Panhandle Renewable Energy Zone (PREZ) Study

Slides:



Advertisements
Similar presentations
Additional CREs to address Stability Limits Beth Garza TAC June 26, 2008.
Advertisements

October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
ERCOT VRT Study, Phase I ERCOT ROS Meeting December 10, 2009.
Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun-Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting June.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
Navarro to Houston Presentation to ERCOT RPG August 27, 2013.
System Strength Discussion
Technical Advisory Committee December 6, 2010 Summary of the CREZ Reactive Study Warren Lasher Manager, Long-Term Planning and Policy.
Integrating Wind on Weak Grids – CREZ Panhandle Region Sharyland Utilities July 16, 2014.
Valley Import Overview Jeff Billo Regional Planning Group Meeting July 22, 2014 Preliminary1.
The Status Of The Electric Grid In ERCOT The Electric Reliability Council Of Texas Sam R. Jones, P.E. ERCOT – Retired As a retiree of ERCOT this presentation.
How Winds are Created The earth’s winds are caused by pressure differences across the earth’s surface due to uneven heating Local Winds: During the day.
PLWG Report to ROS July 9, PGRRs needing vote PGRR043 – FIS Scoping Amendment – PGRR043 moves the Subsynchronous Resonance (SSR) Study out of the.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Need for Transmission Investment 2010 Mid-American Regulatory Conference AEP.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
Managing West Texas Wind SWEDE 2008 Conference May 2, 2008 Presented by Paul Hassink AEPSC Texas Transmission Planning.
NRG Comments/Concerns with HIP Assumptions January 21, 2014 RPG Meeting NRG Comments/Concerns with HIP Assumptions - January 21, 2014.
RTWG Report to TAC August 5, 2010 Howard Daniels.
April 16, 2010 RPG Meeting ERCOT Five-Year Transmission Plan Update Jeff Billo.
RPG Meeting Five Year Plan Extension Brad Schwarz.
PRR835 – Reactive Power Capability Requirement
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
K E M A T & D C O N S U L T I N G Power System Conference, Clemson, South Carolina, March 8-11, 2005 Principles and Issues Relating to the Interconnection.
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
VRT Study Update José Conto ERCOT System Planning.
Proposed North – South Congestion Mitigation Plan Luminant Energy July 2008.
December 7, 2012 Transmission Needs Analysis Scenario 5/7 Update.
Shun-Hsien (Fred) Huang ERCOT System Planning ERCOT RPG Meeting September 16, 2011 Preliminary Study Results of the High Frequency Oscillations in the.
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
November 12, 2010 Regional Planning Group Long-Term System Assessment Project Update Warren Lasher Manager, Long-Term Planning and Policy Jonathan Rose.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
2008 Annual Five Year Plan Update 2 10/12/2007 Regional Planning: Jay Teixeira, Harry Liu, Brad Schwarz, Jeff Billo, Chris Ngai.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
February 13, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
ERCOT Independent Review
Transmission Voltage Management Ross Owen Oncor Electric Delivery.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
Long Term Study Transmission Results May 21 st, 2013.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
ERCOT Public 1 Project Panel 1 Dan Woodfin Director, System Operations August 15, 2014.
3/28/2008 RPG CREZ Meeting CREZ Transmission Optimization (CTO) Study And The Oscar Goes To… Warren Lasher Manager, System Assessment.
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Transmission Services Report: North and West RPG Projects Bill Bojorquez TAC July 7, 2005.
August 24, 2007 ERCOT Regional Planning Group Meeting CREZ Transmission Optimization Study Warren Lasher System Assessment.
December 14, 2007 RPG - CREZ Meeting CREZ Transmission Optimization Study: Update Warren Lasher ERCOT System Assessment.
Respect for the Individual · Humility · Innovation · Excellence · Teamwork · Integrity System Strength/Short Circuit Current Minimum Requirement June 5,
1/14/10ERCOT ROS / CREZ OGRR1 Why is CREZ Unique? 15 GW of intermittent generation when ERCOT load is less than 30 GW 5000 miles of 345 kV circuits with.
June 11, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
Texas Congestion Management Work Group Update For WMS Marguerite Wagner, PSEG Texas.
Impact of not including proposed generators lacking RARF data in the planning models Planning Guide Section 6.9 Issues February 17, 2016.
October 15, 2012 PV & Storage Workshop ERCOT’s Interconnection Process John Adams Principal Engineer.
ERCOT – LP&L Study Status Update For Regional Planning Group Ben Richardson March 22, 2016.
RPG - 10/12/2007 Competitive Renewable Energy Zones (CREZ) Update Bill Bojorquez Vice President, System Planning.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Houston Import Study Update
Interconnecting Wind & Solar Energy in Texas
Freeport Area Master Plan Project -
Transmission Planning in ERCOT- Overview
2016 RTP Update November, 2016 RPG Meeting.
ERCOT 2009 Five-Year Transmission Plan Update
Oncor Electric Delivery Company LLC
How Winds are Created The earth’s winds are caused by pressure differences across the earth’s surface due to uneven heating Local Winds: During the day.
How Winds are Created The earth’s winds are caused by pressure differences across the earth’s surface due to uneven heating Local Winds: During the day.
Presentation transcript:

Panhandle Renewable Energy Zone (PREZ) Study Preliminary Results ERCOT System Planning ERCOT CMWG 09-04-2013 Preliminary Results

Outlines Needs and Purpose of PREZ study Generation Interconnection in Panhandle Overview Study Process Preliminary Results Observation and Discussion Preliminary Results

Needs of PREZ Study 2012 Long Term System Assessment Significant expansion of wind resources in the Panhandle under a range of future outcomes. If the northwestern-most portion of the Panhandle CREZ system becomes over-subscribed, voltage stability limits will constrain wind power delivery to the rest of the ERCOT system. Generation projects will exceed the CREZ design capacity for the Panhandle area (based on the CREZ Reactive Study “Initial Build” recommendations). No near-term Panhandle transmission projects being developed post CREZ 2013. Preliminary Results

Purpose of PREZ Study To identify system constraints and upgrades to accommodate future wind generation projects. To provide a project roadmap for both ERCOT and TSPs to accommodate additional generation resources in the study area. List of potential system upgrade projects. Triggers for when those projects will be recommended. Preliminary Results

Wind Projects GINR Overview Preliminary Results

Signed Generation Interconnection Agreements in Panhandle (3489 MW as of July, 2013) GINR ProjectName County Capacity (MW) COD** 13INR0059 Hereford Wind Castro 499 10/1/2013 14INR0012 Miami Wind 1 Project Gray 401 5/1/2014 13INR0048* Spinning Spur Wind Two Oldham 161 6/1/2014 14INR0030a2* Panhandle Wind Carson 218 8/1/2014 11INR0050 Moore Wind 1 Crosby 149 8/8/2014 13INR0010a Mariah Wind Parmer 200 10/30/2014 14INR0023 Longhorn Energy Center Briscoe 361 12/1/2014 13INR0005* Conway Wind Farm 600 12/15/2014 13INR0010b 12/31/2015 12INR0029 Comanche Run Wind Swisher 500 13INR0010c 12/31/2016 *With financial commitment ** Projected commercial operation date Preliminary Results

Panhandle Grid Characteristics Minimal/no local load Minimal/no sync generation 11 GW wind capacity in GINR Voltage stability and grid strength challenges Preliminary Results

IA (2593 3489 MW) FIS-Complete (2450 1401 MW) FIS Study (5409 5552MW) Initial Build (2400 MW) Panhandle GINR Overview Updated March 8th, 2013, July, 2013 400 400 600 761 322 218 200 600 1100 200 500 600 361 400 149 Preliminary Results

Study Process Reliability Analysis Economic Analysis Steady state and dynamic stability analysis SSWG 2016 HWLL base case 8,946MW wind output, 36.5GW load 0 MW in Panhandle Two scenarios 5,000 MW wind output in Panhandle 7,500 MW wind output in Panhandle Economic Analysis 2017 UPLAN case from 2012 Five-Year Transmission Plan Preliminary Results

Current Panhandle Design – 2,400 MW Gray Alibates Windmill Tule Canyon Ogallala Tesla Cotton Wood Dermott Long Draw Preliminary Results

Scenario 1 Upgrades - 5 GW PREZ Windmill – Ogallala (1ckt, 27miles) Windmill – Alibates (1ckt, 93miles) Ogallala – Tule Canyon (1ckt, 47miles) Ogallala - Long Draw(2ckt, 200 miles) Condenser: WM (350 MVAr), OG (350 MVAr) Reactors: TC(150MVAr), OG(150MVAr), LD(100MVAr) Gray Alibates Windmill Ogallala Tule Canyon Tesla Cotton Wood Dermott Long Draw Preliminary Results

Scenario 2 Upgrades - 7.5 GW PREZ: Option 1 345 kV projects Windmill – Ogallala (1ckt, 27miles) Windmill – Alibates (1ckt, 93miles) Ogallala – Tule Canyon (1ckt, 47miles) Condenser: WM , OG 345/500 kV projects Ogallala - Long Draw (2ckts, 200 miles) Gray-Riley(2ckts, 175 miles) Windmill-EdithClarke (2ckts, 175 miles) Gray Alibates Windmill Ogallala Tule Canyon Tesla Riley Edith Clarke Cotton Wood Graham Dermott Long Draw W. Shackelford Preliminary Results

Study Progress In Service Signed Interconnection Agreement Alibates-Windmill (345kV) Windmill-Ogallala(345kV) Ogallala-TuleCanyon(345kV) Ogallala-LongDraw 2ckts Synchronous Condensers and Reactors CREZ IA SC1 SC2 0 MW 2,400 MW 3,489 MW 5,000 MW 7,500 MW CREZ 345/500 kV projects Gray-Riley 2ckts Windmill-EdithClarke 2ckts TBD Preliminary Results

Notes PREZ study focuses on the upgrade needs to increase Panhandle export capability. Other ERCOT regions may require further studies for potential thermal and stability challenges. The identified upgrades may be revised base on the actual implementation of wind projects in Panhandle. The upgrades identified in this study may still require RPG review. Preliminary Results

Upgrades for PREZ Panhandle West Texas** Load: 0MW Wind: 7.5GW SG: 0MW West Texas** Load: 2.9GW Wind: 7.6GW SG*: 2.7GW Stability Constraint: Voltage stability Weak link Low short circuit ratio Controller challenge Existing link Identified Panhandle Upgrades *Include Comanche Peak units ** not include Panhandle Preliminary Results

Upgrades for West Texas wind generation Panhandle Load: 0MW Wind: 7.5GW SG: 0MW West Texas** Load: 2.9GW Wind: 7.6GW SG*: 2.7GW ERCOT Load Centers Stability Constraint: Voltage stability Low short circuit ratio Voltage support for transfer Existing link Identified Panhandle Upgrades *Include Comanche Peak units ** not include Panhandle Further Upgrades? Preliminary Results

Study Observation – Voltage Ride Through Weak network conditions can cause transient overvoltage Based on the modeled wind farms in the study, 973 MW wind capacity tripped due to transient overvoltage. More capacity can be tripped that can even lead to high voltage collapse in the entire Panhandle area if wind farms are equipped with less voltage ride through capability. Panhandle 345kV Bus Voltage Response

High Voltage Ride Through (HVRT): NOGRR 124 Add HVRT base on PRC-024 (Adopted by the NERC Board of Trustees on May 9, 2013) No change to the low voltage ride through requirement in Operating Guide 2.9.1