© 2006 Prentice Hall, Inc.4 – 1 Operations Management Chapter 4 - Forecasting Chapter 4 - Forecasting © 2006 Prentice Hall, Inc. PowerPoint presentation.

Slides:



Advertisements
Similar presentations
© 1997 Prentice-Hall, Inc. S2 - 1 Principles of Operations Management Forecasting Chapter S2.
Advertisements

Operations Management Forecasting Chapter 4
Bina Nusantara Model Ramalan Peretemuan 13: Mata kuliah: K0194-Pemodelan Matematika Terapan Tahun: 2008.
© 2006 Prentice Hall, Inc.4 – 1  Short-range forecast  Up to 1 year, generally less than 3 months  Purchasing, job scheduling, workforce levels, job.
4 Forecasting PowerPoint presentation to accompany Heizer and Render
PRODUCTION AND OPERATIONS MANAGEMENT
© 2006 Prentice Hall, Inc.4 – 1 Operations Management Chapter 4 - Forecasting Chapter 4 - Forecasting © 2006 Prentice Hall, Inc. PowerPoint presentation.
Forecasting.
1 Learning Objectives When you complete this chapter, you should be able to : Identify or Define:  Forecasting  Types of forecasts  Time horizons 
J0444 OPERATION MANAGEMENT
To accompany Quantitative Analysis for Management, 8e by Render/Stair/Hanna 5-1 © 2003 by Prentice Hall, Inc. Upper Saddle River, NJ PERTEMUAN 14.
Operations Management
Operations Management
© 2008 Prentice Hall, Inc.4 – 1 Operations Management Chapter 4 – Forecasting Delivered by: Eng.Mosab I. Tabash Eng.Mosab I. Tabash.
Operations Management
Operations Management Forecasting Chapter 4
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Operations Management Forecasting Chapter 4.
4 Forecasting PowerPoint presentation to accompany Heizer and Render
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Forecasting Operations Chapter 12 Roberta Russell & Bernard.
2. Forecasting. Forecasting  Using past data to help us determine what we think will happen in the future  Things typically forecasted Demand for products.
4 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 4 4 Forecasting.
Mr. David P. Blain. C.Q.E. Management Department UNLV
© 2011 Pearson Education, Inc. publishing as Prentice Hall What is Forecasting?  Process of predicting a future event  Underlying basis of all business.
4 – 1 PSM10 © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render Operations Management, 8e Chapter 4 – Forecasting.
Operations Management
© 2008 Prentice Hall, Inc.4 – 1 Outline – Continued  Time-Series Forecasting  Decomposition of a Time Series  Naive Approach  Moving Averages  Exponential.
4 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry Render.
LSS Black Belt Training Forecasting. Forecasting Models Forecasting Techniques Qualitative Models Delphi Method Jury of Executive Opinion Sales Force.
Time Series “The Art of Forecasting”. What Is Forecasting? Process of predicting a future event Underlying basis of all business decisions –Production.
Operations and Supply Chain Management
Chapter 15 Demand Management & Forecasting
The Importance of Forecasting in POM
IES 371 Engineering Management Chapter 13: Forecasting
Forecasting. What is Forecasting? Process of predicting a future event Underlying basis of all business decisions: Production Inventory Personnel Facilities.
Production Planning and Control. 1. Naive approach 2. Moving averages 3. Exponential smoothing 4. Trend projection 5. Linear regression Time-Series Models.
CLASS B.Sc.III PAPER APPLIED STATISTICS. Time Series “The Art of Forecasting”
© 2006 Prentice Hall, Inc.4 – 1 Forcasting © 2006 Prentice Hall, Inc. Heizer/Render Principles of Operations Management, 6e Operations Management, 8e.
Operations Management
4 Forecasting Demand PowerPoint presentation to accompany
To accompany Quantitative Analysis for Management, 8e by Render/Stair/Hanna Forecasting.
Time-Series Forecasting Learning Objectives 1.Describe What Forecasting Is 2. Forecasting Methods 3.Explain Time Series & Components 4.Smooth a Data.
MBA.782.ForecastingCAJ Demand Management Qualitative Methods of Forecasting Quantitative Methods of Forecasting Causal Relationship Forecasting Focus.
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1.
1 1 Slide Forecasting Professor Ahmadi. 2 2 Slide Learning Objectives n Understand when to use various types of forecasting models and the time horizon.
10B11PD311 Economics. Process of predicting a future event on the basis of past as well as present knowledge and experience Underlying basis of all business.
Operations Management Chapter 4 Forecasting. So What is Forecasting?  Process of predicting a future event  Forecasting is used for all business decisions.
McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved. 3 Forecasting.
4 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 4 4 Forecasting PowerPoint presentation to accompany Heizer and Render Operations Management,
Chapter 4 Class 2.
Production and Operations Management Forecasting session II Predicting the future demand Qualitative forecast methods  Subjective Quantitative.
CHAPTER 2 FORECASTING. LEARNING OBJECTIVES Define forecasting, forecasts approaches Understand the three time horizons Describe, Explain and Apply the.
Welcome to MM305 Unit 5 Seminar Prof Greg Forecasting.
Learning Objectives Describe what forecasting is Explain time series & its components Smooth a data series –Moving average –Exponential smoothing Forecast.
Lecture 18 Forecasting (Continued) Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College, Emeritus,
MGS3100_03.ppt/Feb 11, 2016/Page 1 Georgia State University - Confidential MGS 3100 Business Analysis Time Series Forecasting Feb 11, 2016.
DEPARTMENT OF MECHANICAL ENGINEERING VII-SEMESTER PRODUCTION TECHNOLOGY-II 1 CHAPTER NO.4 FORECASTING.
4 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 4 4 Forecasting.
4 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry Render.
4 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 4 4 Forecasting PowerPoint presentation to accompany Heizer and Render Operations Management,
© 2008 Prentice Hall, Inc.4 – 1 Operations Management Chapter 4 – Forecasting Operations Management, 9e.
© 2008 Prentice Hall, Inc.4 – 1 Operations Management Chapter 4 – Forecasting PowerPoint presentation to accompany Heizer/Render Principles of Operations.
4-1 Operations Management Forecasting Chapter Learning Objectives When you complete this chapter, you should be able to : Identify or Define :
© 2008 Prentice Hall, Inc.4 – 1 Operations Management Chapter 4 – Forecasting PowerPoint presentation to accompany Heizer/Render Principles of Operations.
Welcome to MM305 Unit 5 Seminar Forecasting. What is forecasting? An attempt to predict the future using data. Generally an 8-step process 1.Why are you.
4 - 1© 2011 Pearson Education Influence of Product Life Cycle  Introduction and growth require longer forecasts than maturity and decline  As product.
4 Forecasting Demand PowerPoint presentation to accompany
“The Art of Forecasting”
© 2006 Prentice Hall, Inc.4 – 1 Operations Management Chapter 4 - Forecasting Chapter 4 - Forecasting © 2006 Prentice Hall, Inc. PowerPoint presentation.
Module 2: Demand Forecasting 2.
Prepared by Lee Revere and John Large
Presentation transcript:

© 2006 Prentice Hall, Inc.4 – 1 Operations Management Chapter 4 - Forecasting Chapter 4 - Forecasting © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render Principles of Operations Management, 6e Operations Management, 8e

© 2006 Prentice Hall, Inc.4 – 2 Outline  Global Company Profile: Tupperware Corporation  What Is Forecasting?  Forecasting Time Horizons  The Influence of Product Life Cycle  Types Of Forecasts

© 2006 Prentice Hall, Inc.4 – 3 Outline – Continued  The Strategic Importance Of Forecasting  Human Resources  Capacity  Supply-Chain Management  Seven Steps In The Forecasting System

© 2006 Prentice Hall, Inc.4 – 4 Outline – Continued  Forecasting Approaches  Overview of Qualitative Methods  Overview of Quantitative Methods

© 2006 Prentice Hall, Inc.4 – 5 Outline – Continued  Time-series Forecasting  Decomposition of a Time Series  Naïve Approach  Moving Averages  Exponential Smoothing  Exponential Smoothing with Trend Adjustment  Trend Projections  Seasonal Variations in Data  Cyclical Variations in Data

© 2006 Prentice Hall, Inc.4 – 6 Outline – Continued  Associative Forecasting Methods: Regression And Correlation Analysis  Using Regression Analysis to Forecast  Standard Error of the Estimate  Correlation Coefficients for Regression Lines  Multiple-Regression Analysis

© 2006 Prentice Hall, Inc.4 – 7 Outline – Continued  Monitoring And Controlling Forecasts  Adaptive Smoothing  Focus Forecasting  Forecasting In The Service Sector

© 2006 Prentice Hall, Inc.4 – 8 Learning Objectives When you complete this chapter, you should be able to : Identify or Define:  Forecasting  Types of forecasts  Time horizons  Approaches to forecasts

© 2006 Prentice Hall, Inc.4 – 9 Learning Objectives When you complete this chapter, you should be able to : Describe or Explain:  Moving averages  Exponential smoothing  Trend projections  Regression and correlation analysis  Measures of forecast accuracy

© 2006 Prentice Hall, Inc.4 – 10 Forecasting at Tupperware  Each of 50 profit centers around the world is responsible for computerized monthly, quarterly, and 12-month sales projections  These projections are aggregated by region, then globally, at Tupperware’s World Headquarters  Tupperware uses all techniques discussed in text

© 2006 Prentice Hall, Inc.4 – 11 Tupperware’s Process

© 2006 Prentice Hall, Inc.4 – 12 Forecast by Consensus  Although inputs come from sales, marketing, finance, and production, final forecasts are the consensus of all participating managers  The final step is Tupperware’s version of the “jury of executive opinion”

© 2006 Prentice Hall, Inc.4 – 13 What is Forecasting?  Process of predicting a future event  Underlying basis of all business decisions  Production  Inventory  Personnel  Facilities ??

© 2006 Prentice Hall, Inc.4 – 14  Short-range forecast  Up to 1 year, generally less than 3 months  Purchasing, job scheduling, workforce levels, job assignments, production levels  Medium-range forecast  3 months to 3 years  Sales and production planning, budgeting  Long-range forecast  3 + years  New product planning, facility location, research and development Forecasting Time Horizons

© 2006 Prentice Hall, Inc.4 – 15 Distinguishing Differences  Medium/long range forecasts deal with more comprehensive issues and support management decisions regarding planning and products, plants and processes  Short-term forecasting usually employs different methodologies than longer-term forecasting  Short-term forecasts tend to be more accurate than longer-term forecasts

© 2006 Prentice Hall, Inc.4 – 16 Types of Forecasts  Economic forecasts  Address business cycle – inflation rate, money supply, housing starts, etc.  Technological forecasts  Predict rate of technological progress  Impacts development of new products  Demand forecasts  Predict sales of existing product

© 2006 Prentice Hall, Inc.4 – 17 Strategic Importance of Forecasting  Human Resources – Hiring, training, laying off workers  Capacity – Capacity shortages can result in undependable delivery, loss of customers, loss of market share  Supply-Chain Management – Good supplier relations and price advance

© 2006 Prentice Hall, Inc.4 – 18 Seven Steps in Forecasting  Determine the use of the forecast  Select the items to be forecasted  Determine the time horizon of the forecast  Select the forecasting model(s)  Gather the data  Make the forecast  Validate and implement results

© 2006 Prentice Hall, Inc.4 – 19 The Realities!  Forecasts are seldom perfect  Most techniques assume an underlying stability in the system  Product family and aggregated forecasts are more accurate than individual product forecasts

© 2006 Prentice Hall, Inc.4 – 20 Forecasting Approaches  Used when situation is vague and little data exist  New products  New technology  Involves intuition, experience Qualitative Methods

© 2006 Prentice Hall, Inc.4 – 21 Forecasting Approaches  Used when situation is ‘stable’ and historical data exist  Existing products  Current technology  Involves mathematical techniques Quantitative Methods

© 2006 Prentice Hall, Inc.4 – 22 Overview of Qualitative Methods  Jury of executive opinion  Pool opinions of high-level executives, sometimes augment by statistical models  Delphi method  Panel of experts

© 2006 Prentice Hall, Inc.4 – 23 Overview of Qualitative Methods  Sales force composite  Estimates from individual salespersons are reviewed for reasonableness, then aggregated  Consumer Market Survey  Ask the customer

© 2006 Prentice Hall, Inc.4 – 24  Involves small group of high-level managers  Group estimates demand by working together  Combines managerial experience with statistical models  Relatively quick  ‘Group-think’ disadvantage Jury of Executive Opinion

© 2006 Prentice Hall, Inc.4 – 25 Sales Force Composite  Each salesperson projects his or her sales  Combined at district and national levels  Sales reps know customers’ wants  Tends to be overly optimistic

© 2006 Prentice Hall, Inc.4 – 26 Delphi Method  Iterative group process, continues until consensus is reached  3 types of participants  Decision makers  Staff  Respondents Staff (Administering survey) Decision Makers (Evaluate responses and make decisions) Respondents (People who can make valuable judgments)

© 2006 Prentice Hall, Inc.4 – 27 Consumer Market Survey  Ask customers about purchasing plans  What consumers say, and what they actually do are often different  Sometimes difficult to answer

© 2006 Prentice Hall, Inc.4 – 28 Overview of Quantitative Approaches 1.Naive approach 2.Moving averages 3.Exponential smoothing 4.Trend projection 5.Linear regression Time-Series Models Associative Model

© 2006 Prentice Hall, Inc.4 – 29  Set of evenly spaced numerical data  Obtained by observing response variable at regular time periods  Forecast based only on past values  Assumes that factors influencing past and present will continue influence in future Time Series Forecasting

© 2006 Prentice Hall, Inc.4 – 30 Trend Seasonal Cyclical Random Time Series Components

© 2006 Prentice Hall, Inc.4 – 31 Components of Demand Demand for product or service |||| 1234 Year Average demand over four years Seasonal peaks Trend component Actual demand Random variation Figure 4.1

© 2006 Prentice Hall, Inc.4 – 32  Persistent, overall upward or downward pattern  Changes due to population, technology, age, culture, etc.  Typically several years duration Trend Component

© 2006 Prentice Hall, Inc.4 – 33  Regular pattern of up and down fluctuations  Due to weather, customs, etc.  Occurs within a single year Seasonal Component Number of PeriodLengthSeasons WeekDay7 MonthWeek4-4.5 MonthDay28-31 YearQuarter4 YearMonth12 YearWeek52

© 2006 Prentice Hall, Inc.4 – 34  Repeating up and down movements  Affected by business cycle, political, and economic factors  Multiple years duration  Often causal or associative relationships Cyclical Component

© 2006 Prentice Hall, Inc.4 – 35  Erratic, unsystematic, ‘residual’ fluctuations  Due to random variation or unforeseen events  Short duration and nonrepeating Random Component MTWTFMTWTFMTWTFMTWTF

© 2006 Prentice Hall, Inc.4 – 36 Naive Approach  Assumes demand in next period is the same as demand in most recent period  e.g., If May sales were 48, then June sales will be 48  Sometimes cost effective and efficient

© 2006 Prentice Hall, Inc.4 – 37  MA is a series of arithmetic means  Used if little or no trend  Used often for smoothing  Provides overall impression of data over time Moving Average Method Moving average = ∑ demand in previous n periods n

© 2006 Prentice Hall, Inc.4 – 38 January10 February12 March13 April16 May19 June23 July26 Actual3-Month MonthShed SalesMoving Average ( )/3 = 13 2 / 3 ( )/3 = 16 ( )/3 = 19 1 / 3 Moving Average Example ( )/3 = 11 2 / 3

© 2006 Prentice Hall, Inc.4 – 39 Graph of Moving Average ||||||||||||JFMAMJJASONDJFMAMJJASOND||||||||||||JFMAMJJASONDJFMAMJJASOND Shed Sales – – – – – – – – – – – Actual Sales Moving Average Forecast

© 2006 Prentice Hall, Inc.4 – 40  Used when trend is present  Older data usually less important  Weights based on experience and intuition Weighted Moving Average Weighted moving average = ∑ (weight for period n) x (demand in period n) ∑ weights

© 2006 Prentice Hall, Inc.4 – 41 January10 February12 March13 April16 May19 June23 July26 Actual3-Month Weighted MonthShed SalesMoving Average [(3 x 16) + (2 x 13) + (12)]/6 = 14 1 / 3 [(3 x 19) + (2 x 16) + (13)]/6 = 17 [(3 x 23) + (2 x 19) + (16)]/6 = 20 1 / 2 Weighted Moving Average [(3 x 13) + (2 x 12) + (10)]/6 = 12 1 / 6 Weights AppliedPeriod 3Last month 2Two months ago 1Three months ago 6Sum of weights

© 2006 Prentice Hall, Inc.4 – 42 Moving Average And Weighted Moving Average – – – – – 5 5 – Sales demand ||||||||||||JFMAMJJASONDJFMAMJJASOND||||||||||||JFMAMJJASONDJFMAMJJASOND Actual sales Moving average Weighted moving average Figure 4.2

© 2006 Prentice Hall, Inc.4 – 43  Form of weighted moving average  Weights decline exponentially  Most recent data weighted most  Requires smoothing constant (  )  Ranges from 0 to 1  Subjectively chosen  Involves little record keeping of past data Exponential Smoothing

© 2006 Prentice Hall, Inc.4 – 44 Exponential Smoothing New forecast =last period’s forecast +  (last period’s actual demand – last period’s forecast) F t = F t – 1 +  (A t – 1 - F t – 1 ) whereF t =new forecast F t – 1 =previous forecast  =smoothing (or weighting) constant (0    1)

© 2006 Prentice Hall, Inc.4 – 45 Exponential Smoothing Example Predicted demand = 142 Ford Mustangs Actual demand = 153 Smoothing constant  =.20

© 2006 Prentice Hall, Inc.4 – 46 Exponential Smoothing Example Predicted demand = 142 Ford Mustangs Actual demand = 153 Smoothing constant  =.20 New forecast= (153 – 142)

© 2006 Prentice Hall, Inc.4 – 47 Exponential Smoothing Example Predicted demand = 142 Ford Mustangs Actual demand = 153 Smoothing constant  =.20 New forecast= (153 – 142) = = ≈ 144 cars

© 2006 Prentice Hall, Inc.4 – 48 Impact of Different  – – – – ||||||||| ||||||||| Quarter Demand  =.1 Actual demand  =.5

© 2006 Prentice Hall, Inc.4 – 49 Choosing  The objective is to obtain the most accurate forecast no matter the technique We generally do this by selecting the model that gives us the lowest forecast error Forecast error= Actual demand - Forecast value = A t - F t

© 2006 Prentice Hall, Inc.4 – 50 Common Measures of Error Mean Absolute Deviation (MAD) MAD = ∑ |actual - forecast| n Mean Squared Error (MSE) MSE = ∑ (forecast errors) 2 n

© 2006 Prentice Hall, Inc.4 – 51 Common Measures of Error Mean Absolute Percent Error (MAPE) MAPE = 100 ∑ |actual i - forecast i |/actual i n n i = 1

© 2006 Prentice Hall, Inc.4 – 52 Comparison of Forecast Error RoundedAbsoluteRoundedAbsolute ActualForecastDeviationForecastDeviation Tonnagewithforwithfor QuarterUnloaded  =.10  =.10  =.50  =

© 2006 Prentice Hall, Inc.4 – 53 Comparison of Forecast Error RoundedAbsoluteRoundedAbsolute ActualForecastDeviationForecastDeviation Tonagewithforwithfor QuarterUnloaded  =.10  =.10  =.50  = MAD = ∑ |deviations| n = 84/8 = For  =.10 = 100/8 = For  =.50

© 2006 Prentice Hall, Inc.4 – 54 Comparison of Forecast Error RoundedAbsoluteRoundedAbsolute ActualForecastDeviationForecastDeviation Tonagewithforwithfor QuarterUnloaded  =.10  =.10  =.50  = MAD = 1,558/8 = For  =.10 = 1,612/8 = For  =.50 MSE = ∑ (forecast errors) 2 n

© 2006 Prentice Hall, Inc.4 – 55 Comparison of Forecast Error RoundedAbsoluteRoundedAbsolute ActualForecastDeviationForecastDeviation Tonagewithforwithfor QuarterUnloaded  =.10  =.10  =.50  = MAD MSE = 45.62/8 = 5.70% For  =.10 = 54.8/8 = 6.85% For  =.50 MAPE = 100 ∑ |deviation i |/actual i n i = 1

© 2006 Prentice Hall, Inc.4 – 56 Comparison of Forecast Error RoundedAbsoluteRoundedAbsolute ActualForecastDeviationForecastDeviation Tonnagewithforwithfor QuarterUnloaded  =.10  =.10  =.50  = MAD MSE MAPE5.70%6.85%

© 2006 Prentice Hall, Inc.4 – 57 Trend Projections Fitting a trend line to historical data points to project into the medium-to-long-range Linear trends can be found using the least squares technique y = a + bx ^ where y= computed value of the variable to be predicted (dependent variable) a= y-axis intercept b= slope of the regression line x= the independent variable ^

© 2006 Prentice Hall, Inc.4 – 58 Least Squares Method Time period Values of Dependent Variable Figure 4.4 Deviation 1 Deviation 5 Deviation 7 Deviation 2 Deviation 6 Deviation 4 Deviation 3 Actual observation (y value) Trend line, y = a + bx ^

© 2006 Prentice Hall, Inc.4 – 59 Least Squares Method Time period Values of Dependent Variable Figure 4.4 Deviation 1 Deviation 5 Deviation 7 Deviation 2 Deviation 6 Deviation 4 Deviation 3 Actual observation (y value) Trend line, y = a + bx ^ Least squares method minimizes the sum of the squared errors (deviations)

© 2006 Prentice Hall, Inc.4 – 60 Least Squares Method Equations to calculate the regression variables b =  xy - nxy  x 2 - nx 2 y = a + bx ^ a = y - bx

© 2006 Prentice Hall, Inc.4 – 61 Least Squares Example b = = = ∑xy - nxy ∑x 2 - nx 2 3,063 - (7)(4)(98.86) (7)(4 2 ) a = y - bx = (4) = TimeElectrical Power YearPeriod (x)Demandx 2 xy ∑x = 28∑y = 692∑x 2 = 140∑xy = 3,063 x = 4y = 98.86

© 2006 Prentice Hall, Inc.4 – 62 Least Squares Example b = = =  xy - nxy  x 2 - nx 2 3,063 - (7)(4)(98.86) (7)(4 2 ) a = y - bx = (4) = TimeElectrical Power YearPeriod (x)Demandx 2 xy  x = 28  y = 692  x 2 = 140  xy = 3,063 x = 4y = The trend line is y = x ^

© 2006 Prentice Hall, Inc.4 – 63 Least Squares Example ||||||||| – – – – – – – – – – – – Year Power demand Trend line, y = x ^

© 2006 Prentice Hall, Inc.4 – 64 Least Squares Requirements 1.We always plot the data to insure a linear relationship 2.We do not predict time periods far beyond the database 3.Deviations around the least squares line are assumed to be random

© 2006 Prentice Hall, Inc.4 – 65 Associative Forecasting Used when changes in one or more independent variables can be used to predict the changes in the dependent variable Most common technique is linear regression analysis We apply this technique just as we did in the time series example

© 2006 Prentice Hall, Inc.4 – 66 Associative Forecasting Forecasting an outcome based on predictor variables using the least squares technique y = a + bx ^ where y= computed value of the variable to be predicted (dependent variable) a= y-axis intercept b= slope of the regression line x= the independent variable though to predict the value of the dependent variable ^

© 2006 Prentice Hall, Inc.4 – 67 Associative Forecasting Example SalesLocal Payroll ($000,000), y($000,000,000), x – 3.0 – 2.0 – 1.0 – ||||||| ||||||| Sales Area payroll

© 2006 Prentice Hall, Inc.4 – 68 Associative Forecasting Example Sales, y Payroll, xx 2 xy ∑y = 15.0∑x = 18∑x 2 = 80∑xy = 51.5 x = ∑x/6 = 18/6 = 3 y = ∑y/6 = 15/6 = 2.5 b = = =.25 ∑xy - nxy ∑x 2 - nx (6)(3)(2.5) 80 - (6)(3 2 ) a = y - bx = (.25)(3) = 1.75

© 2006 Prentice Hall, Inc.4 – 69 Associative Forecasting Example 4.0 – 3.0 – 2.0 – 1.0 – ||||||| ||||||| Sales Area payroll y = x ^ Sales = (payroll) If payroll next year is estimated to be $600 million, then: Sales = (6) Sales = $325,

© 2006 Prentice Hall, Inc.4 – 70  How strong is the linear relationship between the variables?  Correlation does not necessarily imply causality!  Coefficient of correlation, r, measures degree of association  Values range from -1 to +1 Correlation

© 2006 Prentice Hall, Inc.4 – 71 Correlation Coefficient r = n  xy -  x  y [n  x 2 - (  x) 2 ][n  y 2 - (  y) 2 ]

© 2006 Prentice Hall, Inc.4 – 72 Correlation Coefficient r = n∑xy - ∑x∑y [n∑x 2 - (∑x) 2 ][n∑y 2 - (∑y) 2 ] y x (a)Perfect positive correlation: r = +1 y x (b)Positive correlation: 0 < r < 1 y x (c)No correlation: r = 0 y x (d)Perfect negative correlation: r = -1

© 2006 Prentice Hall, Inc.4 – 73  Coefficient of Determination, r 2, measures the percent of change in y predicted by the change in x  Values range from 0 to 1  Easy to interpret Correlation For the Nodel Construction example: r =.901 r 2 =.81

© 2006 Prentice Hall, Inc.4 – 74 Multiple Regression Analysis If more than one independent variable is to be used in the model, linear regression can be extended to multiple regression to accommodate several independent variables y = a + b 1 x 1 + b 2 x 2 … ^ Computationally, this is quite complex and generally done on the computer

© 2006 Prentice Hall, Inc.4 – 75 Multiple Regression Analysis y = x x 2 ^ In the Nodel example, including interest rates in the model gives the new equation: An improved correlation coefficient of r =.96 means this model does a better job of predicting the change in construction sales Sales = (6) - 5.0(.12) = 3.00 Sales = $300,000

© 2006 Prentice Hall, Inc.4 – 76  Measures how well the forecast is predicting actual values  Ratio of running sum of forecast errors (RSFE) to mean absolute deviation (MAD)  Good tracking signal has low values  If forecasts are continually high or low, the forecast has a bias error Monitoring and Controlling Forecasts Tracking Signal

© 2006 Prentice Hall, Inc.4 – 77 Monitoring and Controlling Forecasts Tracking signal RSFEMAD= = ∑(actual demand in period i - forecast demand in period i)  ∑|actual - forecast|/n)

© 2006 Prentice Hall, Inc.4 – 78 Tracking Signal Tracking signal + 0 MADs – Upper control limit Lower control limit Time Signal exceeding limit Acceptable range