Safety in LS1 Thomas Otto, TE DSO.

Slides:



Advertisements
Similar presentations
2 3 There are two basic areas where there is a need to have resources available. Internal:  Financial  Personnel  Assets  Time External  Consultants.
Advertisements

Customer Service & Customer Protection in MANSELL
School Safety Training
Pamela Simpson MCSP Moving And Handling Consultant.
Regulatory Body MODIFIED Day 8 – Lecture 3.
PART IX: EMERGENCY EXPOSURE SITUATIONS Module IX.1: Generic requirements for emergency exposure situations Lesson IX.1-2: General Requirements Lecture.
Health and Safety.
Protection Against Occupational Exposure
Internal Auditing and Outsourcing
/0203 Copyright ©2002 Business and Legal Reports, Inc. BLR’s Safety Training Presentations Safety and Health Program.
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
Introduction Definition Advantages for employees and employers
Adverse Event Management from the HSE perspective E. Cennini / DGS-SEE EDMS Id Adverse events Workshop Creating a common understanding.
CLIC CES Webex 12 Nov Summary: – Set of fire safety measures defined in CERN Safety Report – Proposed Structure for CLIC/ILC Fire Safety Report Fabio.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
The Issues of Budgetary Reform Unit 3. PFM Reform – Change Management Module 3.2. Preparing and managing a reform programme.
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
1 GOVERNANCE in COMMUNITY ORGANISATIONS Community Solutions- NESB Community Safety Development and Coordination Project Auspiced by Illawarra Forum Inc.
Health and Safety Policy
Helium Spill Test in LHC tunnel to define length of restricted working areas  Actual situation  Evolution  How to continue  Set-up of the spilling.
Flanders project application and appraisal How it supports partnership.
Risk Management NDS Forum June 23 rd Example safety objective Objective 1: To protect the health, safety & welfare of employees and people at our.
Prime Responsibility for Radiation Safety
Thomas Otto (TE DSO), Safety Officer in Charge of LS1. 37th LSC, Thomas Otto, Safety Officer in charge of LS11.
SEVESO II transposition and implementation – possible approaches and lessons learned from MS/NMS SEVESO II transposition and implementation – possible.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
Access zones and Training Steve Hutchins BE-ASR IEFC workshop 7/3/2012.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Regulatory Authority.
1 Confined Space Safety 2 Why Are Confined Spaces Dangerous? Hazards are not obvious Lack of ventilation Difficult for: –Employees to exit –Rescue teams.
Division of Risk Management State of Florida Loss Prevention Program.
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
Thomas Otto, Safety Officer, TE Dept. Evacuation at Point 5 Summary of Facts 11th LSC, Thomas Otto, TE Safety Officer3 13:26One ODH alarm.
Lessons from Programme Evaluation in Romania First Annual Conference on Evaluation Bucharest 18 February 2008.
How to write a risk assessment
Student Leadership Responsibilities The Student accepts the responsibilities of leadership and follower ship.
J. Pedersen EN DSO Performance Scientific performance Measurable, reproducible, controllable: Documented presence! Technical performance Measurable,
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part III.
Safety in LS1 Thomas Otto, TE DSO.
The new approach to the CERN Safety Policy and Safety Organisation A. Goehring-Crinon & R. Trant.
LS2 Safety Thomas Otto, LS2 Safety Coordinator.
Göteborg Incident Management National guidelines from Denmark Iben Louring Mortensen (Danish Road Directorate)
1 City of Shelby Wastewater Treatment Division Becomes State’s Second Public Agency to Implement a Certified Environmental Management System CERTIFICATION.
Last but not least : LS2 General Safety 1 Thomas Otto, LS2 Safety Coordinator for LHC Ana-Paula Bernardes, LS2 Safety Coordinator for Injectors.
Radiation Safety Regulations
ADO-PO Section Meeting Safety Activities Sigi Wenig (LEXGLIMOS) 8 September 2015.
ISM Code 2010: Part A - Implementation Malcolm Maclachlan.
ALARA REVIEW WORKING GROUP (ARWG) New ALARA recommendations proposed by the ALARA REVIEW WORKING GROUP (ARWG) Heinz Vincke on behalf of ARWG LS1 committee.
Quality Assurance Overview Ranko Ostojic 12 Nov 2012.
Thomas Otto (TE DSO), Safety Officer in Charge of LS1. 38th LSC, Thomas Otto, Safety Officer in charge of LS11.
Radiation Protection computing tools Gérald Dumont HSE/RP.
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. General.
Safety and Health Program Don Ebert- Risk Manager (509)
Health & Safety for School Governors Presented by Phil West Health and Safety Advisor RBWM.
ALARA IMPLEMENTATION AT UKRAINIAN NPPs T. Lisova, Nuclear Energy Department, Ministry of Fuel and Energy of Ukraine Y. Roshchyn, National Nuclear Energy.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer With contributions by -Paolo Ferrcin and Ezio Todesco, TE-MSC -Francesca Viggiano,
BUDGET 4Distribution of budget per phases of the project; 4Itemization of budget; 4Division of budget per source of contribution; 4Division of budget between:
Start Tasks Hand in resubmissions for unit 1 Update homework tracker
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
Equipment simplified model SMR UR safety
Safety considerations for SM-18 control room
Safety in Construction and Upgrade Phases
HSE rules & regulations
Cryogenic Risk Assessment in LHC
Regulatory Oversight of HOF in Finland
United Nations Voluntary Fund on Disability (UNVFD)
ESS Handbook for Radiation Protection
Presentation transcript:

Safety in LS1 Thomas Otto, TE DSO

Contents Thomas Otto, TE DSO2 Safety Performance in LS1 (few stats) What has worked well ? What could be improved ? Summary

What worked well: Preparation Thomas Otto, TE DSO3 Technical preparation of critical projects: Procedures incl. Safety measures Conformity of mechanical equipment Pre-LS1 Training on the job ALARA approach for radiation protection LS1-specific training: LS1 sensibilisation on SIR 2-level RP training (e-learning for most LS1 participants) Technical solutions: IMPACT for activity planning TREC for equipment from radiation areas Automatisation of operational dosimetry

What worked well: Flexibility Thomas Otto, TE DSO4 Safe solutions for unforeseen issues Relax hard-hat and Self Rescue Mask rules at fixed workstations Introduce bump-caps under clearly defined conditions Ad-Hoc decisions with Safety Relevance Ventilation speed for geometers Work-arounds to failing LHC lifts (means of evacuation) What to do when a “safe area” is temporarily unavailable ? Co-activities during equipment check-out

What worked well: Management Thomas Otto, TE DSO5 Project Coordination 16 persons fully employed in coordination activities (of which 6 Safety coordinators) Fire Safety: control over max. personnel in tunnel sector Safety officer cooperation Sharing of tasks Similar solutions for similar problems Communication with Project Management Presence of Safety Officers in restricted and public committees All Project / Sub-Project Managers had an open door

What could be improved: Preparation Thomas Otto, TE DSO6 Observation: Most LS1 accidents were suffered on the surface, where no specific prevention measures were taken Recommendation: Preparation of procedures with accident prevention measures for all sub-projects A model can be made available from the SMACC project

What could be improved: Training Thomas Otto, TE DSO7 Observation: The major positive reforms (LS1, RP) were implemented in the last minute (February 2013) Recommendation: Freeze Safety Training several months before LS to allow all persons to conform To make it happen: Assess Safety training needs for the project Based on early risk assessment

What could be improved: Training (2) Thomas Otto, TE DSO8 Observation: Language barrier in Electrical Safety training for electricians (PJAS / COAS) Recommendations: Develop CERN-specific electrical safety training also for electricians Accept foreign safety training status of electricians

What could be improved (3) ? Thomas Otto, TE DSO 9 Observation: Last-minute Safety measures, after budgets have been allocated. (Special vacuum cleaners) Recommendation: Freeze all Safety measures well before LS Allows consideration in budget allocation And inclusion in contractual documents Observation: Increase of the number of co-activities towards the end of LS1: Last minute jobs Recommendation Properly plan all interventions Allow co-activity / last minute jobs only under well-justified circumstances

Safety Summary whatI - keepII - improveIII – change List the different aspects in the management of the work carried out during the LS1 Define what should be kept and was an added value during the LS1 Define what you propose to improve in order to better manage the LS2 Define what was a bottleneck to carry out the work during the LS1 and needs to be changed for LS2 Safety TrainingLS specific safety training Training targeted to risk profile of person Freeze access and training req’s early Assess training needs electrical training for electricians Safety training centre Safety RulesFreeze well before LS Procedures & Accident prevention Extend to all subprojects ALARA approachWorked wellTake preparatory work into account (radioactive) waste & material Better disciplineStorage space (in progress) Radioactive work areas Need to be identified and (temporarily) classified (in progress) Coordination Keep at similar level Last minute jobs Only with serious justification Thomas Otto, TE DSO10