Technical Readiness Review of the n-3He Experiment Seppo Penttila ORNL P-div At SNS Jan-10-2014.

Slides:



Advertisements
Similar presentations
Tritium Target 9 December Overview Design and major subsystems Thermal/structural analysis Cell filling Vent and stack T2 detection and monitoring.
Advertisements

11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
NPDgamma Liquid Hydrogen Target Safety Review Project and Safety At LANL November 29-30, 2005.
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
Status of the Tagger Hall Background Simulation Simulation A. Somov, Jefferson Lab Hall-D Collaboration Meeting, University of Regina September
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
Concept for the New Detector Chamber at the ESR Ion beam Internal Target Region  Lab *)  Flange axis Covered  range Flange size in mm A90° – 80°83°95°
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
The n- 3 He Experiment Christopher Crawford University of Kentucky for the n- 3 He Collaboration FnPB PRAC ORNL, TN
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
NPDgamma Liquid Hydrogen Target Safety Review At LANL November 29-30, 2005.
CsI Photocathode Production and Testing
NPDGamma - LH2 Target - Relief/Ventline Systems Seppo Penttila NPDGamma Project Manager Predicted A  =5x10 -8 We are aiming to 10% measurement.
Update on Cryotarget System Jian-ping Chen GMn Collaboration Meeting, Feb. 24, 2014  Overview  Maintenance/Modifications During Down  Installation Status.
The n- 3 He Project Christopher Crawford University of Kentucky for the n- 3 He Collaboration n-3He Technical Review ORNL, TN
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
The n- 3 He Project Christopher Crawford University of Kentucky for the n- 3 He Collaboration n-3He Technical Review ORNL, TN
The n 3 He Experiment Probing the Hadronic Weak Interaction Abstract: Although QCD has had tremendous success in describing the strong interaction at high.
1 Overview of the NPDGamma Experiment at the Fundamental Neutron Physics Beamline Geoff Greene UT/ORNL.
Instrument Development Test Station at HFIR CG1 Lowell Crow, May 15, 2009.
The 2nd NPDGamma Experiment Safety Review - Liquid Hydrogen Target Seppo Penttila NPDGamma project manager June 09, 2008 SNS.
What happened to our shutter? and a brief description of our upstream beamline for those who were not around when it was built.
NUMI NuMI Internal Review July 12, 2001 Infrastructure: Radiation Safety Page 1 Technical Components NuMI Beamline Radiation Safety Issues Radiation Safety.
Status update of n- 3 He experiment DOE FnPB Review, ORNL D. Bowman, S. Penttila Oak Ridge National Laboratory M. Gericke University of Manitoba.
Experiment beam line installation (9/4/2014) SystemThus FarTo Do Vacuum~ Torr, IP’s on, Vac interlock checkNone Fast valveValve + CCG installed,
Stopped Muon/Pion Measurements Jim Miller, BU May 2012 UW Test Beam Meeting.
Conceptual Design Review of the NPDGamma Experiment in Beam Line 13 Seppo Penttila NPDGamma project manager September 25, 2007 at SNS.
BL1U at TRIUMF UCN Beamline Spallation Target & Remote-Handling System (Aug/2010) L.Lee.
Neutron Beam Intensity for the Spallation Neutron Source Beamline 13: The NPDGamma Experiment Analysis and Results Jeremy Stewart University of Tennessee.
Normalization of the NPDGamma Experimental Data F. Simmons, C. Crawford University of Kentucky, for the NPDGamma collaboration Background: NPDγ Experiment.
Systematics of the SNS n- 3 He Experiment Christopher Crawford University of Kentucky for the n- 3 He Collaboration APS April Meeting Denver, CO,
Beam Polarimetry Matthew Musgrave NPDGamma Collaboration Meeting Oak Ridge National Laboratory Oct. 15, 2010.
The HYSPEC Polarized Beam Spectrometer Mark Hagen, Barry Winn, Melissa Graves-Brook Neutron Scattering Science Division David Anderson, Xin Tony Tong Neutron.
Mu2e WGM 11/16/2011 R. Ray Mu2e Project manager. Review of the past few months In September it became apparent that the cost of Mu2e was well in excess.
Radiation Protection and Safety 12/18/ Radiation Protection   Objectives and standards Benefits and risks   Occupational (onsite) vs. Non-occupational.
The NPD  Experiment David Bowman IScientific goals IIStatus.
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
Fusion Neutronics Activity at JAERI from October 2000 to September 2001 Peseted by Takeo NISHTANI IEA International Work Shop on Fusion Neutronics The.
The n- 3 He Parity Violation Experiment Christopher Crawford University of Kentucky for the n- 3 He Collaboration NSAC Review Meeting Chicago, IL,
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
EDM in ER2 at LANSCE Jan Boissevain LANSCE ER-2 Stake Holder Meeting
Spreaders & Recombiners Beam Transport Michael Bevins May 30, GeV Upgrade - Beam Transport Spreader/Recombiner Dipoles and Layout, & Installation.
Status of n_TOF Facility
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Moving the NPDGamma Experiment to the SNS FnPB Christopher Crawford University of Kentucky overview of NPDGamma transition to the SNS expected.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
Present status of production target and Room design Takashi Hashimoto, IBS/RISP 2015, February.
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
RFQ Installation Plan PIP-II Meeting, 14-July-2015 C. Baffes for R. Andrews, A. Chen, Y. Czajkowski, S. Kazakov, R. Pasquinelli, D. Peterson, O. Pronitchev,
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
7/24/011 TFTR D&D Status July 24, /24/012 Project Status The TFTR D&D Project will be completed on time and within budget.
ESS licensing process and Readiness Reviews
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Fundamental Neutron Physics BL-13
Status Report on E-166 Undulator-Based Production of Polarized Positrons K.T. McDonald Princeton University EPAC Meeting SLAC, November 15, 2003.
The NPDGamma Experiment at the SNS FnPB
Advanced Research Electron Accelerator Laboratory
The n3He Experiment Michael Gericke for the n3He collaboration
Monte Carlo simulations for the ODIN shielding at ESS
Primary Spectrometer & Sample Environment
Heinz-Dieter Nuhn – LCLS Undulator Group Leader May 14, 2009
Technical Updates Gábor László NSS Lead Instrument Engineer
NSS integrated installation plan workshop Introduction
Radiation fields During 1st stage beam commissioning
Presentation transcript:

Technical Readiness Review of the n-3He Experiment Seppo Penttila ORNL P-div At SNS Jan

Seppo Penttila ORNL P-div Technical Readiness Review of the n-3He Experiment Overall schedule ES&H Radiological issues Tritium contaminated 3He gas

Flow of main tasks in the n-3He construction project 1.Design of components close to be done 2.Procurement / fabrication of components in progress 3.Testing / assembly / integration outside beamline 4.Removal of NPDGamma needs access to beamline 5.Installation in cave as soon as possible 6.IRR process completes the construction part of n-3He Schedule:

Main components of n-3He experiment Supermirror polarizer Lead gamma shielding Solenoid RF Spin Rotator 3He target/ detector 4 x preamp enclosures

Construction and Installation tasks in level 1 Preassembly Today Start disassemble NPDGamma IRR

Installation Gantt chart in level 3

ES&H

Removed NPDGamma components are slightly activated Activated especially are several Al beam windows and in some extend 48 CsI crystals. All the removed NPDGamma components will be staged and roped in bldg 8713 for survey, disassembly, and possible shipping.

Dose Rate Calculations We have performed preliminary dose estimates with MCNP6 using Remec’s geometry, source term, and shielding package that he used for NPDGamma. In NPDGamma neutrons are converted to gamma rays In n-3He experiment n-3He capture doesn’t produce gamma rays.

Radiation Levels - n-3He has two modes of operation N-3He will have two modes of operation: 1.Alignment with beam – no 3He in target 2.Normal production with 3He target Dose rates have been studied for the both modes of operation

The 1 st task in commissioning is alignment of the detector to beam – beam profile need to be measured down- and upstream from the apparatus without target chamber and RFSR.

Neutron dose rates with 3He

Neutron dose rates with 3He

Neutron dose rates with 3He

Neutron dose rates without 3He

Photon dose rates with/without 3He

According to these preliminary dose rate studies, the radiation levels outside the shielding meet the SNS limit. We will complete the dose rate studies and then the SNS Neutronics Analysis group has to verify the results for IRR.

Tritium contaminated 3He In experiment we are interested in reaction n + 3 He -> 3 H + 1 H T 1/2 =12.3 yr

After neutron guide neutron flux is neutrons/s - Supermirror polarizer reduces flux by 2 - 5x10 10 neutrons/s enter the 3He target chamber - ½-lifetime of triton is 12.3 yr h of production Tritium activity in chamber will be 80 mCi corresponding to about tritons = 1.4 micro mole = 4.2 micro gr For an upper-limit estimate for tritium amount at the end of the experiment: How much tritium is produced ? BL-13 flux from guide

We have to consider: -Accidental relies of tritium into Target Hall -During experiment sensing wires can break inside the chamber -we need to open the chamber; pump the contaminated 3He to auxiliary container at SNS/HIFR/?? to fix the problem -When the experiment is over we want to recover 3He ($$) at USA or -Transport chamber with tritium to Univ. Manitoba / Canada for recovery.

Chamber is a strong Al vacuum chamber with sst CF flanging – beam windows 1 mm thick Al. 3He gas in the chamber is at NTP. We are in process with SNS to study issues such as; -What happens accidentally released gas -Possibility to pump contaminated 3He into a storage tank at SNS -Regulations for transportation of tritium contaminated gas inside USA and across border to Canada. For IRR we will create a safety document to cover the tritium issues.