3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee 10.1.2013 CERN, 18.December 2013 Uli Raich.

Slides:



Advertisements
Similar presentations
Lyon 2005 DIPAC Lyon th DIPAC Lyon June 2005Ulrich Raich CERN AB/BDI Instrumentation in small, low energy machines Ulrich Raich CERN AB-BDI.
Advertisements

LINAC4 and 3 MeV test stand at CERN
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
Novel Beam Diagnostics on PXIE Vic Scarpine, FNAL 2nd Annual PASI Meeting April 3-5, 2013.
Bunch shape monitor for Linac-4 A.V.Feschenko Institute For Nuclear Research (INR), Moscow , Russia.
Experience with Bunch Shape Monitors at SNS A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
Ulrich RaichLinac-4 instrumentation day May 2007 Longitudinal Bunch Shape Monitor U. Raich.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
Budget Summary Linac-4 Instrumentation review CERN, Uli Raich BE/BI.
What I figured out up to now PP a-AKE_MACS_week_BDC_intro.pptm A. Kerschbaum BD controls MACS week 1.
Managed by UT-Battelle for the Department of Energy SNS MEBT : Beam Dynamics, Diagnostics, Performance. Alexander Aleksandrov Oak Ridge National Laboratory.
AS Diagnostic Collaboration Mark Boland
ESS DTL beam commissioning
Status of the FETS Laserwire Scanner David Lee UKNFIC Meeting
Laser based Emittance Measurement for LINAC4 Project Overview & Current Status T. Hofmann, E. Bravin, U. Raich, F. Roncarolo, F.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
Laser Stripping and H 0 monitor systems 10/18/2011B.Cheymol, E. Bravin, U. Raich, F. Roncarolo BE/BI1.
Linac4 FBCT’s 18/ L4 BI BCT review Lars Søby On the behalf of: M. Andersen, D. Belohrad, L. Jensen, Franco Lenardon and J. C. Allica Santamaria.
Uli Raich CERN BE/BI Instrumentation for the new H - Source Test Bench Linac-4 Ion Source Review 2011 Uli Raich CERN BE/BI Linac 4 ion source review, CERN.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Linac-4 current situation and outlook U. Raich, F. Roncarolo, F. Zocca.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Beam diagnostics in the beamlines
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Beam Instrumentation for the HIE-ISOLDE linac Francesca Zocca ISOLDE Workshop and Users Meeting December CERN Instituto de Estructura de la.
The Stripping Foil Test Stand in the Linac4 Transfer Line
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
HIE-ISOLDE diagnostic boxes Esteban D. Cantero CERN BE-BI-PM HIE-ISOLDE meeting for BE/BI 28 March 2014 The research leading to these results has received.
Beam Halo Monitoring using Optical Diagnostics Hao Zhang University of Maryland/University of Liverpool/Cockcroft Institute.
BPM stripline acquisition in CLEX Sébastien Vilalte.
K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical.
3 MeV test stand measurement plans A. Lombardi for the LINAC4 team 10/01/2013BCC MeV test stand measurements1.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
ALICE setup: update on the installation 18/10/2010 Angela Intermite.
CERN, 29.January 2009Uli Raich AB/BI 3 MeV instrumentation commissioning U. Raich Linac-4 Beam Coordination Committee
1 NBI Rh. Jones (CERN - AB/BDI) CNGS Target Area Beam Position Monitors OUTLINE 1.Recap of Requirements & Layout 2.Monitor Candidates -Secondary.
SNS Beam Diagnostics A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
Working Group 5 ProjectX Collaboration Meeting April 12-14, 2011 Summary Talk M. Wendt and W. Blokland Controls, Instrumentation & Protection.
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
ApEx needs for CeC PoP Experiment December 11, 2015.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
PXIE warm front end status A. Shemyakin PIP-II technical meeting 3 May 2016.
PXIE Beam Instrumentation Status Update Vic Scarpine Weekly PIP-II Meeting June 7, 2016.
September 12-13, 2013 BNL Laser Profile, Energy and Space Charge Potential Monitor Deepak Raparia September 26, 2013.
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
ESS Beam Diagnostics Overview Andreas Jansson / BI Group Beam Diagnostics Mini-workshop
Overview of Present and Future Laser Diagnostics for Fermilab H- Accelerators Vic Scarpine, Fermilab Presenting for the H- laser diagnostics team 26 Sept.
ESS Front End diagnostic
3 MeV Measurements at Lianc4 1 Veliko Dimov (for the source and linac team) (J-B Lallement, J. Lettry, A. Lombardi, D. Fink)
Beam Diagnostics for the FAIR Proton LINAC RFQ Workshop at GSI
Beam Commissioning Adam Bartnik.
NICA injection complex status
Experience with beam instrumentation at Linac4
Beam Diagnostics Instruments
BE-BI Software for LINAC4
F. Zocca, F. Roncarolo, B. Cheymol, A. Ravni,
Have a chance to operate your own beam at CERN
LINAC 4 source & LEBT measurement results
LINAC4 LEBT beam size and emittance diagnostics
LINAC4 commissioning plans etc.
Electron Source Configuration
Beam Current Monitoring with ICT and BPM Electronics
Considerations on Beam Diagnostics Physics
commissioning and measurements
Linac Diagnostics Commissioning Experience
(Beam) Commissioning Plan
Gain measurements of Chromium GEM foils
Measurement of the beam (transverse) emittances
Presentation transcript:

3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee CERN, 18.December 2013 Uli Raich BE/BI

Current Setup CERN, 18.December 2013 Uli Raich BE/BI

LEBT CERN, 18.December 2013 Uli Raich BE/BI Faraday Cup BCT Wire Grids

MEBT (chopper line) CERN, 18.December 2013 Uli Raich BE/BI BCT BWS

Measurement Bench CERN, 18.December 2013 Uli Raich BE/BI Emittance Meter Slit Emittance Meter Grid BCT BSM Spectrometer Magnet Spectrometer Grid Halo Monitor BCT BPM

Instruments installed LEBT: –Faraday Cup –Wire Grid MEBT (chopper line) –2 wire scanners –2 Beam Current Transformers (BCTs) Measurement Line –Slit/Grid Emittance meter –2 BCTs –2 (3) Beam Position Monitors (BPMs) –Bunch Shape Monitor –Spectrometer –Halo Monitor CERN, 18.December 2013 Uli Raich BE/BI

Measurement campaigns ~ 3 months at the 3 MeV test stand May – October move and re-installation into the L4 tunnel Since November ~ 3 weeks of measurements CERN, 18.December 2013 Uli Raich BE/BI

Faraday Cup Connected to remotely accessible Oscilloscope Guard ring polarization set to -1000V CERN, 18.December 2013 Uli Raich BE/BI

Wire Grids in LEBT CERN, 18.December 2013 Uli Raich BE/BI 24 wires per plane with spacing 1mm, 3mm, 5mm Wire signals sampled with 250 kHz

Wire Grid in LEBT CERN, 18.December 2013 Uli Raich BE/BI Can polarize frame and wires Measurements for different solenoid settings Add wire signals and compare to FC Frame needs to be polarized, wire polarization is less important

Beam Current Transformers CERN, 18.December 2013 Uli Raich BE/BI Instrument mostly used to see if beam arrives Signal sampled at max. 200 MHz (2 samples added -> 100 MHz) Multiple level shielding Calibration after each beam pulse

BCT signals White areas show integration windows CERN, 18.December 2013 Uli Raich BE/BI

BCTs give an idea on chopper rise time CERN, 18.December 2013 Uli Raich BE/BI

Wire scanners 40 um carbon wires First X-shaped, now L-shaped Wires can be polarized Readout at 205 kHz Now configured in L-shape CERN, 18.December 2013 Uli Raich BE/BI

Wire Scanners and Chopper CERN, 18.December 2013 Uli Raich BE/BI

Crosstalk between wires On L-shaped wire scanners crosstalk from one wire to the next can be separated Measured crosstalk when increasing positive wire polarization Profile size shows ~ 2% dependence on wire polarization up to ~ 40V. CERN, 18.December 2013 Uli Raich BE/BI

Crosstalk versus polarization CERN, 18.December 2013 Uli Raich BE/BI WS2 – 0VWS2 – 5VWS2 – 10VWS2 – 15VWS2 – 20VWS2 – 40VWS2 – 60VWS2 – 80VWS2 – 100VWS2 – 120V

Emittance Meter CERN, 18.December 2013 Uli Raich BE/BI Labview program sets Motor position of slit and grid (controlled by PLC and FESA) Accesses FESA class to control Amplifier gain, plane... Reads ADCs and saves data in.csv format for further evaluation 1 emittance plot every 4 µs

Beam position monitors BPMs measure Position Intensity Phase CERN, 18.December 2013 Uli Raich BE/BI

Intensity BCT-BPM CERN, 18.December 2013 Uli Raich BE/BI

Bunch Shape Measurements Has been used to adjust the bunchers in the test stand Brought back into operation in the L4 tunnel No bunch shape measurements yet because of missing buncher control CERN, 18.December 2013 Uli Raich BE/BI

22 Concept of Laser Emittance Meter Diamond Detector H - beamH 0 beamletbeamlet after drift Principle: H-H- H0H0 Bending Magnet x-scan y-scan H - beam Diamond Detector TypePolycrystallin e Size18 x 18 mm Resolutio n 5 channels Thicknes s 500 µm Readout5 GS/s Scope Pulsed fiber-laser Wavelength1080 nm Energy0.9 mJ t pulse 110 ns Beam quality – M Repetition rate30kHz Beam transport Fiber Particles strippe d / bunch < 4e5

23 Setup at 3 MeV Diagnostics Testbench Laser Focusing Laser Delivery optics Diamond Detector Bending Magnet H - beam H0H0 Fiber delivery