - PSB: New KSW magnet in 16L1 Luis Feliciano, 4 th February.
親愛的吉姆舅舅: 今天吃完晚餐後,奶奶說,在家 裡情況變好以前,您要我搬到城裡跟 您住。奶奶有沒有跟您說,爸爸已經 好久沒有工作,也好久沒有人請媽媽 做衣服了? 我們聽完都哭了,連爸爸也哭了, 但是媽媽說了一個故事讓我們又笑了。 她說:您們小的時候,她曾經被您追 得爬到樹上去,真的嗎? 雖然我個子小,但是我很強壯,
第 三 章 矿物在正交偏光镜下的 均质性、非均质性.
ПЕЧЕНЬ 9. Закладка печени в период эмбрионального развития.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -
1 SLAC RC Status Report 19 July 2010 LHC Collimation Working Group Meeting Jeff Smith/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
The reading is 7.38 mm. The reading is 7.72 mm.
Dry Wall Installation Copyright © Texas Education Agency, All rights reserved.
European DHCAL Meeting 13/06/08
Global Exotics Board Replacement
Update on Pavia MM mechanical prototype
GEM and MicroMegas R&D Xiaomei Li Science and Technology
Ultracorr® Installation Process
Microscope Close-Out Photos
Activities Status and Plan for the week
Activities Status and Plan for the week
Non DestructiveTesting
Some proposals on HV circuits realization for segmented straw detector
PCB Connector Options Glenair® offers a variety of options when terminating Printed Circuit Boards, Flex Tape or Rigid Flex to Connectors using solder.
ISB6.7 Euro 6 EGR Crossover Tube Insulation Removal
זכויות סוציאליות.
Lathe Flow Diagram Isolate power Isolate power Isolate power
Label Name Label Name Label Name Label Name Label Name Label Name
Lesson Objectives To understand how to construct and present a design idea. Success Criteria Must Be able to understand the different marking on a net.
Membrane Potentiometer Carrier – Assembly Diagrams
M4 & M6 Squirrel® Fixings Installation Guide
Enclosure openings with wires
After service guide for changing PCB
Presentation transcript:

NSQP MEETING

Valery AKHNAZAROV January 20th 2011 Laminate the NTC-HV and PS harnesses Assembly Name: PP1 Penetration Tape Parts requires: ISP HV –NTC PCB ISP PS PCB Tools/Consumables: 1. supporting block for NTC-HV 2. supporting block for PS 3. alcohol 4. roller 5. 3M™ VHB™ Tape 25mm 6. Kapton (thickness 0,17mm) 7. Kapton Tape 25mm

Valery AKHNAZAROV January 20th 2011 Laminate the NTC-HV and PS PSB 1.Inspect HV PCB visually. 2.Remove label. 3.Clean PCB surface with alcohol. 4.Attach 3M™ Tape (See diagram) (use a roller). 5.Attach Kapton (use a roller) 6.Attach 3M™ Tape (See diagram) (use a roller.) 7.Install the HV PCB in the supporting block. 8.remove the foil and set the following PCB. 9.Follow task from 2 to 8. 3M™ Tape Kapton

Valery AKHNAZAROV January 20th 2011 Laminate the NTC-HV and PS PSB 1.Inspect PS PCB visually. 2.Remove label. 3.Clean PCB surface with alcohol. 4.Attach 3M™ Tape (See diagram) (use a roller). 5.Attach Kapton Tape 6.Attach 3M™ Tape (See diagram) (use a roller.) 7.Install the PS PCB in the supporting block. 8.Remove the foil and set the following PS PCB. 9.Follow task from 2 to 8. 3M™ Tape Kapton Tape