Title 2 nd X-band Accelerator Structure Design and Test-Program Collaboration Meeting Discussion with WebEx on March 17 between CERN and KEK W. Wuensch,

Slides:



Advertisements
Similar presentations
CLIC08 workshop Structure production: CERN activities and Master Schedule G. Riddone, W. Wuensch, R. Zennaro, Contributions from C. Achard, S. Atieh, V.
Advertisements

CERN-KEK X-band collaboration 3 Dec T. Higo on behalf of X-band group of KEK.
Status and plan for X-band high field experiments at KEK US High Gradient Collaboration Workshop University of Maryland Jan , 2008 KEK T. Higo.
High gradient studies in simple setups (for discussion) T. Higo.
CLIC RF structure master schedule and CERN production
June 19, 2008 Heinz-Dieter Nuhn, SLAC / LCLS Overview 1 Overview Heinz-Dieter Nuhn, SLAC / LCLS June 19, 2008 Introduction Workshop.
Working Group 1: Microwave Acceleration Summary 10 July 2009.
High-gradient Experiments with Narrow Waveguides Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Noboru Kudo, Shuji Matsumoto, Shigeki Fukuda, Mitsuo Akemoto,
Walter Wuensch CLIC project meeting, 31 March 2015 Accelerating structure program: design and testing.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
5 th CLIC X-band collaboration meetingWalter Wuensch16 May 2011 CLIC rf structure program.
Results from Nextef Observations in high gradient tests of CLIC Prototype Structures and associated study activities CLIC2013, CERN 29 January, 2013 T.
Accelerating structure test results and what’s next Walter Wuensch CTF3 collaboration meeting
R&D status and future strategy in KEK X-band area May 16, 2011 T. Higo (KEK)
Update of KEK X-band Research Activity March 3, 2009 Shuji Matsumoto Accelerator Laboratory, KEK 2009/3/31US High Gradient Workshop.
日米協力 US/Japan cooperation Research of High Gradient Acceleration Technology for Future Accelerators progress report New proposal 7.
F D. Finley / Fermilab FARDOG / January 4, FARDOG 04JAN01 Discussion of FY01 Budget and Goals for RF Structures.
Structure Nick-Names and Documentation Germana creates/created a structure traveler describing the handling (Features: each step, with date and description,
Fabrication of accelerator structures for CLIC study CLIC Workshop Oct , CERN T. Higo, KEK.
SCRF Monthly WebEx Meeting June 30, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
Summary of the meeting T. Higo This meeting was originally born as a collaboration meeting among three laboratories, CERN, SLAC and KEK, but the attendee.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
EuCARD is co-funded by the European Commission within the Framework Programme 7 under Grant Agreement no Reach of NC and SC Technologies, 50 …
Marc Ross The Normal-Conducting Linear Collider preparation - status and plans.
CLIC cost estimate Hans-H. Braun, CLIC-GDE meeting, February 8, 2008  Cost model goals  Methodology  Cost distribution  Future improvements.
X-band high gradient activities at KEK May 13-15, nd Collaboration meeting on X-band Accelerator Structure Design and Test Program T. Higo, KEK.
X-Band: test stand and structure program
NLC Status and Milestones D. L. Burke ISG9 KEK December 10-13, 2002.
ABSTRACT The Compact Linear Collider (CLIC) is currently under development at CERN as a potential multi-TeV e + e – collider. The manufacturing and assembly.
Cost Model including Civil Engineering and Conventional Facilities Hans-H. Braun, CLIC ACE, June 20, 2007  Cost model goals  Methodology  Scaling assumptions.
Recent High-gradient test result at KEK Linear Collider Workshop 2012 Arlington, Texas (WebEx) 25 October, 2012 Toshi Higo and X-band group of KEK.
Performance of CLIC prototype accelerator structures tested at Nextef CLIC February 2014 Toshiyasu Higo (KEK)
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
常伝導技術での LC の可能性 LC feasibility consideration with normal conducting technology 第5回「機構の研究推進について」の意見交 換会 (ILC の推進について ) 平成 24 年 2 月 13 日 加速器・肥後寿泰.
Update of master schedule and report from SLAC G. Riddone
Recent high-gradient results, rf testing, places and plans Steffen Döbert, CLIC Workshop, Test facilities High gradient results Future testing.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
KEK workshopWalter Wuensch18 April 2012 Status and objectives of the CLIC X-band and high- gradient activity.
The CLIC accelerating structure development program Walter Wuensch CARE05 23 November 2005.
CLIC Accelerating Structure R&D Introduction W. Wuensch X-band workshop
Contribution from Pakistan to CLIC & CTF-3 Project. NASIR ABBAS
Following 3 places are opened for visitors: 1)Nextef (New X-band Test Facility); 2)Untra-precise Machining Laboratory Clean room; 3)High Precision Measuring.
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
44th ICFA Workshop under the sponsorship of the ICFA BD Panel, Cockcroft Inst., 1-4 Dec 2008 Welcome and Introduction to the Workshop Roger M. Jones Cockcroft.
5 th CLIC-ACE Structure production in laboratories and industries G. Riddone, 02/02/2010 (contribution from KEK/SLAC colleagues) 1.
Progress of X-Band Accelerating Structures LINAC10, Tsukuba 17 Sep T. Higo (KEK)
Status report from KEK Feb. 26, 2010 T. Higo, S. Matsumoto T. Takatomi, Y. Higashi and X-band group.
TBTS Test Program & Schedule G. Riddone
W. Wuensch CLIC project meeting High-power rf structure testing.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
CLIC09 WG4 RF Structure1 Engineering Perspectives on Quadrants (2) CLIC09 Workshop KEK Y.Higashi.
TD26CC PLANS FROM CIEMAT Laura Sánchez on behalf Electrical Engineering Group of CIEMAT.
Status of high gradient experiments at Nextef Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Shuji Matsumoto, Shigeki Fukuda Accelerator Laboratory, KEK.
Nextef results & status International Workshop on Breakdown Science and High Gradient Technology KEK, Japan 18 April 2012 Toshi Higo.
Review of the rf working group of the ICFA Mini Workshop on Novel Accelerators and Colliders which was associated with the Bob Siemann Memorial Symposium.
Narrow waveguide experiments Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Noboru Kudo, Shuji Matsumoto, Shigeki Fukuda, Mitsuo Akemoto, Mitsuhiro Yoshida,
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Welcome to The 2 nd Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 13-15, 2008 Seminar Hall in 4 th Build. Announcement.
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
Test Accelerating Structures Designs, Objectives and Critical Issues
Testing Infrastructure, Program and Milestones
Summary of WG4 Normal Conducting RF
BAW Prep S1 Global Status Pilot Plant Status
Disk-damped versus Quadrant-damped from engineering view point
SLAC Production Status
SLAC National Accelerator Laboratory ROB A/B room (Bldg. 48)
5th COLLABORATION MEETING on X-BAND ACCELERATOR STRUCTURE
Presentation transcript:

Title 2 nd X-band Accelerator Structure Design and Test-Program Collaboration Meeting Discussion with WebEx on March 17 between CERN and KEK W. Wuensch, G. Riddone S. Fukuda, T. Shidara, T. Higo, K. Ueno

Date is temporary assigned to be May 13~16 SunMonTueWedThuFriSat 5/45/55/65/75/85/95/10 5/115/125/135/145/155/165/17 5/185/195/205/215/225/235/24 5/255/265/275/285/295/305/31 Possible attendee CERN 7 -- 8 from CERN, + Uppsala, Finland, Saclay, … SLAC 2? KEK several from ACC division several from mechanical engineering center Vendor? It is better to have a support/acknowledgment from ICFA for example. Let us see what is good support for this workshop.

Agenda 1 Global scope –Welcome address by KEK –Road map of CLIC? Two beam or separate RF source … Walter –SLAC, US view? Structure design –Review of structure parameters for CLIC –Relationship with test structure parameters Fabrication (disk, quad, PETS) –Present situation and results –Detailed mechanical design on the quadrant –Problems and future study items

Agenda 2 High gradient experiment –Analysis of all high gradient data (Alexej) –Status of NLCTA, ASTA and Nextef experiments –Comparison of initial processing of the T18_VG2.4_Disk –Discussion RF high power test system –Status of NLCTA, ASTA and Nextef operation –RF sources and components –Possible future developments on RF sources High gradient strategy –Based on the high gradient test to date –Reconfirmation on the goal and time frame –Strategy on parameters of test structures –Strategy with disk-based/quadrant, with/without damping –Strategy with OFE and CuZr, heat treated or not, …

Tour to laboratories and workshops Fabrication –high precision machining and low power test area –CMM and other mechanical measurement area –Chemical treatment –Higashi’s setup for SLAC –Hydrogen furnace High power test –Nextef –Klystron assembly hall

Information User registration for staying at dormitory – –We can help registration with your full name and address Secretary (ILC) –T. Shirakata: Hotel to stay –KEK dormitory: reservation from 45 days ahead, outside hotel? To KEK –Narita  1.5h(bus)toTsukuba Center  0.5h(Taxi)toKEK Meeting room –Mainly at 4 th bldg meeting room with WebEx –Additional: 3 rd bldg 7 th, 711, etc.