Coupled-bunch oscillation feedback studies 1 H. Damerau LIU-PS Working Group Meeting 20 February 2013 Many thanks to R. Garoby, S. Gilardoni, S. Hancock,

Slides:



Advertisements
Similar presentations
M.Gasior, CERN-AB-BIBase-Band Tune (BBQ) Measurement System 1 Base-Band Tune (BBQ) Measurement System Marek Gasior Beam Instrumentation Group, CERN.
Advertisements

Measurements of adiabatic dual rf capture in the SIS 18 O. Chorniy.
LONGITUDINAL (IN)STABILITY WITH BATCH INJECTION T. Argyropoulos, P. Baudrenghien, C. Bhat, J. E. Muller, T. Mastoridis, G. Papotti, E. Shaposhnikova,
IU e-Cloud Feedback Workshop March 13, 2007 LA-UR Review of the e-p feedback experiments Rod McCrady Los Alamos National Lab.
Spectrum analyser basics Spectrum analyser basics 1.
Longitudinal instabilities: Single bunch longitudinal instabilities Multi bunch longitudinal instabilities Different modes Bunch lengthening Rende Steerenberg.
H. Damerau, S. Hancock, LHC Beam Studies Review 28/08/2012 PS: the Longitudinal Plane 1 H. Damerau, S. Hancock LIU Beam Studies Review Meeting 28 August.
Impedance measurements at SLS E. Koukovini-Platia CERN, EPFL TIARA mid-term meeting, Madrid, 13 th June 2012 Many thanks to M. Dehler, N. Milas, A. Streun.
“What you get” Transverse damper system (ADT) F. Dubouchet W. Höfle G. Kotzian D. Valuch Special thanks to: A. Boucherie, A. Butterworth, S. Calvo, G.
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
22/03/1999A.Blas1 Hollow bunches A. Blas, S. Hancock, S. Koscielniak, M. Lindroos, F. Pedersen, H. Schonauer  Why: to improve space charge related problems.
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
BEPCII Transverse Feedback System Yue Junhui IHEP , Beijing Sep 17 th, 08IMAC.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Final results of the E-Cloud Instability MDs at the SPS (26 and 55 GeV/c) G.
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
T. Argyropoulos, LIU /04/2013 Progress in the SPS: RF studies and beam quality T. Argyropoulos, T. Bohl, J. E. Muller,, H. Timko, E. Shaposhnikova.
Collected by E. Jensen, BE-RF 1 ATOP days RF limitations.
Mathilde FAVIER Fellow in BE/BI/QP Mathilde FAVIER BE/BI-QPSCHOTTKY STATUS - BI DAY - December 6th
Beam observation and Introduction to Collective Beam Instabilities Observation of collective beam instability Collective modes Wake fields and coupling.
BBQ system Tatiana and Benoit, thanks to a lot of help from Christian Boccard, Marek Gasior and Ralph Steinhagen (BE/BI-QP)
Beam loss and longitudinal emittance growth in SIS M. Kirk I. Hofmann, O. Boine-Frankenheim, P. Spiller, P. Hülsmann, G. Franchetti, H. Damerau, H. Günter.
0 1 Alternative Options in the Injectors – Preliminary Summary H. Damerau LIU-TM#8 18 October 2013 Many thanks for discussions and input to T. Argyropoulos,
RF issues with (beyond) ultimate LHC beams in the PS in the Lin4 era 0.
Booster Dampers Update Nathan Eddy PIP Meeting 4/30/14.
Elias Métral, LHC Beam Commissioning Working Group meeting, 08/06/2010 /191 SINGLE-BUNCH INSTABILITY STUDIES IN THE LHC AT 3.5 TeV/c Elias Métral, N. Mounet.
Double RF system at IUCF Shaoheng Wang 06/15/04. Contents 1.Introduction of Double RF System 2.Phase modulation  Single cavity case  Double cavity case.
Summary of Booster Dampers Systems Dave McGinnis December 7, 2010.
New PS one-turn delay feedbacks and further developments Thanks to Alfred Blas, Heiko Damerau, Guido Sterbini, Simone Gilardoni, Letizia Ventura, Valentin.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
High Bandwidth damper Input from W.Hölfe Acknowledgement to all collaborators at SLAC, INFN, LBNL and CERNL Presentation of recent MD results (J.Cesaratto):
Chromaticity dependence of the vertical effective impedance in the PS Chromaticity dependence of the vertical effective impedance in the PS S. Persichelli.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
ADT Tune Measurement F. Dubouchet, W. Hofle, D. Valuch Acknowledgement: R. Calaga, F. Roncarolo, E. Bravin, shift crews New developments and tests on August.
L. Ventura, H. Damerau, G. Sterbini MSWG MEETING, June 19 th 2015 Acknowledgements: S. Gilardoni, M. Haase, M. Migliorati, M. Paoluzzi, D. Perrelet. 1.
Some ideas for/from the SPS LIU-SPS team. Scrubbing (only) for ecloud in SPS? aC coating remains baseline..... –but scrubbing has many potential advantages.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
News on TMCI in the SPS: Injecting high intensity bunches Benoit for the MD team: T. Bohl, K. Cornelis, H. Damerau, W. Hofle, E. Metral, G. Rumolo, B.
Damping of Coupled-bunch Oscillations with Sub-harmonic RF Voltage? 1 H. Damerau LIU-PS Working Group Meeting 4 March 2014.
Coupled bunch instabilities in the CERN PS
Experience and Perspectives of Transverse Feedback Systems for Scrubbing Thanks to: SPS OP crew and colleagues from BE-ABP and BE-RF, for their support.
1 Consequences of RF system failures during LHC beam commissioning T.Linnecar AB-RF.
F. Caspers, S. Federmann, E. Mahner, B. Salvant, D. Seebacher 1.
Beam loss and radiation in the SPS for higher intensities and injection energy G. Arduini 20 th November 2007 Acknowledgments: E. Shaposhnikova and all.
RF measurements during floating MD in Week 40 3 rd of October 2012 LIU-SPS BD WG 25/10/2012 Participants: T. Argyropoulos, H. Bartosik, T. Bohl, J. Esteban.
ADT kickers and amplifiers in tunnel point 4 of LHC, RB44 and RB46 1 W. Hofle LHC Transverse Damper LARP CM20 Napa April 8-10, 2013 LHC Transverse Damper.
Interferometric Residual Phase Noise Measurement System Pakpoom Buabthong Lee Teng Internship Program Advanced Photon Source Accelerator System Division,
LFB, LLRF, TFB Alessandro Drago Annecy, March 2010.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
By. Jadhav Avinash J Roll no - 2K13E11. Reference: Hewlett Packard Agilent Technology Wikipedia GwINSTEK.
Longitudinal Limitations of Beams for the LHC in the CERN PS 0.
Jørgen S. Nielsen Center for Storage Ring Facilities (ISA) Aarhus University Denmark ESLS XXIII (24-25/ ), ASTRID2 facility 1.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Preliminary results of the E-Cloud Instability MDs at the SPS G. Rumolo, in.
Loss of Landau damping for reactive impedance and a double RF system
Theory, observations and mitigation of dancing bunches in the Tevatron
Alternative/complementary Possibilities
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Longitudinal beam parameters and stability
Saturday 21st April 00:33 Interlock during ramp on BLM HV
A. Al-khateeb, O. Chorniy, R. Hasse, V. Kornilov, O. Boine-F
The SPS 800 MHz RF system E. Shaposhnikova for BE/RF
SPS Transverse Damper System
Limits on damping times
The LHC25ns cycle in the PS Triple splitting after 2nd injection
Introduction to LHC beam production in PSB and PS
Beam dynamics requirements after LS2
DEMONSTRATION OF TRIPLE BUNCH SPLITTING IN THE CERN PS
Collective effects in the SPS and LHC (longitudinal plane)
Presentation transcript:

Coupled-bunch oscillation feedback studies 1 H. Damerau LIU-PS Working Group Meeting 20 February 2013 Many thanks to R. Garoby, S. Gilardoni, S. Hancock, M. Migliorati, E. Shaposhnikova, L.Ventura

Overview 2 Introduction Measurements and mode analysis Excitation, symmetry of modes Mode scans Kick voltage Cross damping Preliminary summary

Overview 3 Introduction Measurements and mode analysis Excitation, symmetry of modes Mode scans Kick voltage Cross damping Preliminary summary

4 Introduction To control longitudinal coupled-bunch oscillations, a new wide- band kicker cavity will be installed during LS1 For MD studies, the spare 10 MHz cavity C10-11 can be used as kicker cavity for the feedback  Tuned to the modes to be damped, low bandwidth  But huge kick voltage available for MDs Difficult to perform tests in 2012 as the coupled-bunch feedback was required for high-intensity beams to the LHC  Extensive studies during this year’s short run  Summary of few measurements, >80% of data yet to be analyzed  All results are still preliminary

Coupled-bunch oscillations, time domain 5 Bunches oscillate with different phases (and amplitudes) Example of an n = 12 mode (  ≈ 206  ) Mode number defined by phase advance from bunch-to-bunch: Additionally the bunches may oscillate dipolar (m = 1), quadrupolar (m = 2), sextupolar (m = 3), etc. Present analysis: dipolar modes, m = 1  How does this look like in frequency domain?  = 2  n/h

Coupled-bunch oscillations, freq. domain 6  Synchrotron frequency sidebands of the f rev harmonics: F. Pedersen, F. Sacherer, PAC77, pp  In the case of LHC-type beams in the PS (h = 21) upper lower

Coupled-bunch oscillations, freq. domain 7 upper lower  Each mode n is observable as an upper side-band of n f 0 or as a lower sideband of (h - n)f 0  Damper: Suppress synchrotron frequency side-bands  Damping and excitation of mode n may be achieved at: DetectionExcitation harmonicSide-bandharmonicSide-band nuppern h - nlowerh - nlower h - nlowernupper n h - nlower normal cross f rf 2f rf

Frequency domain feedback system 8 + Filter + + h 1 f 0 (sin) h 1 f 0 (cos) h 1 f 0 (sin) h 1 f 0 (cos) Beam signal (WCM) Longitudinal kicker Test Perturb. Up-conversionDown-conversionFilter and perturbation Filter J.-L. Vallet Test Perturb.

Overview 9 Introduction Measurements and mode analysis Excitation, symmetry of modes Mode scans Kick voltage Cross damping Preliminary summary

Measurements (1/2) 10 1.Feedback in anti-phase to adjust optimum phase 2.Inject perturbation close to f s (max. at ~ 395 Hz) Beam energy, E13 GeV(C1800) - 15 GeV(C1850), or scan 9 to 26 GeV RF voltage~165 kV Synchrotron frequency, f s ~400 Hz Longitudinal emittance<0.7 eVs, pushed to stab. limit Feedback in anti-phase Excitation

Measurements (2/2) 11 3.Excite with perturbation and observe natural decay 4.Time domain mountain range data for analysis 5.Long. emittance

Mode analysis 12 → 18 oscillation amplitudes  n, 18 phases  n + f s 3.Discrete Fourier transformation → 18 mode amplitudes  k, 18 mode phases  k 1.Fit position of each bunch during each frame 2.Dipole oscillations: fit sinusoidal function to motion of bunch Why not measuring in frequency domain with a spectrum analyzer? Revolution frequency f rev sweeps along the cycle Spurious f rev lines due to 6/7 filling (18 bunches in h = 21) Synchrotron side-bands very close to strong f rev lines Measurement in time domain: Example with old data

Overview 13 Introduction Measurements and mode analysis Excitation, symmetry of modes Mode scans Kick voltage Cross damping Preliminary summary

Injection of perturbation 14 + Filter + + h 1 f 0 (sin) h 1 f 0 (cos) h 1 f 0 (sin) h 1 f 0 (cos) Beam signal (WCM) Longitudinal kicker Test Up-conversionDown-conversionFilter and perturbation Filter Test Perturb. (norm. sin) Perturb. (norm. cos)  Swap phasing of injected perturbation, perturb only sin/cos

Excitation (feedback at h FB = 14, 18b) 15 Single side-band  single mode

Overview 16 Introduction Measurements and mode analysis Excitation, symmetry of modes Mode scans Kick voltage Cross damping Preliminary summary

Mode scan with 18 bunches in h = Excite each mode individually and measure mode spectrum  Some modes can be excited very cleanly, others as a mixture; artefact? n

Mode scan with 21 bunches in h = n 21 - n Excite each mode individually and measure mode spectrum 2n2n 2n - 21  Clean observation of all possible modes

Overview 19 Introduction Measurements and mode analysis Excitation, symmetry of modes Mode scans Kick voltage Cross damping Preliminary summary

Kick voltage measurement 20 1.Time resolved spectrum of C10-11 cavity return Time Excitation 2.Extract an normalize relevant harmonic Excitation Damping  Amplitude modulation from carrier (at hf 0 ) and f s side-band (hf 0 ± f s )  Fit gives initial damping amplitude and time (+ f s and phase)

Damping time/kick strength 21 Anti-phase excitation Perturbation excitation Not corrected for natural damping time Damping time from kick voltageMax. kick voltage vs. mode ampl.  About 1 kV/ns for the given damping times  Little dependence from mode number or gain  Damping time and feedback gain changes with frequency Very preliminary!

Residual carrier at f 0 harmonic (1/2) 22 Feedback out: 100 mV/div Due to an offset problem with the up conversion mixers, a spurious carrier is generated at the revolution frequency harmonic  Significant power need from kicker cavity  No contribution to feedback action Offset well compensatedNormal operating condition  Will be resolved with digital low-level hardware for the coupled bunch feedback after h = 14 Feedback out: 200 mV/div

Residual carrier and f 0 harmonic (2/2) 23 Offset well compensatedNormal operating condition Try anti-phase excitation with well compensated offset: Feedback out: 100 mV/div h = 14 Feedback out: 200 mV/div  Residual carrier at revolution frequency harmonic excites the corresponding coupled-bunch mode For h = 14, this confirms earlier measurements, driving instabilities Unfortunately no data taken for h = 17…20; expect improved stability …too late…

Overview 24 Introduction Measurements and mode analysis Excitation, symmetry of modes Mode scans Kick voltage Cross damping Preliminary summary

Cross-damping 25 upper lower  Each mode n is observable as an upper side-band of n f 0 or as a lower sideband of (h - n)f 0  Important for PS longitudinal feedback:  Detection easier at h FB = 10…20  Longitudinal kicker easier at h FB = 1…11 f rf 2f rf Kick Measure  How can this be checked with the existing feedback?

Cross-damping, h 1 + h 2 = Filter + + h 1 f 0 (sin) h 1 f 0 (cos) h 2 f 0 (cos) h 2 f 0 (sin) Beam signal (WCM) Longitudinal kicker Perturb. Up-conversionDown-conversionFilter and perturbation Filter Need to flip side-bands: lower  upper  Swap sin/cos of LO signals to down- or up-conversion mixers

Test with feedback crossed 27 Tested combinations h = 8/13, 9/12 and 10/11  Feedback behaviour as expected Detect at h = 13  damp with C10-11 at h = 8 Detect at h = 8  damp with C10-11 at h = 13

What remains to be analyzed… 28 Mode scans with 50 ns and 25 ns beams Damping times for modes around h = 19 and 20 along the cycle Damping times versus longitudinal emittance, intensity and feedback gain Coupled-bunch mode spectra without feedback nor excitation  Extract relevant voltage requirement and estimate performance of new longitudinal damper

Preliminary (qualitative) summary run: excellent opportunity for tests  No need for very high intensity beams to LHC  Coupled-bunch feedback and the spare cavity available Clean mode scans: modes are well decoupled Shown that spurious mixer offsets with existing hardware do not contribute to feedback action Demonstrated working feedback with detection and excitation at different harmonics  Lots of interesting data yet to be analyzed

30 THANK YOU FOR YOUR ATTENTION!