VELO upgrade news 19 January 2010. VELO Upgrade Survey  Not yet filled in, but last answers arriving in the next 24 hours....!  Hope to soon appoint.

Slides:



Advertisements
Similar presentations
Development of super module structures at Glasgow Calum I. Torrie 20 th April 2007.
Advertisements

ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
1 Pixel readout for a LC TPC LCWA 2009 – Detectors Tracking session 30 September 2009 Jan Timmermans On behalf of the Bonn/CERN/Freiburg/Nikhef/Saclay.
(An open-ended discussion with random slides attached…) OUTLINE: Layouts Common Issues / Distinguishing Issues U-Shape L-Shape (Si and Si+Diamond) How.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Velo Module 0 minus minus Paula Collins. Investigating Module 0 thermal performance Baseline module design combines elements of different CTE (and Young’s.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
SLHC Strip Tracker Module Envelopes (Tim) WP4 Meeting Glasgow, 13 th June 2011.
VELO Upgrade Critical Issues Two step upgrade with installation around 2013/2017 Implies a detector which can sustain 5/20/120 fb -1 Very tight schedule.
VELO upgrade Front-end ECS LHCb upgrade electronics meeting 12 April 2012 Martin van Beuzekom on behalf of the VELO upgrade group Some thoughts, nothing.
VELO Module Kickoff Summary Richard Plackett – VELO Pixel Chip Meeting CERN, 13th November 09.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Timepix Telescope Plans Proposed Work Packages for the Timepix Telescope Richard Plackett CERN, 8 th December 09.
Phase 2 Tracker R&D Background: Initial work was in the context of the long barrel on local tracklet- based designs. designs of support structures and.
Pixel 2000 Workshop Christian Grah University of Wuppertal June 2000, Genova O. Bäsken K.H.Becks.
Muon trigger upgrades, missing since not aimed towards DOE funding PHENIX upgrades: view presented to DOE R&D $3.5M Construction $16.6M Au-Au p-p 200 Si-Si.
Diamond detectors for the LHCb upgrade M. Artuso, A. Borgia, J. Garofoli, R.Mountain, P.Urquijo, J. Wang, Z. Xing 5/5/20101Marina Artuso Velo Upgrade Meeting.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
At the HERA collider in Hamburg an experiment (ZEUS) has been built to study electron-proton collisions. For the near future an upgrade of this experiment.
CBM Silicon Tracking System. Microstrip Detector Module Assembly and Test V.M. Pugatch Kiev Institute for Nuclear Research GSI (CBM experiment), Darmstadt.
Peter Sharp CERN CMS Tracker Summary of the Tracking Trigger Working Group Peter Sharp 21 November 2008.
1 FPCCD VTX Work Plan Y. Sugimoto 2010/1/22. 2 FPCCD: Features and R&D issues (1/2) Small pixel size (~5  m) –Sensor development Small size chip; ~6mm.
Local Supports to IDR Discussion ATLAS Upgrade Week November 2014.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
MTest Pixel Telescope – Status Update David Christian January 8, 2008.
July 7, 2008SLAC Annual Program ReviewPage 1 Silicon Tracking / Silicon Readout R&D Richard Partridge SLAC / Brown.
Vacuum Studies of LHCb Vertex Locator Sensors Gwenaëlle Lefeuvre, Ray Mountain, Marina Artuso Department of Physics, Syracuse University Abstract : The.
1. Efficient trigger for many B decay topologies Muon System CALORIMETERS PRS + ECAL+ HCAL RICH1 VERTEX LOCATOR Efficient PID Good decay time resolution.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
Towards the Work-package with LHCb for the LHCb upgrade DT-LHCb coordination meeting 13 January 2015.
Run II preparations Test beam plans Moving from 156 to 169 DT-LHCb coordination meeting June 2, 2015.
Status report Pillar-1: Technology. The “Helmholtz-Cube” Vertically Integrated Detector Technology Replace standard sensor with: 3D and edgeless sensors,
Tracker Upgrade Mechanical/Thermal Engineering 3 June meeting theme: Modules and Structures News on Phase 1 BPIX Upgrade Mechanics & Modules, R. Horisberger.
1/20 LHCb upgrade, Jeroen van Tilburg Nikhef Jamboree, 14 Dec 2015 Preparing for the LHCb upgrade.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Upgrade activities DT-LHCb coordination meeting 14 March 2016.
On-Module Interconnection and CNM Projects DEPFET Meeting, Bonn, February Ladislav Andricek, MPI für Physik, HLL  update on thinning  samples.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Work Package 1: Pixel detector systems for particle.
Technology and R&D Summary and next steps Burkhard Schmidt.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
13 May 2011 Eddy Jans 0 Plans for the VELOpix-module LHCb-Nikhef discussion some specifications some requirements some ideas about the VELOpix-module some.
9 December 2011Eddy Jans 0 LHCb-VELO CO 2 cooling plans CO 2 - meeting Present VELO - physics running in LongShutdown1 2013& physics running.
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
ATLAS Internal ID Service Integration
DT-LHCb coordination meeting 18 April 2016
Available detectors in Liverpool
SVT subchapters & editors
CERN PH-DT Physics Department (PH) Detector Technologies (DT)
SVT – SuperB Workshop – SLAC 6-9 Oct 2009
Hybrid Pixel R&D and Interconnect Technologies
Simulated vertex precision
PXD Summary Tests PXD9 Pilot Production ASICs Components Plans:
Strawman module design
TK Upgrade report.
Studies of Quad Pixel Module assembly using paper laminate
Work packages status in Torino and perspectives
The LHCb VErtex LOcator
Perugia SuperB Workshop June 16-19, 2009
Presentation transcript:

VELO upgrade news 19 January 2010

VELO Upgrade Survey  Not yet filled in, but last answers arriving in the next 24 hours....!  Hope to soon appoint coordinators of each work package. They must be available, enthusiastic, and able to: Establish contact with all interested parties and summarise progress to date in upgrade meetings Coordinate and plan activities Maintain web pages linked from  Following slides are indicative only

Strawman layouts  Many groups volunteered to provide ideas for layouts. One week to go! See Marco’s presentation from today me, or upload any idea (however crazy!) to

Work Package I Finalise ‘Strawman’ Layout  CAD drawings, cooling options, RF shield studies, physics impact of design variations (SU)  Addition of hybrid geometry option (SU) PIDC Contribute ideas (by 25 th January) 14 Study selected layouts with parametric simulation 14 Study selected layouts with full simulation 31 Contribute engineering cartoons11 Thermal simulations12 Foil R&D assessment11 Impact on electronics design3 Comments received (abbreviated!) and work in progress

Work Package II CO 2 vs LN 2 cooling choice PIDC Specify baseline CO2 solution1 Specify baseline LN2 solution 1 Risk Assessment3 Comments received (abbreviated!) and work in progress

Work Package III Module Cooling Structure PIDC CVD diamond procure test pieces12 CVD diamond irradiation tests02 CVD diamond thermal measurements 22 CVD diamond mechanical measurements 22 CVD diamond brazing and gluing3 CVD diamond Thermal simulations 12 CVD diamond cooling tube connection 21 Microchannel cooling assessment3 TPG/CF solution1 Cooling connections off module and at vacuum flange 1 Comments received (abbreviated!) and work in progress  Very small glass capillaries (several tenth of mm) for cooling as alternative for metal tubes connected to diamond. (N)  System Issues (SU)  Heat pipes (SU)  General CVD diamond studies (N)  Cooling pipe attachment, and feasibility studies of orbital welding of cooling tubes (N)  Alternative vendors (SU, Bristol)  Collaboration with DM for diamond irradiation and thermal properties (CERN)

Work Package IV Hybridisation Options PIDC CVD diamond metallisation tests2 Thin kapton, power tape development 1 MCM-D technology1 Hybrid connector choices2 Module wire bonding1 CVD diamond brazing1 CVD diamond gluing1 Interposer R&D1 BCB R&D1 Assembly of timepix to thinned silicon 11 PIDC Assembly of thinned timepix to thinned silicon 11 Assembly of first timepix stave21 Final module mechanical design (Jan 2012) 3 TSV technology11 Bump bonding technology11

Work Package IV (cont.)  Extra topic: relationship to tank structure. Gluing not just limited to CVD diamond gluing. (SU)  Information gathering excercise on metallisation, bump bonding, TSV, wafer thinning: study of Fermilab sampes (SU)  Bump bonding experience (SU)  RELAXD development synergy: Assembly of thinned timepix, TSV, Bump bonding (N) Comments received (abbreviated!) and work in progress  Collaboration with CERN PCB workshop for metallisation and multilayer substrate tests (CERN)  Collaboration with DM for diamond metallisation (CERN)

Work Package V Link Technology PIDC Optical/Copper transition31 High Speed Copper cables22 Feedthrough investigation31  Collaboration with NA62 useful  Initial contact with candidate vendor established (CERN)  Rad Hard FPGA investigation relevant? (SU) Comments received (abbreviated!) and work in progress

Work Package VI Sensor Technology Development PIDC Planar silicon: Guard ring options11 Planar silicon: silicon thickness optios 1 Planar silicon: prototype production and bond to timepix 2 Planar silicon: Evaluation of non- irradiated and irradiated modules 11 3d silicon sensor development for LHCb 1 3d sensors bonded to timepix1 3d sensors: Evaluation of non- irradiated and irradiated modules 1 Diamond sensor development for LHCb 2 Diamond sensors bonded to timepix 2 Diamond sensors: Evaluation of non-irradiated and irradiated modules 2  CVD diamond characterisation already started (strip detectors, soon modules with timepix/medipix, irradiation, characterisation (SU)  Edgeless sensors within RELAXD project (N)  Prototype production synergy with RELAXD project (N) Comments received (abbreviated!) and work in progress

Work Package VII Simulation Software Development PIDC Parametric Studies: Geant 3 based21 Parametric Studies: supply hit distributions etc. from Gauss+Boole 1 Boole core development11 Brunel core development: Pattern recognition1 Brunel core development: Tracking11 Use of official software to investigate electronic features 11 Electronic readout schemes in boole Trigger algorithms11 Gauss XML description, material budget1 Implement detector variations in XML1 Evaluate performance in selected physics channels11  Standalone simulation, Parametric simulation (GEANT3) Data flow simulation (SU)  Parameteric studies (N) Comments received (abbreviated!) and work in progress

Work Package VIII Electronics R&D PIDC Contribute new ideas for architecture 12 Chip design (digital or analog part)12 Provide simulations12 Design chip readout scheme and link integration 12 Test and irradiate prototypes2  Collaboration with Bruco started to develop ASICS for high speed links and r/o architectures. Will address Velopix issues (N)  Lab study of timepix (SU)  Day long work shop should be planned Comments received (abbreviated!) and work in progress

Work Package IX Infrastructure PIDC Timepix Telescope arm: Relaxd11 Timepix telescope arm: Interface Board 1 Timepix telescope arm: Chipboard1 Timepix telescope arm: Mechanics11 Timepix telescope arm: Services Timepix telescope arm: Pixelman Timepix telescope arm: PMTs11 Timepix telescope arm: Timing unit 12 DUT mechanics for telescope11 Development of test vacuum tank1 PIDC Outgassing testing facility1 Proton irradiation of components2 Other irradiation of components2 Development of laser scanning stand 3 Development of cosmic ray stand2  CO2 cooling test facility available (N)  Ensure infrastructure is available for sources as well as laser/cosmics (SU)

Designs in progress and construction....

Work Package X Foil R&D PIDC CF foil: assessment of R&D schedule 1 CF foil development1 Other11  Prototype fabrication (SU)  prototype testing (SU)  RF shield test stand (SU)  Material selection and tests, prototype fabrication and testing already initiated (SU)  Milling and super plastic deformation of AL foils) (N) Comments received (abbreviated!) and work in progress

Work Package XI Strip Option PIDC Strip parametrisation for Hamamatsu1 Follow Strip Chip development2 Comments received (abbreviated!) and work in progress