FOX demonstrator Configuration for LArDPS to eFEX Test -- direct path Rev: 07-Jan-2015.

Slides:



Advertisements
Similar presentations
R&M Fiberliner LAN / WAN applications R&Measynet.
Advertisements

Install L2 Switch Head End CATV
Copyright 2008 Kenneth M. Chipps Ph.D. How to Terminate a Corning Unicam Connector Last Update
Testing Fiber Optic Media Lab Last Update Copyright Kenneth M. Chipps Ph.D. 1.
CHAPTER Peer-to-peer Network Installation and Configuration.
L1 => L2 Optical Network Patch Panel Update Tim Durkin STFC RAL 03/04/2014.
Binary Decision Diagrams1 BINARY DECISION DIAGRAMS.
© 2006, VDV Works LLC Fiber Optics A Basic Training Program Created By Jim Hayes Sample Slides For Instructor Evaluation.
TESTING MULTIMODE FIBER
Chapter 10 Optical fiber measuring instruments and testing single-mode fiber networks.
1 Fiber Optic Measurement Technique Piotr Turowicz Poznan Supercomputing and Networking Center Training Session Kiev 9-10 October.
1 Fiber Optics FIBER OPTIC PATCH PANELS. 2 Fiber Optics Just like our copper cable plant the fiber cable plant incorporates many of the same hardware.
Fiber Optics FIBER CONNECTOR TYPES.
Testing Fiber Optic Media Last Update
How to Build a CAN Last Update Copyright Kenneth M. Chipps PhD 1.
What Is Network ?. A Network is a connected collection of devices and systems, such as computers and servers, which can communicate with each other.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
O ptical R eturn L oss testing using KI 7340 series Loss Tester Kingfisher International PTY LTD V
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
25 km E offshore Catania 2000 m depth TSS Frame Buoy Junction Box e.o. connection e.o. cable from shore Shore laboratory, Port of Catania e.o. cable.
Fiber connections of QIE cards in UX5 Ulrich Heintz 4/23/20151.
1 Module 3 TERAWAVE CONFIDENTIAL – DO NOT COPY Terawave Communications, Inc. Network Planning Course Module 3 PON Physical Network Engineering.
CCNA 1 v3.0 Module 4 Cable Testing. Objectives Waves.
CERN EN-EL Cabling and Optical Fibre Section CERN EN-EL Cabling and Optical Fibre Section Mini Workshop, Simao Machado, EN/EL/CF.
TERAWAVE CONFIDENTIAL – DO NOT COPY 1 Module 3 Terawave Communications, Inc. Product Overview Course Module 3 Training Network Overview Test Equipment.
Network infrastructure for CERN DataCenter HEPiX Fall 2015.
Almega. Visible Raman Microscope
1 Fibre Channel Roadmap Graphics Scott Kipp
1. Network technology 2 Network Card (UTP) 3 UTP cable Unshielded twisted pair (UTP) 4 Shielded twisted pair (STP)
Transmission Measurement Basic Outline. Transmission Curve Describes the percentage of a signal that is transmitted through an object (filter) over a.
Solutions – 1 – opticonx.com FOR DATA CENTERS AND STORAGE AREA NETWORKS Solutions Xtreme8™ is Opticonx’s Base-8 cabling solution for easy migration.
Optical performance measurements of various fibre connections
SPS – DM Shadow Position Sensors – Demonstration Model Gerardo Capobianco INAF – Astrophysical Observatory of Turin Torino, 21 st January 2016ASPIICS/Proba-3.
Radiation Test Results Preliminary measurements from exposure to gamma rays at SCK-CEN B. Todd Huffman, C. Issever, T. Weidberg Summer Students - A. Povey,
Slide 1 Insert your own content.. Slide 2 Insert your own content.
CuOF towards the Production Certification Tests 4/9/131 D. Dattola, P. De Remigis, S. Maselli, G. Mazza, G.Ortona, G.L. Pinna Angioni, F. Rotondo, R. Wheadon.
Insert Poster Content Here. Authors are permitted to submit three slides per accepted poster, with one additional slide at the end for contact details.
The electro-optical cabling system for the NEMO Phase-2 tower Antonio D’Amico INFN - LNS.
Pertemuan 10 Signal & Noise
UNM&ABQG Network Topology
FIBER OPTIC Jumper Cord SERIES
S12700 CSS Card Clustering 1 Components and Tools 2 Installing Cards
Module 4 Cable Testing.
Fiber Installation for RUN 3&4
. - t !!l t. - 1f1f J - /\/\ - ' I __.
Characterizing FOX Demonstrator Test Setups for LArDPS to FEX Modules at CERN RuthAnn Gregory.
December 1, 2018.
Slide 1 Insert your own content.. Slide 1 Insert your own content.
.. '.. ' 'i.., \. J'.....,....., ,., ,,.. '"'". ' · · f.. -··-·· '.,.. \...,., '.··.. ! f.f.
Slide 1 Insert your own content.. Slide 1 Insert your own content.
Slide 1 Insert your own content.. Slide 1 Insert your own content.
<Insert Picture Here>
CrystaLatchTM High Power 1x1,1x2 Solid-State Fiberoptic Switch (5W CW)
CrystaLatchTM 1x1,1x2, Solid-State Fiberoptic Switch
CrystaLatchTM Mini 1x3,1x4 Solid State Fiberoptic Switch
Performance Specifications
CrystaLatchTM 1x1, 1x2, Solid-State Fiberoptic Switch
CrystaLatchTM Bi-Directional 1x1,1x2 Solid-State Fiberoptic Switch
CrystaLatchTM Single Stage 2x2 Series Fiber Optical Switch
Performance Specifications
Performance Specifications
CrystaLatchTM Mini 1x3,1x4 Solid State Fiberoptic Switch
Performance Specifications
CrystaLatchTM 1x1,1x2, Solid-State Fiberoptic Switch
4 Step Simple Diagram Sample text Sample text Sample text Sample text
CrystaLatchTM 1x3,1x4 Solid State Fiberoptic Switch
4 Steps Thumbs Up Puzzle Diagram
Finding the nth term, Un Example
TTC setup at MSU 6U VME-64 TTC Crate: TTC clock signal is
Presentation transcript:

FOX demonstrator Configuration for LArDPS to eFEX Test -- direct path Rev: 07-Jan-2015

LArDPS to eFEX Test Configuration -- direct path High level diagram of LArDPS to eFEX light path (trivial case)

Trunk Cable M FF M 48 Fibers LArDPS to eFEX Test Configuration – direct path: Optical Insertion Loss Measurement with CMX MTP 48 Fibers Breakout Cable (48) CMX out F in M 12 Fibers M F LC/LC x12 Breakout Cable (12) MTP Above the line EXACTLY matches the setup planned for this FOX demonstrator test

CMX out F in M 12 Fibers M F LC/LC Direct LC-LC connections x12 LArDPS to eFEX Test Configuration – direct path: offset calibration with CMX Breakout Cable (12) MTP

Trunk Cable 48 Fibers M F M F MTP 48 Fibers Breakout Cable (48) Fluke Source Fluke Meter LC/LC Single Fiber SC-LC x1 LArDPS to eFEX Test Configuration – direct path: Optical Insertion Loss Measurement with Fluke handheld meter Above the line EXACTLY matches the setup planned for this FOX demonstrator test

Direct LC-LC connection Fluke Source Fluke Meter LC/LC Single Fiber SC-LC x1 LArDPS to eFEX Test Configuration – direct path: offset calibration with Fluke handheld meter

FOX demonstrator Configuration for LArDPS to eFEX Test -- without splitters

LArDPS to eFEX Test Configuration -- without splitters High level diagram of LArDPS to eFEX light paths

LArDPS to eFEX Test Configuration -- without splitters Detailed connection map between all modules

MM LArDPS to eFEX Test Configuration – without splitters: Optical Insertion Loss Measurement with CMX 48 Fibers Breakout Cable (48) CMX out F in M 12 Fibers M F LC/LC x12 Breakout Cable (12) MTP out in F M M LC/LC Trunk Cable (48) Above the line EXACTLY matches the setup planned for this FOX demonstrator test M M F F F out (LArFOX) (eFOX) x48 FF MTP in Trunk Cable (48) Breakout Cable (48) Trunk Cable (48)

Direct LC-LC connections LArDPS to eFEX Test Configuration – without splitters: offset calibration with CMX – method #1 CMX out F in M 12 Fibers M F LC/LC x12 Breakout Cable (12) MTP

M F M Trunk Cable F 48-Fiber MTP LArDPS to eFEX Test Configuration – without splitters: offset calibration with CMX – method #2 48 Fibers Breakout Cable (48) CMX out F in M 12 Fibers M F LC/LC x12 Breakout Cable (12) MTP

out in F M M LC/LC Trunk Cable (48) M M F F 48 Fibers F out Fluke Source Fluke Meter LC/LC Single Fiber SC-LC (LArFOX) (eFOX) x1 x48 M F M F MTP in LArDPS to eFEX Test Configuration – without splitters: Optical Insertion Loss Measurement with Fluke handheld meter Trunk Cable (48) Breakout Cable (48) Trunk Cable (48) Above the line EXACTLY matches the setup planned for this FOX demonstrator test

Direct LC-LC connection LArDPS to eFEX Test Configuration – without splitters: offset calibration with Fluke -- method #1 Fluke Source Fluke Meter LC/LC Single Fiber SC-LC x1

Trunk Cable 48-Fiber M F M F MTP LArDPS to eFEX Test Configuration – without splitters: offset calibration with Fluke -- method #2 Tentative decision : Not currently planning to use this time-intensive method unless the CMX tests suggest otherwise Fluke Source Fluke Meter LC/LC Single Fiber SC-LC 1xx 1 x1 48 Fibers Breakout Cable (48)

FOX demonstrator Configuration for LArDPS to eFEX Test -- with splitters

LArDPS to eFEX Test Configuration -- with splitters High level diagram of LArDPS to eFEX light paths

LArDPS to eFEX Test Configuration -- with splitters Detailed connection map between all modules (trivial in this case)

MM LArDPS to eFEX Test Configuration – with splitters: Optical Insertion Loss Measurement with CMX 48 Fibers Breakout Cable (48) CMX out F in M 12 Fibers M F LC/LC x12 Breakout Cable (12) MTP out in F M M LC/LC Trunk Cable (48) Above the line EXACTLY matches the setup planned for this FOX demonstrator test M M F F F out (LArFOX) (eFOX) x48 FF MTP in Trunk Cable (48) Breakout Cable (48) With splittters Breakout Cable (48) Trunk Cable (48) x6

The same procedure that was illustrated for the measurements of the LArDPS to eFEX Test Configuration without splitters is also followed here for : Offset calibration with CMX Optical Insertion Loss Measurement with Fluke handheld meter Offset calibration with Fluke LArDPS to eFEX Test Configuration – with splitters:

FOX demonstrator Configuration for LArDPS to gFEX Test -- without splitters

LArDPS to gFEX Test Configuration -- without splitters High level diagram of LArDPS to gFEX light paths

LArDPS to gFEX Test Configuration -- without splitters Detailed connection map between all modules

MM LArDPS to gFEX Test Configuration – without splitters: Optical Insertion Loss Measurement with CMX 48 Fibers 72 Fibers Breakout Cable (72) Breakout Cable (48) CMX out F in M 12 Fibers M F LC/LC x12 Breakout Cable (12) MTP out in F M M LC/LC Trunk Cable (48) Above the line EXACTLY matches the setup planned for this FOX demonstrator test M M F F F out (LArFOX) (gFOX) x48 FF MTP in Trunk Cable (48) Trunk Cable (72) Breakout Cable (48)Breakout Cable (72) Trunk Cable (48)

The same procedure that was illustrated for the measurements of the LArDPS to eFEX Test Configuration without splitters is also followed here for : Offset calibration with CMX Optical Insertion Loss Measurement with Fluke handheld meter Offset calibration with Fluke LArDPS to gFEX Test Configuration – without splitters:

FOX demonstrator Configuration for LArDPS to gFEX Test -- with splitters

LArDPS to gFEX Test Configuration -- with splitters High level diagram of LArDPS to gFEX light paths

LArDPS to gFEX Test Configuration -- with splitters Detailed connection map between all modules

MM LArDPS to gFEX Test Configuration – with splitters: Optical Insertion Loss Measurement with CMX 48 Fibers Breakout Cable (48) CMX out F in M 12 Fibers M F LC/LC x12 Breakout Cable (12) MTP out in F M M LC/LC Trunk Cable (48) Above the line EXACTLY matches the setup planned for this FOX demonstrator test M M F F F out (LArFOX) (gFOX) x48 FF MTP in Trunk Cable (48) Breakout Cable (48) With splittters Trunk Cable (48) x6 72 Fibers Breakout Cable (72) Trunk Cable (72) Breakout Cable (72)

The same procedure that was illustrated for the measurements of the LArDPS to eFEX Test Configuration without splitters is also followed here for : Offset calibration with CMX Optical Insertion Loss Measurement with Fluke handheld meter Offset calibration with Fluke LArDPS to gFEX Test Configuration – with splitters:

Older Slides

CMX 12 Fibers 48 Fibers in out in 48 Fibers 12 Fibers out F F F F F F M M M M LC/LC Trunk Cable

1 Fiber 48 (or 72) Fibers in out in 48 (or 72) Fibers 1 Fiber out F F M M LC/LC Fluke Source Fluke Meter Trunk Cable SC LC

12 Fibers 48 (or 72) Fibers in out in 48 (or 72) Fibers 12 Fibers out F F M M SC/LC LC/LC Fluke Source Fluke Meter 12 Fibers F M Trunk Cable M F 12 Fibers