Mechanics R&D Ian Wilmut. Talk Scope This talk is to provoke conversation – not to direct activities. The slides should do no more than start the conversation.

Slides:



Advertisements
Similar presentations
Company Name Sample Template Presenter Name
Advertisements

Lesson 12 Taking action. Note to teacher These slides provide all the information you need to deliver the lesson. However, you may choose to edit them.
Using Connectives Correctly
Intro to Computer Org. Pipelining, Part 2 – Data hazards + Stalls.
Title Page Name: Course Code: Centre Number: Candidate Number: Project Title:
Polynomial Regression and Transformations STA 671 Summer 2008.
Observations Check the three observations that are GOOD observations applicable to this lab. Underline QUANTATIVE observations. □ The pennies are a circle.
Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
US Bracket Support for Stave D. Lynn (BNL), LBNL Mechanical Meeting, Sep
Quick Sort, Shell Sort, Counting Sort, Radix Sort AND Bucket Sort
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
AIR NAVIGATION Part 3 The 1 in 60 rule.
AIR NAVIGATION Part 3 The 1 in 60 rule.
Theoretical & Industrial Design of Aerofoils P M V Subbarao Professor Mechanical Engineering Department An Objective Invention ……
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Prototype sector Ian Wilmut Dec What we didn’t include in the proposal... A fully functioning electrical prototype of staves via services to DAQ.
Copyright © 2008 Emergency Training Solutions, LLC. All rights reserved. Firefighter I - Firefighting Basic Tools.
Whiteboardmaths.com © 2007 All rights reserved
Module mounting Ian Wilmut (RAL). Martin Gibson Martin has been developing the module mounting system at RAL for the last two years – everything we have.
Options This PowerPoint presentation consists of two examples.
Unit 12: Poverty ETHICAL CONSIDERATIONS "Eradicating poverty is an ethical, social, political and economic imperative of humankind"
Moodle using surveys and glossaries By Kris (feel free to decorate while I set up….I’ll get you started)
Week Six Topic Week Six Topic Copyright © Regis University, 2012.
2006 Palisade User ConferenceNovember 14 th, 2006 Inventory Optimization of Seasonal Products with.
…top ten sampling mistakes made most often. After 15 years experience with all types of product sampling programs… What are the TOP 10 mistakes I believe.
Tele-Sales Force (TSF) Lead Generation Campaign Script.
Replication Mechanisms for a Distributed Time Series Storage and Retrieval Service Mugurel Ionut Andreica Politehnica University of Bucharest Iosif Charles.
Sample size vs. Error A tutorial By Bill Thomas, Colby-Sawyer College.
Industrial Software Project Management Some views on project managing industrial and business software projects.
Moving to Agile in an FDA Environment
Applied Software Project Management Andrew Stellman & Jennifer Greene Applied Software Project Management Applied Software.
Raw Material & Sub-Assembly QA (Tim) 25/09/14 25/09/2014Material & Sub-assembly QA1.
CS Learning Rules1 Learning Sets of Rules. CS Learning Rules2 Learning Rules If (Color = Red) and (Shape = round) then Class is A If (Color.
IT253: Computer Organization
CoG and Speeding Building SPEED July 28, July-2011 Center of Gravity The Center of Gravity is the point where the object/figure balances Geometry.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
QoS NSLP draft-ietf-nsis-qos-nslp-06.txt Slides: Sven van den Bosch, Georgios Karagiannis, Andrew McDonald.
March OsC Report and Restructuring WP4. OsC Report 4.1 Tapes Bus tape designs have been completed for modules with 130nm ASICs which incorporate options.
WP4 – Plans for next 6 months
Berlin talk outline Draft 2 – 7 th March Introduction UK has recently started to systematically try and understand structural requirements and how.
Tilt angles reloaded, and status of some other things.
Plank #7 and beyond. 2 What was new for plank#7? Carbon-fibre jig Oversize (by 10mm) facesheets during stave core build –Facesheets now at the very limit.
European Fusion Power Plant Conceptual Study - Parameters For Near-term and Advanced Models David Ward Culham Science Centre (Presented by Ian Cook) This.
QMUL 2/2/12 1  Current status of new alignment system.  Drawing status update.  Laser alignment.  Module removal from frames for new kit.  Stave(lets.
Why A Software Review? Now have experience of real data and first major analysis results –What have we learned? –How should that change what we do next.
Project Setup and Execution For PMPlan Enterprise Presented by AlNik Solutions Copyright ©
Local Supports to IDR Discussion ATLAS Upgrade Week November 2014.
Stave Core Thermo-mechanical and Electrical Performance Requirements (Tim) 10/07/2013Liverpool WP4 Meeting (11/7/13)1.
1  2004 Morgan Kaufmann Publishers Locality A principle that makes having a memory hierarchy a good idea If an item is referenced, temporal locality:
Stave programme. 2 Staves recently build Stave#7 –I think is at QML –Intend was to aggressively thermally cycle and look for structural issues Stave#8.
While I’m away…. 2 I hope not this… 3 And not too much of this…
Bushy Binary Search Tree from Ordered List. Behavior of the Algorithm Binary Search Tree Recall that tree_search is based closely on binary search. If.
A hollow stave Ian Wilmut – August LBL stave At the March UG week LBL showed a prototype asymmetric stave. This prompted consideration of the strip.
Some Comments on the Use of CGL for the Foam-Pipe Interface 1 D. Lynn (BNL), LBNL Mechanical Meeting, Sep 2012 We have been using CGL exclusively in the.
PCAP Close Out Feb 2, 2004 BNL. Overall  Good progress in all areas  Good accomplishments in DC-2 (and CTB) –Late, but good.
44222: Information Systems Development
Warmup: Find your notebook. Take out a ½ sheet of paper. Put your name on it. On one side, number On the back, write numbers 20 and 21. For the first.
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
Mechanical Definitions & Equations Terms we need to know Equations we need to know.
Task 5: Test / Shipping Status Report. Overview  Where are we  Chamber  Stavelet holder frame  Module mounting frame  What next QMUL Sept 10.
3P SYSTEM Better, Faster, More Meaningful Grades.
Overcoming Barriers to Change
Section title This presentation is designed to help you talk to young people about Drive. The notes included aren’t intended to be read out, they are for.
What is Stave Carrier Frame Required to Do?
Cylinder design Ian Wilmut 10/11/11.
East Hall under construction
Are there better ways to build a stave?
Mechanics: (Tim).
Safety Hour Discussion Pack
Managing Change and Quality
Presentation transcript:

Mechanics R&D Ian Wilmut

Talk Scope This talk is to provoke conversation – not to direct activities. The slides should do no more than start the conversation. We have 60 minutes to cover the following R&D activities, and how we should take them forward: – Mechanical prototyping of staves – Support structures – Stave to structure Mechanical interfaces – Stave insertion – Material optimisation

Why have this discussion now? The baseline stave design is fairly mature – but the collaboration still knows remarkably little about what sits around the stave. Thus we don’t have a complete solution – what we need to do is complete the solution to make sure that we are making the right stave to get the lowest material, and an appropriate system. In real terms these questions need to be answered in the next 18 months as beyond that point a significant rework of the system is increasingly unlikely.

Stave prototyping We have a set of open questions on staves – we need to answer these first for the 250nm stave and then the 130nm stave. – What should the core be? – Are the C channels right? – How do we handle the Z=0 end – should there be a bar? Should there be U shaped foam? – How to smooth the surface of the co-cure? – Can we keep the plank flat through the build? I believe the questions above are independent of things outside our control. Have I missed any?

Structures The UK has no intent to design the final structures – but no one else is progressing it at the moment. What we need to address, is how we can understand the structure-stave material balance with the least possible effort. We should remember as we look at this problem that we are not trying to produce a final design of the cylinders – we are only trying to develop an understanding of the optimal design. Question: How will we establish how the stave and structure should share material and stiffness? Question: How and who will do this?

Stave to structure interfaces Stephanie has a locking point demonstrator that I feel is very convincing. Feeling is that we should prototype at least 3 staves with this system to trial run the whole system. Whilst that prototype is happening there are further developments we need: – How to mass produce these items? For PEEK and LCP E~10-15Mpa and ρ~1.5g/cc where aluminium E~70Mpa and ρ~2.7g/cc so Aluminium has a higher stiffness/X0 ratio. – When we have a chosen material what about creep? – Can we keep the staves symmetric? – How do we integrate with interlinks/end of stave? – How much material can we drive out in next iteration?

Stave insertion Stave insertion is part of the stave transport frame and very closely linked with integration I believe most of the below is on-going but a general discussion will make sure everyone understands the process – How and when to add the end of stave interlink? – If we have two part locking points, how and when are they added? – What will a single stave frame weigh? Is this the right number? – What protections are there for the stave during insertion? and placing into the insertion tooling? – How will the stave be slid in, locked, and the tooling removed?

Material optimisation X0 is the driving force behind any final design. We should always be aiming to provide the most efficient design for a given X0. The previous 4 slides all have X0 implications. We need to take the work of all areas and try and understand how much material we are putting in for our convenience – and ensure that it is well distributed between the sub systems i.e. – Stave stiffness vs structure stiffness – Locking point material vs material saved in stave because of good coupling – Extra material penalty of making removable locking points – Are removable insertion rails really less material?

Just to provoke… MaterialE (Gpa)Ρ(g/cc)D0 E/E ss X0 compared with SS (D0 ss *(E/E ss ))/D) lower is better Stainless steel Aluminium CFRP (high modulus) CFRP cloth Torlon121.6~ PEEK LCP141.5~ So assuming there are no manufacturing constraints aluminium might be a better choice than PEEK or similar This all assumes structural stiffness is the primary design feature

Discussion We have 60 minutes to cover the following R&D activities, and how we should take them forward: – Mechanical prototyping of staves – Support structures – Stave to structure Mechanical interfaces – Stave insertion – Material optimisation