GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford Linear Accelerator Center I&T Subsystem Manager Gamma-ray Large Area Space Telescope
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #2 I & T Responsibility LAT I&T Verification and Calibration Flow VibeRandom vibrate/sine sweepAccAcceptance test level AcAcousticQual Qualification test level T-CThermal-cycle at 1 atmosphereEMEngineering Model T-VThermal-vacuum cycle testTMThermal model EMIElectro-magnetic interference testQUQualification Unit FUFlight Unit Qualification unit testsCalCalibration Flight unit/spare tests I&T: Beam test QU – 4 towers Cal Elec: EM2 TEM, DAC, SIU TKR: QA-B from TKR fab CAL: F1-2 from CAL fab CAL: QA-B from CAL fab TKR: F1-2 from TKR fab Calibration Unit - QU Elec: Qual SIU for EGSE Obs: Vibe/Ac Observatory Acc Obs: T-V Observatory Acc Obs: EMI Observatory Acc Mech: Flt Rad’s from Mech I&T: LAT Functional, Airborne cosmic E to EAcc,Cal I&T: LAT Environmental Tests Acc, Cal TKR/CAL: F1,2 from QU I&T: LAT Assembly, Test Acc, Cal Elec: Flt SIU’s to LAT I&T CAL: F3-16 from CAL fab TKR: F3-16 from TKR fab Mech: Flt Grid from Mech ACD: ACD to LAT I&T Flight LAT - FU
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #3 Level III Requirements Summary Science Requirements –Defined by Instrument Performance Spec LAT-SS –Verification will be performed by a combination of particle tests Cosmic Ray Van de Graff End Station A Beam Test Design Requirements –Test methodology defined by Mission Assurance Requirements 433-MAR-0001 –Instrument Verification will be performed by Electrical Performance Tests Structural and Mechanical Tests EMC/EMI Tests Thermal Verification Tests Visual Inspection Instrument Monitoring End-to-end test (at ~ 35,000 ft in a jet airplane during transport to NRL for environmental tests). –Produce a Working Instrument
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #4 I&T Status PDR presentations complete. PDR report complete. Design Products complete. Level III requirements complete. Larry Wai on board as Integration, Facilities, Configuration, and Test Department Manager. Mr./Ms. XXX on board as Mechanical Ground Support Equipment Department Manager. EGSE Level III requirements complete. Contamination Plan Complete. Calibration Plan Complete. Particle Test Plan Complete. RFI for commercial air transport of LAT to NRL complete. RFI for Environmental Tests of LAT complete.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #5 I&T Management I&T WBS Interfaces Subsystem WBS Interfaces Reliability and QA Mission I&T (S/C Integration Planning, I&T Test support, LV Integration Planning, LV Integration Support, Launch Support) Calibration Unit I&T (Calibration Unit Integration, Test and Beam Testing) Flight LAT I&T (LAT Integration, Performance Testing Mechanical Testing, Thermal Testing, LAT Delivery) Components from Subsystems for Towers 1 & 2, Electronics Components from Subsystems for Towers 3 – 16, Electronics, ACD Flight towers 1&2 Full LAT I&T Preparation (I&T Development, Calibration Test Development, Integration Facilities) Interfaces w/ all other sections
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #6 I&T Organization Chart I&T Engineer B. Grist WBS Reliability & QA D. Marsh WBS Environmental Test Manager M. Lovellette Online Manager R. Claus Science Verification, Analysis, and Calibration E. do Couto e Silva Particle Test Manager G. Godfrey Integration, Facilities, Configuration, and Test L. Wai Instrument Operations Coordinator S. Williams I&T Preparation EM1 Model I&T Calibration Unit I&T Flight LAT I&T Mission I&T Support I&T Preparation EM1 Model I&T Calibration Unit I&T Flight LAT I&T Mission I&T Support I&T Preparation Flight LAT I&T Mission I&T Support I&T Preparation EM1 Model I&T Calibration Unit I&T Flight LAT I&T Mission I&T Support Mechanical Ground Support Equipment TBD I&T Manager Elliott Bloom WBS 4.1.9
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #7 Level III Milestones Chart will be provided by project controls
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #8 Level IV Milestones Chart will be provided by project controls
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #9 Integration and Test Cost Should be a line plot of estimate/fund vs. actual (This section will be provided by LAT Project office)