Strategic Plan Todd Skiles –
Webelos Camps are the single most popular program at Goshen. They sell out each year. Key to long-term retention and growth. Existing Program Gear is showing age. ◦ “ ‘yaks have cracks” Proposal Assumes: ◦ Maintaining current camps. ◦ Same approach at both camps allowing for customization by staff.
Tier 1 Level – Purchases with focus on long- term maintenance. Tier 2 Level – Construction Projects Tier 3 Level – Managerial and Service
2013 ◦ Telescopes - $4,000 2 Dobsonian and 2 Refractors each per camp. (8 total) ◦ Compound Bows - $2,500 (10 per camp) ◦ Kayaks, 10 per camp - $9,000 ◦ Tools for both camps - $4000 2014 ◦ Rowboats with oars/locks - $5,000 (phase 1) 2015 ◦ Return of “The Blob” - $13,000* ◦ Rowboats Phase 2 - $5,000* *Dependency on Tier 2 Construction
2013 – Not Feasible ◦ Expand PMI Parking - $4000 2014 ◦ Expanded Aquatic Frontage - $75,000 ◦ Theme Area Construction (the “set”) - $60,000 ◦ Additional field areas - $45,000 ◦ Exhanced Shooting Pavilions – Archery - $50, ◦ Second Dock - $30,000 ◦ Additional Pavilions (4 total, 2 powered) - $150,000 ◦ Expanded Shooting Pavilions – BBs - $50,000 *rough estimates only – needs better cost analysis
2013 – can a slight mod be made with the team building the spillway to clear additional space at PMI for parking? Ross needs a permanent archery facility rather than just canopies.
Recommend one electrified pavilion at both PMI and Ross to support Nature. ◦ Could include aquariums, cold storage for bait, etc. ◦ Convert existing Nature Pavilion at Ross to other program. ◦ Existing PMI Pavilion could be modified. ◦ Consider Nature next to lake to support fishing program and use the secondary docks proposed.
2013 ◦ Expand waste management contract to include recycling – approx $500 per camp for the season. ◦ Discretionary Income for Camp Staff – improve flexibility to address program needs. $500 per year per camp to start. 2014 ◦ Expand camp to 7 weeks ◦ Or build a third Webelos Camp ◦ Additional weeks bring in additional revenue ◦ Partnership programs reach whole new sources of revenue and promote staff opportunities
Recommendation Cost TOTAL $ 24, $ 236, $ 249, $ 501, Tier 1 - Purchases Telescopes $ 4, Kayaks $ 9, Iceberg $ 13, Compound Bows $ 2, Tools $ 4, New rowboats – smaller, more age appropriate $ 5, $ 10, Tier 2 - Construction PMI Parking$ 4, Expand Aquatics Frontage $ 75, Second Dock $ 30, Theme Areas $ 60, Additional Program Pavilions $ 150, Additional Field Areas $ 45, Dining Hall Expansion Expanded Shooting/Archer Pavilions $ 50, $ 100, Tier 3 - Managerial Expand to 7 weeks x x Income Recycling Program $ 1, Annual Fee Discretionary Spending for Camp Staff $ 1, $ 3,000.00
Better alarm system for both camps – not electrical. Improved electrical system at Showerhouses Improved drainage within Showerhouses Improved electrical systems in Staff Site Laundry Facilities at PMI Repairs and better structure behind PMI campfire site