Layout Experimental hall Final status (?) 3rd HIE ISOLDE Physics Coordination Group meeting CERN, 3 September 2012 HIE-ISOLDE Erwin Siesling.

Slides:



Advertisements
Similar presentations
Status Report on the TSR building (and Infrastructure) Isolde workshop CERN, 27/28 April 2015 Isolde Erwin Siesling.
Advertisements

The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
27 Feb 2012 Erwin Siesling 1 TSR Max Planck Institute Heidelberg Hie-Isolde LOI endored Jan 2011 TDR submitted Jan.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Construction and Installation of the CLIC Experimental Area
Powering the main linac implications Daniel Siemaszko, Serge Pittet OUTLINE : Cost impact of power converters, power consumption and powering.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
JPV, TB of Nov.15 th, ‘Rack Status‘ Jean-Pierre Vanuxem, PH-AIS.
HIE-ISOLDE Project Status Report Y. Kadi for the HIE-ISOLDE Project Team 49th INTC Meeting CERN, 11 February 2015.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
ISOLDE: Status report building th ISCC meeting CERN, 31 March 2014 Erwin Siesling, Magda Kowalska.
Bulding 245 schedule update LIU Booster Meeting Fulvio Boattini & Michel Obrecht TE-EPC / EN-CV TEEPC.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
SM18 INFRASTRUCTURE Crab Cavity CryoModule – Conceptual Design Meeting
Report from HEBT Working Group B.Goddard, CERN TE/ABT On behalf.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
AD/ELENA (B193) Hall Extension F. Butin. Status The need of a new building for AD was already discussed in 2010, First pre-study shown to GTPE 1st Sept.
Report from the HEBT working group + Commissioning plan and Schedule 5th HIE-ISOLDE Physics Coordination Group Meeting D. Voulot on behalf of HEBT and.
Update on the Laser Beam Line
The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 14/10/15.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Design, integration and installation milestones Legend: 2015/Q1= 1 st quarter of 2015 (January-March) Phase 1 = proton & laser beams operation Phase 2.
HIE-ISOLDE Project Status Report Y. Kadi for the HIE-ISOLDE Project Team HIE-ISOLDE Physics Coordination WG Meeting CERN, 16 February 2015.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Report from HIE-ISOLDE HEBT WG J.Bauche‎, P.Farantatos‎, M.Fraser‎, B.Goddard, Y.Kadi‎, D.Lanaia‎, D.Nisbet‎, E.Siesling‎, G.Vandoni‎, D.Voulot‎, E.Zografos.
2 Workshop 2014 Status of the Project Klaus Blaum, MPI for Nuclear Physics, Heidelberg for the Collaboration CERN, Geneva,
AD/ELENA (B193) Integration and constraints F. BUTIN / ELENA collaboration.
ISOLDE: Status report building th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska.
Floor plans, Infrastructure & Logistics Hie-Isolde Spectrometer Workshop Physics Department, Lund University 10 March, 2011 Hie-Isolde Erwin Siesling.
Plans and schedule for the Long Shutdown LS1 SGUI CERN, 2 February 2012 Hie-Isolde Erwin Siesling.
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
Status of the Design Study Richard Catherall EN-STI-RBS.
Technical Report for the ISCC Meeting 18 th May 2009 R. Catherall/ M. Lindroos.
HIE-ISOLDE Project Status Report 52nd ISOLDE & nTOF Technical Committee meeting February 3rd 2016 Y. Kadi On behalf of the HIE-ISOLDE Project Team.
HIE-ISOLDE Project Status Report CERN, July 3rd 2012  Project Schedule vs LS1  R&D Activities  High-Beta cavities  Prototype cryomodule.
Krzysztof Radwan, PJAS, TE/VSC/ICM Interlocks, Controls and Monitoring Section HIE-ISOLDE Vacuum Controls INSTALLATION.
Physics coordinator report 2015 overview 2016 schedule Safety & access B. 508 & 275 Karl Johnston.
Mid Term Review Meeting, 26 September * Research project supported by a Marie Curie Early Initial Training Network of the European Community’s Seventh.
Power, Cooling, Cables, Simulations of Heat Dissipation Short overview of ongoing work on these points Technical Coordination (Rolf Lindner et al.) Cooling.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
Richard Catherall EN-STI CERN, 3 rd November 2011 ISOLDE Technical Report for the INTC.
ISOLDE & HIE ISOLDE Status and Plans Richard Catherall EN-STI ISOLDE Technical Coordinator IEFC Workshop 7 th – 9 th March 2012.
HIE-ISOLDE Project 3 rd beam line + HELIOS June 16th 2015 (updated on June 18th) Y. Kadi, S. Maridor.
Plans and schedule for the Long Shutdown LS1 Hie Isolde Physics Coordination Group CERN, 1 March 2012 Hie-Isolde Erwin Siesling.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
HIE-ISOLDE Status Report Yacine Kadi on behalf of HIE-ISOLDE project team ISOLDE Annual Workshop, 5 December 2011.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Installation at Isolde (and costs) TSR at Isolde workshop CERN, 29/30 October 2012 Isolde Erwin Siesling.
Status and Future Perspective of the HIE-ISOLDE Project CERN, November 19-20, 2012
R2E Report – P5 Safe-Room Update 20 th LSC Meeting, September 13 th 2013 CERN Radiation 2 Electronics (R2E) Project 20 th LSC Meeting September 13 th 2013.
CC LLRF SM18 test plan and BA6 infrastructure
EHN1 Extension North Side wall (Removal of Existing services & platforms) Michael Jeckel & Bastien Rae.
Status HIE ISOLDE installation and shutdown work
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
WIC deployment and commissioning in HIE-ISOLDE
YETS Dec 2017 – March 2018 LS Experiments requirements / Services (un)availability F.Butin / EN-EA EACM meetings outcome, thanks to all participants.
HIE-ISOLDE Project Status Report
HIE-ISOLDE Project: Planning & Resources
HIE-ISOLDE Status & Summary of HIE-ISOLDE SC
HIE-ISOLDE Project Status Report
Report on HIE-ISOLDE Status
CERN’s MidTermPlan and the consequences for HIE-ISOLDE
Aziz AMAMOU EACM – 21th May 2019
Presentation transcript:

Layout Experimental hall Final status (?) 3rd HIE ISOLDE Physics Coordination Group meeting CERN, 3 September 2012 HIE-ISOLDE Erwin Siesling

Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 2 History: summer 2011

Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 2 m Decoupe murPlateforme prolongee Courtesy: Stephane Maridor Maximize space on floor 3

Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 4.1m 2 m Courtesy: Stephane Maridor 4 All racks on platform CV says NO... Cooling restrictions

Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 5 Hall 170 ventilation systems platform wall 1 st extension 2 nd extension

Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 6 platform wall 1 st extension 2 nd extension Hall 170 ventilation systems

Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 7 Max heat dissipation platform wall 1 st extension 2 nd extension Max 70kW 100kW ? Max 45kW

Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling Rack distribution

Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 6x3 RACKS “PC” 500A DIPOLE 45˚ 20 RACKS “PC” QUAD/STEERER 2x2 RACKS “PC” 250A DIPOLE 22.5˚ 3 spare RACKS dipole 5 VAC racks 2 BI racks(+3) 4 WIC racks Electric. Dist. racks Rack distribution

Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling Cable distribution All EPC, BI and VAC cabling installed in stage 1 before experiments in place – cables for stage 2(b) rolled and stored on the hall floor

Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling All EPC, BI and VAC cabling installed in stage 1 before experiments in place – cables for stage 2(b) rolled and stored on the hall floor Cable distribution

Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 12 Minimizing floor occupancy 2x2 RACKS “PC” 250A DIPOLE 22.5˚ 3 spare RACKS dipole 6x3 RACKS “PC” 500A (+1 cabling rack) DIPOLE 45˚

Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 13 Minimizing floor occupancy

Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 14 Heat to air dissipation 6x3 RACKS “PC” 500A (+1 cabling rack) DIPOLE 45˚ 20 RACKS QUAD/STEERER 2x2 RACKS “PC” 250A DIPOLE 22.5˚ 3 spare RACKS dipole 5 VAC racks 2 BI racks(+3) 4 WIC racks Max 4x12.5=50kW Max 29kW Max 12.5kW Max 2x4kW Max 5kW or Platform: Max 46.5kW to air (if spare runs for a 44.5 ˚ magnet) Floor: Max 50kW to air (if bend running at max) – leaving 20kW for experiments

Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 15 Alignment platform

Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 16 Nicole experiment?

Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 17 Acknowledgement EN/MEF: STEPHANE MARIDOR, ELEFTHERIOS ZOGRAFOS GS/SE: DANIEL PARCHET, ELISEO PEREZ-DUENAS BE/OP: DIDIER VOULOT EN/HDO: YACINE KADI EN/CV: PAUL PEPINSTER, BENOIT LACARELLE EN/EL: RENE NECCA EN/STI: RICHARD CATHERALL, ANA-PAULA BERNARDES TE/ABT: BRENNAN GODDARD BE/RF: MATHEW FRASER TE/EPC: MICHELE MARTINO

Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 18 Extra slides

Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling STAGE 1

Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling STAGE 2a

Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling STAGE 2b

Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling

Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling

26 Hie-Isolde Planning Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q Civil Main services Cryo CM 1&2 CM 3&4 5.5MeV/u 10MeV/u Beam Transfer Line CM 5&6 17 Dec Q sd CM1&2 Isolde & REX Ops shutdown LS1 Cryo Mod 1 & 2 install (Isolde normal operations) Timeline: sd Ventilation Demi water Electrical syst.s Start LS1 3 dec End LS1:Start Low E physics Commissioning (Isolde normal operations) Commissioning during shutdown (EBIS beam) Beam commissioning Nov. + 5 months Cryo only ready Feb 2014 Start-up 2015 HIE physics at 5.5MeV/u

Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 27 Commissioning planning