Gluing trials continuing: Loctite 36525 is favourite (for Dispensemaster) Bonding: exercising the machine; practising in laying down patterns (Simon and.

Slides:



Advertisements
Similar presentations
LHCb VELO Production Visit November 9 th 2005 Introduction to staff Status Schedule.
Advertisements

1 Liverpool Production Status Week of 23 February 2007.
1 Liverpool Production Status Week of 02 March 2007.
Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
ATLAS Module building at Glasgow
Hybrid assembly at Glasgow. Placing ASICs Arrange 20 ASICs in ASIC tray with strip bond pads facing outwards – ASICs to be used in ‘Cat A’ sample boxes.
Design Ash finished electric hybrid tracing to connector fields –Changes to allow for HCC-less and HCC running on one hybrid awaiting final confirmation.
Exercise Exercise3.1 8 Exercise3.1 9 Exercise
Place your document(s) you are going to scan either on the glass or in the Automatic Document Feeder Press the Scanner button from the list of available.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 30 June Sam Burke UCSB HEP Group.
Exercise Exercise Exercise Exercise
Exercise Exercise Exercise Exercise
Exercise Exercise6.1 7 Exercise6.1 8 Exercise6.1 9.
Place your document(s) you are going to scan either on the glass or in the Automatic Document Feeder Press the Scanner button from the list of available.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 7 July 2003 Sam Burke UCSB HEP Group.
2 May 2013 Juergen Thomas: ATLAS Tracker Upgrade Module Chip-Bonding and Test Setup 1 ATLAS Tracker Upgrade: Hybrid Wire-Bonding and Test Setup at Birmingham.
S Pyatt Cicorel optimised welding parameters. S Pyatt 30 degree loop parameters.
Ladder QA Status. Ladder QA Summary Ladder Remarks 1XXXXXXXXOOOOOXOO left : short (via-GND) right chip3 : cannot mask 2OOOOOOOOOOOOOOO.
Andy Blue Glasgow Update. Andy Blue WP3 Meeting UV Glue In November, I sent UV Glue, hybrid panel + jig to Anglo Production Process LTD –UK supplier of.
Notes, Chords & Fingering for keyboard, guitar & recorder
Tooling and assembly of US stavelet at Berkeley S. Díez Cornell, C. H. Haber, M. Defferrard, R. Witharm Sept 6th, 2012 Berkeley mechanical meeting, 5th-7th.
Received new "130nm" jigs from Liverpool and after the "module workshop" 25/3/15 at Liverpool and ready to make dummy modules New jigs need to be slotted.
S Pyatt Dummy module with copper on glass sensor An adhesive tape has been identified that is suitable for dummy module building. This tape can be stuck.
ORTHOGRAPHIC PROJECTION. NAME: ORTHOGRAPHIC PROJECTION DATE: ELEVATION END VIEW PLAN END VIEW.
LHCf Arm2 – status of hardware upgrade in Firenze Lorenzo Bonechi 20 December 2013.
MarNet Café Internet Services How to search the internet Click on one of the buttons below: How to select a search engine Benefits of a search engine Find.
Preparations for Irradiation of ABCN250-Hybrid (1) 10 th August 2015, Petal/Stave Meeting Following-up on Craig’s plans for irradiation at the B’ham cyclotron:
Andy Blue Glasgow Update. Andy Blue WP3 Meeting Summary ESD Protection –Part all arrived and installed Compressed Air Controls –New lines and panel being.
Petalet-Stavelet; 13 July Birmingham Update Gluing to mechanical sensor with Epolite (as reported earlier). 1 st hybrid – too much glue on stencil.
Birmingham Update Module bonding (Sam and Simon) Great difficulty bonding on to patterned glass ASICs. (OK on sensor). After 1 st two rows of bonds, abandon.
S Pyatt UV glue dispensing studies on the Dima Dotmaster 1.
Hybrid panel heated plate study Currently the curing of the ASIC glue for the hybrid panels are done at room temperature. This is a study to determine.
Stave Hybrid/Module Status. Modules Stave Module Building 2 Mechanical Chip Gluings Mechanical Wirebonding Electrical Chip Gluings Electrical Wirebondings.
WP3_Bham; 10July 2014; John Wilson1 Gluing: more investigations (Simon and Sam) New clamping method provides a good base for systematic studies. Sketch.
Stress/Strain Measurement
Birmingham update: making modules? ASICS to hybrid Gluing: many trials i) heated plate with silver loaded (8 hybrids i.e. 1 panel per day) ii) UV cured.
Click here to begin HOW TO FIND RESEARCH THESIS HOW TO FIND RESEARCH THESIS.
Gluing, measuring and shearing Heated plate curing Is the process feasible? Tests with 130nm hybrids Measure resulting glue thickness Determine the shear.
WP3_Bham; 29May 2014; John Wilson1 Heated plate curing Tests with 130nm hybrids and glass ASICs the glue thickness is controllable. i)Room temp curing.
Update from Birmingham Phil Allport, Daniel Briglin, James Broughton, Andy Chisholm, Laura Gonella, Kostas Nikolopoulos, Simon Pyatt, Juergen Thomas, John.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
Thermo-Mechanical Modules 10 th August 2015, Petal/Stave Meeting Strip Module Meeting; 26th October Phil Allport, Matt Baca, Daniel Briglin, James.
HOW TO FIND RESEARCH PROJECT PAPER HOW TO FIND RESEARCH PROJECT PAPER Click here to begin.
Intelligent Random Box Sizer Animated Flow. Intelligent Random Box Sizer Animated Flow Boxes placed onto Infeed Conveyor.
S Pyatt 1 UV glue dispensing studies on the Dima Dotmaster Glue gap checks.
WP3; 15 Jan 2015; John Wilson.1 Birmingham Update All back and operational after Christmas! Simon in contact with Dario Ariza at DESY re gluing (Boron.
Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with.
Thermo-Mechanical Modules 10 th August 2015, Petal/Stave Meeting Strip Module Meeting, 9 th November Phil Allport, Matt Baca, Daniel Briglin, James.
Assembly and Test of the Spectrometer (H.P. Apr. 16,1998) Status Module Assembly and Tests 1.) Status of completed hybrids and module 2.) Summary of the.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
WP3_Bham; 15May 2014; John Wilson1 Heated plate curing Tests with 130nm hybrids and glass ASICs i) Room temp curing the glue thickness is controllable.
Birmingham Status ASIC shear tests (250nm Panel with hybrids cured at room temp and with heated plate, sent to Berlin for shear testing. (Complication:
TM Module Measurements (1) 10 th August 2015, Petal/Stave Meeting Strip Module Meeting; 26th October Phil Allport, Matt Baca, Daniel Briglin, James.
Thermo-mechanical petals Volker Prahl, Sergio Díez, on behalf of the petal community CERN AUW, 3 rd Nov 2014.
Andy Blue WP3 - Glasgow Update Andy Blue. WP3 Meeting Update Module Building –2 nd Module (FZ1) wire bonded last week –Tested on Mon –Re-works yesterday/today.
Infrastructure & issues and solutions for ATLAS Upgrade Hybrid/Module strip bonding Fred Doherty, Joe Ashby, Fiona McEwan & Calum Gray ATLAS Upgrade Module.
→ need to guide UV light into gap; also beware temp effects
Glue curing studies (contd)
+ Steve Worm (since Monday)
Lecture on Static Electricity
ITK Strip Module Meeting; 12st October 2015
End Cap.
Module building: plans & inventory
Halving.
UV glue dispensing studies
ATLAS Upgrade Module Bonding Trials Using Glass Asics
ATLAS ITK WP3 WP3 Bi-weekly meeting
Group meeting, 2nd Sept, 2013; JAW
Update from Birmingham
Presentation transcript:

Gluing trials continuing: Loctite is favourite (for Dispensemaster) Bonding: exercising the machine; practising in laying down patterns (Simon and Sam) Now gluing two hybrids with Traduct : glue on to patterned glass. Current Status and News Simon Pyatt Sam Edwards Juergen Thomas John Wilson Phil Allport Loctite 3525 Dymax 6621

ASICs Plain glass = 198; Patterned glass = 13 Glue UV : all sent to Glasgow Traduct (ASIC/hybrid) = 9 Epolite (Hybrid/Sensor) = 7 (+1 in freezer currently being reused) Sensors Plain glass = 7 Patterned glass = 2 (or are these mechanicals?) Hybrids Brown (12 over 2 panels; 7 RH sided + 5 left hand sided); Green (2 full; one is the standard calibration measure – so not usable?) ASIC boxes : 21 empty. Conclude: Spare plain glass ASICs to swap/send but very short of “patterned glass” Stocktaking