DC Tie Automation Project. Automation Project Objectives Automate Comparison of eTags to QSE DC Tie Schedules Automate Operator offsets for DC Tie eTag/Schedule.

Slides:



Advertisements
Similar presentations
Primary Objectives of WIT
Advertisements

Open Access Technology International, Inc.
Market True-Up Discussion RMS Meeting 03/13/02 Draft Only for Discussion Purposes.
TNT Commercial Operations Working Meeting Betty Day, Kenneth Ragsdale, BJ Flowers April 6&7, 2004.
Distributed Generation (DG)
Example 1 Solution by Elimination Chapter 7.1 Solve the system  2009 PBLPathways.
6 th Annual Focus Users’ Conference 6 th Annual Focus Users’ Conference Point of Sale Presented by: Natasha Leon Presented by: Natasha Leon.
Sheryl Welch, ATFWG Chair August 20, 2014 Portland, OR.
FREQUENCY CONTROL DURING BLACK START OPERATIONS
ERCOT Billing, Settlement Disputes & Data Extracts
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
System Basics and Structure. NOTE: Not Rostered – refers to team assignment in club tab only. It DOES NOT mean the player is officially.
1. 2 ENERGY MANAGEMENT SYSTEM AN OVERVIEW AN OVERVIEW.
PCI Webinar on Using PCI Energy Accounting System to Validate Meter Data March 5, 2015.
ERCOT IT Update Ken Shoquist VP, CIO Information Technology Board Meeting May 2004.
DC Tie Reservation and Scheduling with Mexico Shams Siddiqi representing Sharyland Utilities WMS Meeting May 15, 2007.
Annual Reporting for Fire Admin Software February 25, 2013 Spokane WA SAO Statements & Schedules SAO Reporting Requirements SAO Reporting Changes.
SO – CART Project Status Protocol Revision Subcommittee Update 2/23/06.
FERC Order No. 698 Procedures for Providing Hourly Consumption Data Spectra Energy Pipelines June 20, 2008.
1Texas Nodal Texas Nodal Commercial Systems COMS CSD Presentation By ERCOT Wednesday, 1/10/2007.
ERCOT Program Management Update RMS Meeting – May 15, 2003 Steve Wallace.
COMMERCIAL OPERATIONS ORGANIZATION Betty Day Director, Commercial Operations (office) (cell) (fax)
UFE 2005 Analysis 1 UFE 2005 ANALYSIS Compiled by Load Profiling ERCOT Energy Analysis & Aggregation.
Calculation of Net Energy for Load COPS. 2 2 Outline  Definition of Net Energy for Load  How Net Energy for Load is calculated in ERCOT.
GENERATION PROTOCOL AND SETTLEMENT TODAY COMET WG / RMS Workshop Electric Reliability Council of Texas May 2, 2007.
State of Kansas Travel Authorizations Statewide Management, Accounting and Reporting Tool Entering a Travel Authorization Navigation: Travel and Expense.
Managing Reliability and the Markets with PI
12/6/2015 ERCOT Production Issues Update ERCOT Matthew Tozer.
2013 Wind Conference. Congestion Management & Communication Processes CJ Brown.
1 TAC Report to the ERCOT Board February 21, 2006.
This slide deck contains animations. Please open this deck in slide show mode (“View” menu, then click on “Slide Show”). To move through the animations,
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Discuss Options to Improve Market Visibility to RTBES Presented by: Matt Mereness Friday, October 27, 2006.
NIMAC for Publishers & Vendors: Using the Excel to OPF Feature & Manually Uploading Files December 2015.
1 Presentation MIT November 14, 2011 Metering Issues Taskforce (MIT) Elimination of Time Error Correction Potential Impact on Wholesale Settlements.
Excel: Subtotals and Totals Computer Information Technology Section 6-16 Some text and examples used with permission from: Note:
UNCLASSIFIED – For Official Use Only 1 Contract Load Notification “Fly-in” Action ( Continue to Page Down/Click on each page…) Electronic Document Access.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
ERCOT MARKET EDUCATION Retail 101. Advanced Meter Technology.
ROS December 2007 Carlos Gonzalez-Perez ERCOT Operations Support CFE-ERCOT DC-Ties Commercial Operations 1 10/30-31/2007 CFE/ERCOT/AEP Meeting – Mexico.
State Estimator (SE) and Simultaneous Feasibility Test (SFT) Status Report Steve Myers Manager of System Operations.
© Property of ERCOT EMMS Improvements Operations Review Group 11/17/04.
New Sirs for TML (Formely TML Phase III) COPS April 10, 2007.
PDCWG Report to ROS January 13, 2011 Sydney Niemeyer.
NAESB Gas-Electric Harmonization Forum Jerry Dempsey Senior Vice President Sheldan Perry Manager of Gas Systems Houston, TX February 18 and 19, 2016.
MG 298 Entrepreneurship Module #5 Financial Projections: How to Do Them the Right Way 09 October 2007.
TAC 2012 Meetings Update (March & April) to Commercial Operations Subcommittee Harika Basaran 5/8/2012.
Joint Initiative Update OATI has been chosen as the preferred vendor to develop an online bulletin board and trading platform. It will allow counterparties.
QSE Managers Working Group Meeting Notes 9 October, 2008 Report to WMS 22 October, 2008 David Detelich - Chairperson.
Information Technology Service Availability Metrics RMS August 2008 Trey Felton.
NERC BAL-005, BAL-006, FAC-001 Gary Nolan WECC ISAS April 20, 2016.
Proficy Workflow for Small/Medium Utilities Wholesale Power Cost Calculations Use Case.
ROS Presentation: Dynamic Scheduling and EEA Austin, TX September 10, 2009 Steve Isser Vice President and General Counsel Good Company Associates
Real Time Revenue Neutrality CSWG 2/27/2012 Jim Galvin.
DFR Downloader Theo Laughner, PE Presented at GPA User Forum August 5, 2015.
Interchange Scheduling & Accounting Subcommittee (ISAS) Charles (Bud) Freeman, SCL W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Southern Cross Transmission LLC Owner/Operator of a Merchant DC Tie
Distributed Generation Task Force
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
Southern Cross Transmission LLC Owner/Operator of a Merchant DC Tie
John Dumas Director, Wholesale Market Operations
TAC Report to the ERCOT Board
NPRR829 Incorporate Real-Time Telemetered Net Generation for Non-Modeled Generation into the Real-Time Liability Estimate ERCOT PRS Meeting May 11, 2017.
Domain Matching for Contract Association Requests
Review of After-the-Fact (ATF) Tagging Criteria Scheduler’s Meeting May 24, 2016 Raymond will ask the audience what their expectations are in regard to.
Electronic Scheduling Work Group Report Raymond R. Vojdani, P. E.
Review of After-the-Fact (ATF) Tagging Criteria Scheduler’s Meeting May 24, 2016 Raymond will ask the audience what their expectations are in regard to.
Electronic Scheduling Work Group Report Raymond R. Vojdani, P. E.
Presentation transcript:

DC Tie Automation Project

Automation Project Objectives Automate Comparison of eTags to QSE DC Tie Schedules Automate Operator offsets for DC Tie eTag/Schedule mismatches Monitor/compare eTag Net Scheduled Interchange to DC Tie SCADA on EMS Display Automate Inadvertent Energy Accounting

Automate Comparison of eTags to QSE DC Tie Schedules Add a QSE number or drop down tab in eTag form to Identify ERCOT QSE Upload ERCOT DC Tie schedules to OATI Contract with OATI for new displays to sort and compare eTags to QSE DC Tie schedules Download eTag schedule data from OATI to MDB and Settlements Enhanced eTag/QSE Schedule reporting capability

Automate Operator offsets for DC Tie eTag/Schedule mismatches Download approved eTag schedules to ERCOT MDB and MOS Substitute eTag Schedules for QSE DC Tie Schedules in the operating period real time applications Automatically provides correct DC Tie flow to SPD for congestion analysis and balancing Manual operator offset for DC Tie mismatches no longer necessary

Monitor/Compare eTag Net Scheduled Interchange to DC Tie SCADA on EMS Display Sum of eTags for DC Tie equals Net Scheduled Interchange NSI downloaded from OATI and linked to an EMS display next to DC Tie SCADA value Alarm for Differences Errors identified quickly

Automate Inadvertent Energy Accounting Perform Inadvertent Energy Accounting on OATI application Eliminate internal manual spreadsheets Upload EPS meter data for DC Ties for final meter reading corrections Inadvertent Energy information downloaded from OATI for final archives Enhanced OATI reporting capabilities