Ancillary Services Methodology Changes Bill Blevins Manager, Operations Planning.

Slides:



Advertisements
Similar presentations
October 7, 2013 QMWG Ancillary Services Methodology Changes Bill Blevins Manager, Operations Planning.
Advertisements

INSULATING PRICE RESPONSIVE LOAD FROM RUC CAPACITY SHORT CHARGE Mark W. Smith J. Kay Trostle August 2008 DSWG.
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
1 Generation Adequacy Task Force Report to TAC April 7, 2005.
DSWG Update to WMS May 17, DSWG Goals Update.
ERCOT Load Forecast Uncertainty V2 August 2, 2006.
Loads Acting as a Resource Relationships with QSEs and LSEs
Electricity Markets Overview Lo-Cal seminar, 09/21/2010.
Utility Regulation March 10, 2011 Raj Addepalli Deputy Director, Electric, Office of Electric,Gas and Water New York State Department of Public Service.
NPRR 336, Authorize ERCOT to Procure Additional RRS During Severe Cold Weather Consideration of Tenaska and Luminant Comments.
NERC LTRA Update / CDR Capacity Counting Issues
Ancillary Services Methodology Changes for 2015 Sandip Sharma Bill Blevins Dan Woodfin.
SAWG Update to WMS February 4 th, 2015 Brandon Whittle.
Wind Cost Allocation Task Force Update to WMS February 17, 2009.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
QSE Managers Working Group Meeting Notes 3 February, 2010 Report to WMS 17 February, 2010 David Detelich - Chairperson.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
1 Ancillary Services Requirements for Future Ancillary Services Cost Benefit Analysis FAS/SIRS Meeting September 21, 2015.
Lead from the front Texas Nodal 1 External Web Services Update Nodal Implementation Team Presentation July 7, 2009.
Updated Cost/Benefit Analysis for PRR Part A/S Bidding Proposed Methodology.
Wholesale Market Subcommittee April 12, 2012 ERCOT Dynamic Ratings Application.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
PRS - RPRS Task Force Status Summary - August 14, PRS RPRS Task Force Status Summary Prepared for WMS and PRS August 2006.
Item 8, Technical Advisory Committee Meeting April 8, 2010.
1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/ Hour.
QSE Managers Working Group Meeting Notes 7 November, 2008 Report to WMS 19 November, 2008 David Detelich - Chairperson.
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
Presentation to House Regulated Industries Committee Chairman Phil King Trip Doggett Chief Operating Officer The Electric Reliability Council of Texas.
Nodal Program Update and SEWG Update COPS 1/11/2011 Jim Galvin.
MAPE Publication Neil McAndrews For Bob Ryan of Deutsche Bank.
December 18, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott January 6, 2015 TAC Update to RMS 1.
1 Market Trials Update NATF June 1, 2010.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
Analysis of ERCOT Regulation Service Deployments during 2011 David Maggio Market Enhancement Task Force Meeting 3/29/
Resource Adequacy Task Force (RATF) Update to WMS June 12, 2013.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
QMWG Update to WMS S. Looney February 5, NPRRs Referred by WMS NPRR589, Ancillary Service Offers in the Supplemental Ancillary Services Market –
October 02, 2009 Austin, Texas Quick Start Task Force Meeting 1.
RPRS TF and QSE Managers Report to PRS 1)Procurement (QSE Managers) 2)Cost Allocation (RPRS Task Force) –PRR 674 –PRR 676 –PRR 678.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
1 RPRS Market the issue of capacity inadequacy solved by the Local Congestion procurements ERCOT Feb 19, 2004.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) August 8, 2012 PDCWG August 9, 2012 ETWG/QMWG.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
QMWG Update to WMS S. Looney October 9, WMS Assignments NPRR564, Thirty-Minute Emergency Response Service – Discuss concerns expressed at last WMS.
MISUG Meeting Materials ERCOT 9/07/ MISUG Agenda 9/07/ Antitrust AdmonitionJ. Lavas9:30 a.m. 2.IntroductionJ. Lavas9:35 a.m. 3. Follow up.
ROS July 10, 2008 Meeting WOTF Update on ROS Action Plan Summary: EECP Step #2 (Feb.26 th, 2008) Mark Garrott WOTF Chair.
PRS RPRS Task Force Report from July 27 th Meeting Special PRS Meeting August 2, 2006.
RPRS Settlement Examples Market Support Services March 30, 2005 March 14, 2006 Presented by ERCOT Art Deller Bill Kettlewell.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
ROS Report Bill Hatfield 2014 ROS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public June 26, 2014 TAC Meeting.
ERCOT Monthly Operational Overview (January 2015) ERCOT Public February 15, 2015.
QSE Managers Working Group Meeting Notes 9 June, 2009 Report to WMS 17 June, 2009 David Detelich - Chairperson.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Next Steps on Reserve Discount Factor and 2016 Ancillary Service Methodology ERCOT Staff Date 02/25/2016.
QSE Managers Working Group Meeting Notes November 10, 2009 Report to WMS November 18, 2009 Jennifer Troutman – Vice Chair.
March 22, 2011 ERCOT Board of Directors Commercial Market Operations Version 2 - Updated on March 18, 2011 Betty Day.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
April 13, 2007 Regional Planning Group Meeting Wind Impact/Integration Analysis Warren Lasher Regional Planning.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
Future Ancillary Services Cost Benefit Analysis Overview Julia Matevosyan February 1, 2016 FAS Workshop.
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
GATF Loss of Load Process (or How to Make Sausage) October, 2012.
MISUG Meeting Materials ERCOT 7/26/ MISUG Agenda 1.Antitrust AdmonitionJ. Lavas9:30 a.m. 2.IntroductionsJ. Lavas9:30 a.m. 3.Market Data Transparency.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
Proposed 2012 Methodology for Determining Ancillary Service Requirements.
Presentation transcript:

Ancillary Services Methodology Changes Bill Blevins Manager, Operations Planning

2 Meeting Title (optional)Date Schedule for discussion with Stakeholders Week of 30th Sept Release the red-line version to stakeholders 7-OctQMWG 9-Oct/13-NovWMS 10-Oct/14-NovROS 5-DecTAC 10-DecBOD

3 Meeting Title (optional)Date Proposed Changes Update the factors used to adjust the Regulation Service quantities for additional installed wind generation Remove Load Forecast Bias from determination of Non-Spinning Reserve Service (NSRS) capacity

4 Quantity of Regulation Service for each hour is based on the required Regulation Service from the previous month and the same month of the previous year Additional installed wind generation will tend to add to the quantity of Regulation Service required; The 2008 GE Study has previously been used to adjust the required quantity of Regulation as new wind capacity was added Study was completed with data from –Not much wind data –Wind data was generated by AWS Truewind Regulation Service Adjustment for Additional Wind

5 ERCOT has updated the analysis from the GE study using actual wind output and uses the median of the regulation requirement for the last five years. Conclusions: –Relationships between Reg needed and MW wind is still linear –Overall, increase in Reg needed per MW increase in installed wind is slightly less than what GE Study predicted MW Changes in Regulation requirements are small; less than 5MW in any hour Regulation Service Adjustment for Additional Wind Link for Report on study to update the GE table

6 Morning ( )Mid-Day (1400) Evening (1800) Night (2300) Relationship between Reg Requirements and Wind Capacity

7 Reg Difference between using GE tables and updated tables

8 NSRS Load Forecast Bias - Background The NSRS Load Forecast Bias was originally implemented during the Zonal market due to perceived over-commitment (RPRS) by ERCOT based on day-ahead forecast – The day-ahead forecast, on average, may be biased toward the high side, since it is generally accurate on most days but may be significantly high on a relatively few days when unpredicted rain occurs –The “compromise” at the time the bias calculation was introduced into the A/S Methodology was that the load forecast would be reduced by the bias but the amount of NSRS would be increased by the same amount –With the addition of HRUC, ERCOT is now able to wait until closer to the Operating Hour to issue commitments, which provides QSEs the latitude to self-commit Resources in lieu of receiving an HRUC instruction

9 MTLF Model Comparisons - unbiased

10 Day-Ahead Daily Peak Model Error A few hours result in an “average” bias

11 Example of large forecast error – June 9, 2013 Day-Ahead weather forecast did not account for cooler temperatures Results in a large contribution to the bias

12 Day-Ahead Daily Peak Model Error High load hours – no bias

13 2 hour ahead Daily Peak Model Error (actual – predicted) Little or no bias

14 4 hour ahead Daily Peak Model Error (actual – predicted)

15 Problems with Current Implementation of Bias in Forecasting Meeting Title (optional)Date The bias is calculated based on the day-ahead error and applied not only to the Day Ahead load forecast but to the Real-Time load forecast as well. –The load forecast becomes more accurate as the time of the forecast approaches real-time The bias is applied to all three ERCOT load forecasts regardless of which forecast was actually used in determination of bias The posting of unbiased forecast and/or biased forecast has created communication issues for ERCOT with external entities.

16 August Day-Ahead Daily Peak Forecasts For August: Peak Forecast Error w/o bias (Predicted- Actual) A3: 1,082 MW A6: 1,182 MW ERCOT: 81 MW Bias at peak was 545 MW Peak Forecast Error including Bias (Predicted-Bias- Actual) A3: 537 MW A6: 637 MW ERCOT: (464) MW Bias results in ERCOT’s best forecast being low by 464 MW at peak. Accurate forecast was available

17 Overall NSRS Cost Savings If Load Forecast Bias was not applied to NSRS procurement, ERCOT would have saved –Cost Savings for Non-Spin = (original MCPC * original AS plan) – (original MCPC * new AS plan) This is true savings, since the offset would be for RUC commitments for capacity which rarely occur Meeting Title (optional)Date

18 RUCs for Capacity

19 QMWG Discussion  Some Market Participants had concerns about removing the load forecast bias completely from the AS Methodology  Suggestions were made to continue using the bias that looks at load forecast error that matches HRUC timeline.  Suggestions were also made about not including some of the rainy days when calculating the load forecast bias  There was general consensus that, the Control Room should use unbiased and most accurate Load Forecast

20 ERCOT’s Recommendation ERCOT recommends stakeholders to endorse the revised Ancillary Services Methodology which removes the load forecast bias adjustment from the Non-Spin Reserve procurement quantity and replaces the GE tables used to adjust the Regulation Service quantities for incremental wind additions with updated tables. Meeting Title (optional)Date