Technical Support 2008 1 6/26/08 PHENIX WEEKLY PLANNING 6/26/2008 Don Lynch.

Slides:



Advertisements
Similar presentations
Technical Support /7/08 PHENIX WEEKLY PLANNING 8/7/2008 Don Lynch.
Advertisements

Technical Support /23/08 PHENIX WEEKLY PLANNING 10/23/2008 Don Lynch.
PHENIX WEEKLY PLANNING 1/17/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
Technical Support /13/08 PHENIX WEEKLY PLANNING 11/13/2008 Don Lynch.
Technical Support /5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
1 7/02/2009 PHENIX WEEKLY PLANNING 7/2/2009 Don Lynch No Meeting this week due to July 4 th holidays. Slides have been updated. Next planning meeting will.
1 2/12/2009 PHENIX WEEKLY PLANNING 2/12/2009 Don Lynch.
Technical Support /12/08 PHENIX WEEKLY PLANNING 6/12/2008 Don Lynch.
1 1/22/2009 PHENIX WEEKLY PLANNING 1/22/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/21/2008 Don Lynch. 2/21/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /26/08 PHENIX WEEKLY PLANNING 10/2/2008 Don Lynch.
1 1/13/2011 PHENIX WEEKLY PLANNING 1/13/2011 Don Lynch No Meeting Today Due to snow shortened work week, today’s planning meeting has been cancelled. Slides.
8/9/20121 PHENIX WEEKLY PLANNING 8/9/2012 Don Lynch.
PHENIX WEEKLY PLANNING 4/10/2008 Don Lynch. 04/10/08 Shutdown ’08 Schedule Purge Flammable Gas, Magnet & DAQ TestsDone Remove lock-out & open shield wallDone.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
Technical Support /4/08 PHENIX WEEKLY PLANNING 9/4/2008 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /17/08 PHENIX WEEKLY PLANNING 7/17/2008 Don Lynch.
Technical Support /24/08 PHENIX WEEKLY PLANNING 4/24/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/6/2008 Don Lynch. 3/6/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /1/08 PHENIX WEEKLY PLANNING 5/1/2008 Don Lynch.
Technical Support /21/08 PHENIX WEEKLY PLANNING 8/21/2008 Don Lynch.
Technical Support /14/08 PHENIX WEEKLY PLANNING 8/14/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 11/2/06 Don Lynch. 11/2/06 Weekly Planning Meeting 2 New Detectors TOF West HBD RXNP MPC North.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
PHENIX WEEKLY PLANNING 1/10/2008 Don Lynch. 1/10/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 9/14/06 Don Lynch. 9/14/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
Technical Support /8/08 PHENIX WEEKLY PLANNING 5/8/2008 Don Lynch.
PHENIX WEEKLY PLANNING 12/6/2007 Don Lynch. 12/6/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
1 3/10/2011 PHENIX WEEKLY PLANNING 3/10/2011 Don Lynch.
9/27/20121 PHENIX WEEKLY PLANNING 9/27/2012 Don Lynch.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 10/20/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
Technical Support /5/08 PHENIX WEEKLY PLANNING 12/5/2008 Don Lynch.
PHENIX WEEKLY PLANNING 11/15/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going11/30.
PHENIX WEEKLY PLANNING 12/27/2007 Don Lynch. 12/27/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
Technical Support /19/08 PHENIX WEEKLY PLANNING 6/19/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
Technical Support /28/08 PHENIX WEEKLY PLANNING 8/28/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
Technical Support /15/08 PHENIX WEEKLY PLANNING 5/15/2008 Don Lynch.
PHENIX WEEKLY PLANNING 1/24/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
Technical Support /18/08 PHENIX WEEKLY PLANNING 12/30/2008 Don Lynch.
PHENIX WEEKLY PLANNING 12/20/2007 Don Lynch. 12/20/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
PHENIX WEEKLY PLANNING 5/7/2007 Don Lynch (Thursday is Monday this week)
PHENIX WEEKLY PLANNING 1/31/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
PHENIX WEEKLY PLANNING 10/26/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
PHENIX WEEKLY PLANNING 5/3/2007 Don Lynch. 5/3/2007 Weekly Planning Meeting 2 Schedule HyTec CM vibration modes test5/23/07 End of Run Party 6/29/07 Next.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
1 7/16/2009 PHENIX WEEKLY PLANNING 7/16/2009 Don Lynch.
Technical Support /16/08 PHENIX WEEKLY PLANNING 10/16/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
Technical Support /22/08 PHENIX WEEKLY PLANNING 5/22/2008 Don Lynch.
1 7/9/2009 PHENIX WEEKLY PLANNING 7/9/2009 Don Lynch.
PHENIX WEEKLY PLANNING 11/8/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish Elec. Cooling Water upgrade(CA) (under.
1 8/20/2009 PHENIX WEEKLY PLANNING 8/20/2009 Don Lynch.
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 2/14/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Presentation transcript:

Technical Support /26/08 PHENIX WEEKLY PLANNING 6/26/2008 Don Lynch

Technical Support /26/08 Shutdown ’08 Schedule Design & Safety Review Action Items: Mu Trigger Platform review (Pearson) RPC Prototype InstallationIn progress New BeampipeWaiting for Funding CM CraneWaiting for Vendor response Sta. 1 and MMN ScaffoldingInspect after Complete (Pearson) RPC Factory: Prototype C tests in progress Prototype D Testsgaps & module frames received Dark Current test standin design Mu Trigger FEE upgrade: Station 2/3 scaffoldingcomplete, needs inspection Station 1 scaffoldingin progress finish by 6/27 Rack components (N&S)on order Rack assemblyin progress finish by 7/11 LV cable prepin progress finish by 7/15 N&S platforms Fabricate & installfabrication in progress, install by 8/15 (Pearson)

Technical Support /26/08 Shutdown ’08 Schedule Mu Trigger FEE Upgrade (cont’d): Prep work for platforms (water/elec)in progress finish by 7/15 FEE installation N&S sta’s. 1,2 & 3Aug-Sep FEE water and dry air installationAug-Sep Optical cable prepJuly LV cable installationJuly-Aug optical cable installationJuly- Aug Rack (N&S) installationJuly 15+ Install FEE’s in MMS for RPC testSep. Install FEE South platformSep. Install S rack cooling & electricOct. Rack room electronics, etc.Sep.– Oct. Final rack utilities Sep.-Oct Testing Sep.-Nov. RPC engineering & safety reviewJuly 10&11 RPC proptotype installation: Prep workcomplete by July 31 move (7) MuID pipes move gap 5 south cable tray Rack prepComplete by Aug 29 RPC prototype gas systemJuly - Aug

Technical Support /26/08 Shutdown ’08 Schedule, cont’d RPC proptotype installation (cont’d): Move shielding for installationJuly - Sep RPC prototype cable routing & supportJuly - Aug Modify crystal palace & vapor barrierJuly - Aug RPC prototype install Sep. – Oct. (RPC2 – PHENIX) (RPC3 – C. Pearson) Sep. - Oct. Install rack in tunnel southSep. Replace tunnel shieldingNov. (C. Pearson) Connect electronics/gas Sep. – Nov. MuTr Decapacitations (Sta. 1 N and MMN)July - Sep Fan Tray maintenancein progress (on going fill-in) HBD InstallSep.-Oct. PC1 west work (needs planning)Sep. – Nov. CM Crane InstallOct. DC East?/West RepairsOct. – Nov.

Technical Support /26/08 Shutdown ’08 Schedule, cont’d Remove all inst’n equipment(e.g. scaffolds)Oct. - Nov Gap 5 north piping and cable tray re-loc.Oct. – Dec. Gap 2 north cable tray & crate re-mountsOct. – Dec Prep for shutdown 2009Nov. - Dec Prep for run 9Dec Close shield wall start shifts Dec. Start physicsJan 1

Technical Support /26/08 1) Run Power to new MuTrgr FEE racks on MMN and MMS - Final design of the reworked North Muon Power Distribution System is set. Nearly all material acquired eithout cost. Paul is m revising the One-Line electrical drawing. CAD approval required…maybe by next week. Effort should take ~ 1 week. Then the new MuTrigger North power cable can be installed to the rack location, preferably after the rack platform is installed… The power for the South Trigger Rack(s) to be taken from an existing (spare) breaker in the Muon Tracker power panel. This should take less than 1 day to install. 2) Install power and signal cable tray (ceiling suspended) for new DCM rack row – north of existing DCM racks. - on Hold until new floor plan is determined 3) Install power feeds to RPC north & south tunnel racks from IR power panels. – Plan is to run the cables from the IR to the North tunnel rack locations. The south RPC rack power can be taken from the existing (spare) breakers in the SMI power panel located on the IR south west wall. These cable runs may take a few days to complete due to new power tray runs required into the tunnel areas. 4) Assist in signal and LV cable installation for MuTr/RPC upgrades as necessary. 5) Upgrade power capacity of Central Magnet power distribution for future bridge rack loads. a) Remove existing 15KVA transformer and install 45KVA unit. b) Install new (larger size) power cable from rack room to Central Magnet distribution breaker panels. - This job is on hold. No new racks in CM this year. 6) Install 120 volt AC power drops into new control room annunciator alarm rack (rack room). Shutdown ’08 Electrician Work

Technical Support /26/08 MuTrigger FEE LV Cable and Racm Prep in progress

Technical Support /26/08 MuTrigger FEE Rack Utilities Need to install Tee’s on supply and return lines: both s/b ¾ to supply Mu Trigger North rack and future rack

Technical Support /26/08 To match absorber and prototype RPC’s, we need to install new FEE upgrades in these 5 MuTR FEE’s We will develop a plan to access these for installation and testing from a custom work platform (to be designed). MuTrigger FEE upgrades in MMS in support of RPC prototypes

Technical Support /26/08 CM Access Nothing new this week. Main stairs have been drafted into Station 1 scaffolding

Technical Support /26/08 MMS Scaffolding & Access for This year FEE’s in MMS

Technical Support /26/08 RPC Factory Support Prototype D Module Gaps being prepared for test Gap/Module Storage shelves/Humidifier

Technical Support /26/08 RPC Factory Support, cont. Dark Current Test Stand Specs: Chamber gas flow (?) HV supply 10,000 V Hold time 72 hrs 10 shelves each to hold a 76” x 50” (approx. max.) Gap module. Trip points <20  A Current <1  A Shelf surface: flat and non-conductive

Technical Support /26/08 RPC Prototype Installation dimensions needed: 1. Coarse dimensions to external structure faces for initial installation 2. Precise dimensions to external survey markers (to be applied during assembly by BNL surveyors to allow precision alignment adjustments with BNL survey in tunnel. 3. (Note: Final RPC’s should include assembly fixturing for precision location of external survey markers.) RPC Prototype Installation

Technical Support /26/08 RPC Absorber Concept

Technical Support /26/08 July 10 8:30--12:30 Engineering Review of MuTrigger RPCs: Fabrication, Installation and Integration: 1008 Conference Room 8:30—8:45 Overview Matthias PerdekampUIUC 8:45—9:15 RPC Design Ralf Seidl RBRC 9:15—10:25 RPC Installation Larry Bartoszek UIUC 10:25—10:45 RPC Assembly Rusty Towell Abilene 10:45—11:15 Coffee and Discussion 11:15—11:30 Bakelite Procurement Ken Barish Riverside 11:30—11:50 RPC Gap Production Kyong Sei Lee Korea 11:50—12:10 RPC Box Hardware Xiaomei Li CIAE 12:10—12:30 RPC Q&A Young Jin Kim UIUC 12:30—1:30 Lunch 1:30--3:00 MuTrigger RPC Safety Review Presenters: Steve Boose, Rob Pisani, Paul Gianotti CA-D Experiment Safety Committee 3:00—3:30 Coffee and Discussion 3:30—3:50 RPC FEE Cheng-Yi Chi Columbia 3:50—4:10 Trigger Electronics John Lajoie ISU 4:10—5:00 Schedule Matthias Perdekamp IUC 5:00—5:50 Budget & Manpower John Hill ISU July 11 9:00—12:00 Follow Up Engineering Issues : 1008 Conference Room 9:00—12:00 Follow Up Cost, Schedule and Technical : Room Physics Proposed Agenda for RPC Review July 10,11

Technical Support /26/08 Detector upgrade Rack allotments New Platform HBD/RXNP (not shown) MuTrgrFEE N MuTrgrFEE S VTX Power FVTX NCC N NCC S RPC1 S RPC1 N New Platform RPC1 NS VTX FEM

Technical Support /26/08 Rack Room Reorganization Inventor model in progress

Technical Support /26/08 Fan Tray Maintenance in progress

Technical Support /26/08 CM Crane, Station 1 scaffolding CM Crane procurement postponed Until FY09 Response from Vendor (The Bartholomew Co. local distributor for GORBEL) received. Sent to CA safety for review.

Technical Support /26/08 Safety, Security, etc. 1. ISO and review – passed. 2. CAD Safety modified confined space requiremnts for NMM access: above removed lampshades: no confined space requirements. Below this level confined space training is required. 2 person rule always applies. 3. Laura Biscemi form HP surveyed north and south tunnels for RPC installation. A pathis to be established for working where TLD’s will not be required during shutdown. During run maintenance periods all tunnel areas will still require TLD’s and Rad worker 1 training. 4. Training updates for PHENIX technical staff. Required RW training removed from some. Other Required changed to optional. Everyone up to date on JTA’s except Carter (Haz Waste) & Paul (Contracts, CPR & Haz Com) Most up to date on Required Courses. If RW is Required please take before start of next run. Questions- see me.

Technical Support /26/08 Where To Find PHENIX Engineering Info Links for the weekly planning meeting slides, long term planning, pictures, videos and other technical info can be found on the web site: No Planning Meeting next week due to 4 th of July Holidays Those taking Vacaton Days: Enjoy !!