Injection/extraction R&D Summary S. Guiducci (INFN), Thomas Mattison (UBC) KEK - ILCDR07, 18-20 Dec 207.

Slides:



Advertisements
Similar presentations
February 7, 2007-Beijing (Zisman-DR) Global Design Effort 1 Damping Ring EDR Plans Michael S. Zisman, Jie Gao, Susanna Guiducci, Andy Wolski DR Area System.
Advertisements

September 28, 2006-Cornell (Zisman/Mattison) Global Design Effort 1 DR Kicker R&D: Goals and Work Scope Michael S. Zisman and Tom Mattison.
Americas Region Inductive Adder Modulators for ILC DR Kickers Craig Burkhart SLAC For SLAC-LLNL Team Ed Cook, C. Brooksby LLNL R. Cassel, T. Beukers, C.
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
NLC - The Next Linear Collider Project Keith Jobe May 1999 Damping Ring Kicker Development.
ALPHA Storage Ring Indiana University Xiaoying Pang.
CLIC Kickers: Status and activities for 2013 in view of the budget discussions for 2013 CTC #65 M.J. Barnes CLIC Technical Committee, November M.J.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
FID Based Pulse Generators for Accelerator Applications Vladimir M. Efanov FID GmbH, 25 Werkstrasse, Burbach, D-57299, Germany 2006.
CLIC DR EXTRACTION KICKER DESIGN, MANUFACTURING AND EXPERIMENTAL PROGRAM C. Belver-Aguilar (IFIC) On behalf of: A. Faus-Golfe (IFIC), F. Toral (CIEMAT),
Stripline Kicker Project LBL LLNL SLAC KEK DESY. Damping Ring Injection / Extraction Kicker Magnet 1)The TDR Kicker: 1)0.6 mrad (.01Tm), 5GeV, 50 m β,
CIEMAT ACTIVITIES ON STRIPLINE KICKERS I. Rodríguez.
, WP1 Meeting, RAL J. Pasternak Status and Recent Progress in the Muon FFAG Designs for the NF J. Pasternak, Imperial College, London / RAL STFC.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
A fast RF kicker for the MEIC electron cooler Andrew Kimber Amy Sy 31 st March 2015 Thomas Jefferson National Accelerator Facility is managed by Jefferson.
KICKER LNF David Alesini LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Plans for injection/extraction R&D S. Guiducci INFN-LNF KEK - ILCDR07, Dec 207.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
Report on the Damping Ring Meeting at CERN, Nov , 2005 J. Gao IHEP, Beijing, China Nov. 24, 2005, ILC-Asia Meeting.
XFEL Pulser Specification of Pulser Dump pulser with a Belhke switch
Status of Fast Pulser and Kicker Work at UIUC and Cornell Robert Meller Cornell University Laboratory for Elementary-Particle Physics.
Ultra-Fast Damping Ring Kicker Modulator Development at SLAC Status update for ILC2010 C. Burkhart, A. Krasnykh, R. Larsen, & T. Tang March 27, 2010.
ILC Damping Ring Kickers Presenter: Josef Frisch Dec 7, 2004.
FAST KICKER STATUS Fabio Marcellini On behalf of LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
, EUROnu Meeting, Strasbourg J. Pasternak Status and recent progress on muon IDS-FFAG J. Pasternak, Imperial College, London / RAL STFC Work.
ILC Hybrid MOSFET/Driver Module Update T. Tang, C. Burkhart September 29, 2011.
Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5.
ILC Program discussion M. Ross Damping Ring Injection / Extraction Kicker Magnet 1)The TDR Kicker: 1)0.6 mrad (.01Tm), 5GeV, 50 m β, 7e-4 stability,
Damping Ring S. Guiducci AAP Review Tsukuba 20 April 2009.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
Status of ATF Fast Kicker Experiment
Bunch Separation with RF Deflectors D. Rubin,R.Helms Cornell University.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
2016/3/31 Fast kicker Experiment at ATF ATF2 - 40nm beam production, measurement Extraction kicker The difficulty of the beam extraction is that the kick.
Japan-US Collaboration /3/7 Japan-US Collaboration /3/7 Fast kicker development The beam extraction design from DR to the extraction line and.
1)For existing systems, where the ferrite yoke needs to be shielded from the circulating beam, it is not generally possible to include ceramic tubes to.
UPDATE ON KICKERS LNF David Alesini for the LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
ILC Damping Rings: Configuration Status and R&D Plans Andy Wolski Lawrence Berkeley National Laboratory January 19, 2006.
Damping Ring Injection and Extraction Damping Ring EDR Kickoff Meeting Daresbury UK 5-7 November 2007 Thomas Mattison University of British Columbia.
Tao Tang, Craig Burkhart
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
1 AS TAG Leaders Meeting Webex - Friday S. Guiducci, M. Palmer.
Member of the Helmholtz Association Page 1 Gerald Staats | ELBE| SRF-Gun Dark Current Chopper or taking the remains from other projects Gerald.
DA  NE KICKERS David Alesini (LNF, INFN Frascati) 4th Low Emittance Rings Workshop INFN-LNF September 2014.
Baseline Injection/Extraction Configuration Aimin Xiao and Louis Emery, September 12th 2006.
DR Kicker R&D: Goals and Work Scope
Status of the CERN chopper.
CLIC Damping ring beam transfer systems
Main Septa Solid State Pulsers & Kicker Thyratron Pulsers
CTF3 kicker activities at CIEMAT
Fast Kicker R&D in the Americas Region
Junji Urakawa (KEK) for ATF International Collaboration
Conclusions of LCWS08 & ILC08, Chicago, November ‘08
Bunch Separation with RF Deflectors
Strip-line Kicker R&D at KEK-ATF
ATF Fast Kicker R&D at LBNL ILCDR06, Cornell University
Fast Kicker R&D at ATF T.Naito(KEK) TILC09 18/April/ /11/27.
CLIC DR EXTRACTION KICKER DESIGN, MANUFACTURE AND EXPERIMENTAL PROGRAM
Advanced Research Electron Accelerator Laboratory
N. Terunuma (KEK) ILC2010, Beijing, March 29th, /2/28.
Status of CTC activities for the Damping rings
Session Introduction & Damping Rings Baseline Lattice Decision
Kicker and RF systems for Damping Rings
Kicker specifications for Damping Rings
Presentation transcript:

Injection/extraction R&D Summary S. Guiducci (INFN), Thomas Mattison (UBC) KEK - ILCDR07, Dec 207

Kickers Overview ILCDR R&D MiniWorkshop KEK, Japan December 2007 Thomas Mattison University of British Columbia

3

4

5

6

7 Clarifications from Naito-san on RDR pulse shape Prepulse (new pulsers are better) Load-reflection (new loads are better)

8 Clarifications from Naito-san on Compensation Data Compensator makes actual kick start negative, but FFT data analysis shows it as positive. It should really be plotted here!

Kicker R&D at KEK T.Naito(KEK) ILC damping ring workshop 18/Dec/2007

Strip-line electrode and pulser for ATF beam extraction 9.3kV peak 2 ns/div 9. 6 kV peak 2 ns/div Two new FID GmbH pulsers, + and –, max 6MHz burst, 60 pulses. [Nice risetime, negotiating with FID about falltime]

Steering magnets for the local bump The steering magnets were already installed to DR. The local bump orbit will be tested soon.

Auxiliary septum magnet design and fabrication The design work of the auxiliary septum magnet was carried out by using OPER 2D and 3D. 1.6 mm septum thickness, 1 kG field, 1x2.5 cm gap

Schedule 10kV fast pulser March 2008 Fabrication strip-line electrodesMarch 2008 Local bump orbit test Jan 2008 Fabrication Septum magnet March 2008 Install strip-line electrodes and septumSpring 2008 Beam extraction test Spring 2008

SLAC-LLNL ILC Damping Ring Kicker High Availability Modulator R&D Program December 19, 2007 Craig Burkhart for the SLAC-LLNL Team: E. Cook (LLNL) A. Krasnykh, R. Larsen, T. Tang (SLAC)

15 FY08 Inductive Adder Program 2 nd generation hybrid driver/FET circuit Module development; parallel arrays (addressing concern about single-FET switch speed) –Cascode –Hybrid Adder structures (addressing concern about transit time through adder) –Investigate “compact” structures, e.g. transmission line transformer “Scale” modulators –Identify bandwidth limitations of module and adder cell approaches

16 Ultra-fast Switch R&D: Cascode (2 output FETs) Reduced loading on driver circuit Lower impedance output stage drive Higher driver voltage Short pulse duration: 2.5 ns FWHM Fast rise/fall time: <2 ns Challenge: first few pulses are different height Data courtesy of E. Cook

17 Ultra-fast Switch R&D: Hybrid Die-form driver & FET Eliminate package inductance –Better control of gate charge –Reduce source LdI/dt voltage Fast output risetime: 1.2 ns (Ch1) Excellent gate control (Ch2) –High output voltage Low R DS-on V D = 400 V –Driver not optimized for short pulse Data courtesy of T. Tang

18 FY08 DSRD Program Develop prototype DSRD kicker modulator –±5 kV into 50 Ω –Flattop ~2 ns, rise/fall ~1 ns (fundamental limit for 500 V p-n Si junction) –PRF thermally limited (DSRDs from Ioffe, no thermal management structure, DTI has USDOE SBIR funding (separate from HEP!) to work with VMI to commercialize DSRD with heat sinks) –Deliver to KEK for testing on ATF2

19 KICKER LNF David Alesini LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.

20 A commercial feedthrough (not 50 Ohm) has been initially tested without success. Several FID GmbH HV pulser have been tested up to the final version under specification: 45 kV, flat top 5 ns An HV feedthrough at 50 Ohm has been designed, realized and tested at LNF with complete success up to 50 kV with the FID pulser. R&D on HV feedthrough (2/2)

21 RF test (Network Anal.) on the new injection kickers Connectors for RF test with NA

22 New pulser (FID) HV tests on the new kickers (3/3) Old pulser (LNF)

23 New pulser (FID) Old pulser (LNF) HV tests on the new kickers (2/3) 25 kV 250 ns 45 kV 5 ns

24 Installation in the DA  NE rings (Nov. 07) e+ IP the kickers have been connected to the old pulser systems

25 Future programs - Substitution of the old long pulser with the FID pulsers (positron ring) -HV load R&D -Timing control - Beam coupling impedance measurements on fast kickers (wire method) - Installation in DAFNE of “dump” kickers (2 more kickers already built). -This will allow to make tests on the beam with pulsers of different types.

26 42 striplines Length 30 cm Voltage ±5 KV Gap 30 mm 23 striplines Length 30 cm Voltage ±10 KV Gap 70 mm 4 sections 180º phase advance About the injection optics

27 Injection line - New version Taking into account: septum thickness 4 mm kickers good field region Good safety margin for failures: with a ± 10 KV pulser we could use 29/36 striplines Injection lattice design has enough flexibility!

28 Proposal for Discussion

29 Insertion Lattice Discussion Agreement that we must allow for rise-fall and packing fraction inefficiencies Did not reach agreement on FODO vs TME Did not agree on 1 vs several kicker clusters Did agree there’s time to change our minds… Some think there’s enough contingency space in proposed layout Mattison (and engineers) strongly advocate staking out space now for kicker contingencies, e.g., a few extra cells worth of length where kickers could be installed, no matter what lattice is shown to occupy them today.

30 Work Package 14 Injection and Extraction systems First meeting of WP14 after the specification of deliverables and resources In the following I’ll try to organize regularly short (phone)meetings to exchange information I’ll give a short description of the WP activities and leave time to the discussion

31 Work Package 14 Injection and Extraction systems Deliverable title Design damping rings injection/extraction system satisfying specifications for 6 ns and 3 ns bunch spacing Date to be achieved 06/2010 Collaborating institutes LNF (Coord.), KEK, SLAC, LLNL

32 Brief description of deliverable Develop injection/extraction kickers and fast pulser satisfying damping ring specifications The total kickers pulse duration should be less than twice the bunch spacing (6 ns and 3 ns) with a burst frequency of 3MHz and 6Mhz respectively Perform beam test of fast pulser and stripline system to demonstrate specifications on pulse time structure, time and amplitude jitter, long-term reliability and stability. Design damping rings injection/extraction system satisfying specifications for 6 ns and 3 ns bunch spacing.

33 Major tasks and milestones Install single-bunch extraction system in ATF Demonstrate single-bunch extraction from ATF Develop fast high-power pulser meeting damping ring specifications Develop technical design for kicker striplines Perform beam tests of available fast pulsers with kicker striplines at ATF and DAFNE Design damping ring injection/extraction system

34 Input for other Work Packages WP1 - Lattice design and acceptance : integrated strength, good field region and number of kickers WP4 - Instrumentation, diagnostics, controls: timing and control specifications for fast pulsers WP5 - Impedance and impedance driven instabilities: beam impedance of stripline kickers WP13 - Vacuum system: design of kickers vacuum chamber

35 Work Packages providing input WP1- Lattice design and acceptance: Lattice of injection/extraction sections WP13 - Vacuum system: Vacuum specifications of kickers vacuum chamber

36 Resources Proposed by LNF, KEK, SLAC, LLNL beginning of November Other labs expressed an interest: Cornell, LBNL, UIUC Physicists and Engineers Support Staff and Technicians Materials and travel (k$)

37 SLAC - LLNL Plans DSRD program –develop a ±5 kV modulator that will be delivered to KEK under the US-Japan joint research program. –goal parameters: ~1 ns rise and fall times, ~2 ns flattop, into 50 ohms –use a pair of DSRDs from Ioffe (St. Petersburg) that will not have any internal heat sinks. Therefore, the effects of thermal loading may limit the maximum prf and/or pulse train length. –The output stage will be pumped by a MOSFET array developed at LLNL. – Diversified technologies, Inc. will work with Voltage Multipliers, Inc, to commercialize the Ioffe DSRD technology. This will also include the improvements in packaging and thermal handling of DSRD junctions required to achieve higher voltages at high prf.

38 SLAC Plans Inductive adder program –attempt to refine the high switching speed circuits, Cascode and hybrid driver/FET, demonstrated in FY07 and combine them into parallel arrays capable of 400 A (required current for an inductive adder of ±10 kV into 50 ohm). –We have concluded that it is unlikely that conventional inductive adder structures can achieve the <1 ns rise/fall time required for 3 ns bunch spacing. Therefore, we plan to investigate alternative adder designs; such as the transmission-line transformer. A scale system (~2 to 5 kV) will be tested as soon as the driver arrays are available.

39 KEK plans Demonstrate single bunch extraction at ATF with trains of 20 bunches, 3 ns bunch distance and 3MHz repetition frequency –two 10kV, 3 MHZ pulsers from FID Co. are under test and other two have been ordered –Strip line design is done –Since there is no space for installing enough strip-line kickers an orbit bump and an auxiliary septum magnet will be added –Beam extraction test spring 2008 Continue beam tests of available pulsers

40 LNF Plans Test timing stabilization system with Fid pulsers –Time difference between the to kickers of the injection bump must be stable within tens of ps Commission DAFNE kickers for stable operation during luminosity runs –Test pulsers robusteness –Test the kicker system at high currents 1-2 A Install an abort kicker that can be used to test other pulsers Continue design and optimization of ILC DR striplines

41 Pulse shape Development of fast pulser is certainly the most challanging issue We will pursue all the solutions that allow relaxing the pulser specifications, an example: –Apply Naito’s solution to reduce the rise time with an extra kicker of opposite sign (test long term stability of the compensation) –Take advantage of the fact that bunch trains are extracted starting from the tail of the train and relax the requirement on the fall time of the kickers* –With the above conditions consider using a longer stripline (45 cm for maximum efficiency) to reduce the voltage * G. Penn, "Timing Issues for ILC Damping Rings" (May 2007)

42 Final Deliverable: Design injection/extraction systems Specifications (Existence proof?) of the pulsers based on beam tests Optimized design of striplines electrodes –for ILC dimensions, not just DA  NE & ATF Information for updated lattice design (WP1) Kickers vacuum chamber design (WP13) Impedance evaluation (WP5) Timing signal control and stabilization (WP4) Layout and requirements for conventional facilities (WP16)