Saturday 9 th April 10:24 Finally « 600 » bunches 14:30 Dump the 600 x 600 16:00 Loss maps Green light for 800 bunches 18:40 Fill for 800 bunches 20:48.

Slides:



Advertisements
Similar presentations
Review of 2011 studies and priorities for 2012 LIU-SPS-BD.
Advertisements

PROFIBUS controller problem (SEU) on cryo valve on DFBMH (600 A circuit RQ6.L7B1/2). Loss of cryo maintain ==> Beam dump. End of fill #1975 after ~2.5.
Preliminary results and ideas for the SPS upgrade MDs on LHC beams in 2011 G. Rumolo on behalf of all the MD team (Elena, Thomas, Karel, Christina, Holger,
LHC Wed 16 Sept 2015 Struggling with cryo o-night Tuesday - Wednesday 07:11 Injecting again 09:00 Dump on injection of train of 144 bunches, losses IP7.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Final results of the E-Cloud Instability MDs at the SPS (26 and 55 GeV/c) G.
LHC Scrubbing Runs Overview H. Bartosik, G. Iadarola, K. Li, L. Mether, A. Romano, G. Rumolo, M. Schenk, G. Arduini ABP information meeting 03/09/2015.
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
07-JUL-2003LEADE / JW1 Satellite bunches in the LHC Satellite “definition” Satellite luminosity Satellite detection & tolerances J. Wenninger AB/OP.
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
Production of bunch doublets for scrubbing of the LHC J. Esteban Muller (simulations), E. Shaposhnikova 3 December 2013 LBOC Thanks to H. Bartosik, T.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
Saturday 7ish – refill for RP set-up 9:15 Going for Roman pot alignment. Stefano is coming. 12:10 TOTEM: Alignment of horizontal RPs B2 finished, short.
00:15: Stable beams fill 1883, 1.1E33 cm-2s-1.  Seems the 144 bunches beam 1 doe not fit properly on the injection kicker waveform. Systematically the.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
Some ideas for/from the SPS LIU-SPS team. Scrubbing (only) for ecloud in SPS? aC coating remains baseline..... –but scrubbing has many potential advantages.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Future Needs and Future Directions Maximizing the LHC Performances J.M. Jimenez …when Nature persists.
Shortened program (2 days), as decided in LMC. MD program worked very well  all MD’s on plan with ~foreseen beam time. LHC in very good shape with excellent.
LIU-SPS e-cloud contribution to TDR Electron cloud meeting, 17/02/20141 o First draft by end of February Between 5 to 10 max pages per chapter, refer.
End-of-year talk LIU-SPS BD WG meeting Our meetings in 2015 O During year - 9 meetings of LIU-SPS BD WG (as in 2013, but 10 in 2014 and 12 in.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
LHC Scrubbing Run 1 Day 3 (27/06/2015) Scrubbing team 28/06/2015.
Lumi scan limits checked (in preparation for next fill VdM scans).  Trims of up to 150 um per beam in IP1 & IP2 both planes both beams were done (IP5.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
Production running 1 pb-1Lost to Mon h2062e32EOF studies Tue h17.152e32UFO Q8.L5 Tue h e32OP request Thu h e32OP.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
RF measurements during floating MD in Week 40 3 rd of October 2012 LIU-SPS BD WG 25/10/2012 Participants: T. Argyropoulos, H. Bartosik, T. Bohl, J. Esteban.
Vacuum Cleaning / Scrubbing measurements in the LHC J.M. Jimenez on behalf of G. Arduini, V. Baglin, G. Bregliozzi, P. Chiggiato, G. Lanza, OP.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Preliminary results of the E-Cloud Instability MDs at the SPS G. Rumolo, in.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
LHC status Friday 11 th September 2015 Coordination: Mike Lamont, Jorg Wenninger.
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Machine Coordinators: G. Arduini, J. Wenninger
Saturday 21st April 00:33 Interlock during ramp on BLM HV
MD Report 24 June 2012 Machine coordinators: Barbara Holzer, Mike Lamont MD Coordinators: Ralph Assmann, Giulia Papotti, Frank Zimmermann MD#2 News & Plan.
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
MD25 ns - 14/12/2012 G. Arduini, H. Bartosik, G. Iadarola, G. Rumolo
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Scrubbing progress - 10/12/2012
Sunday morning Recovering from 400 kV disturbance.
Friday 14th December - morning
Finally.... We had to wait a long time.... We had many problems....
Wednesday 03/11 – The Plan Finish electron-cloud program:
Monday 24 October hours of 25ns MD
Summary first Scrubbing test 31/10/2010
Saturday Nov Stop proton operation. Switch back to ions
Scrubbing progress - 08/12/2012
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Fill 1743 Peak luminosity ~6.7 e32 Integratated lumi ~20 pb-1
Collective effects in the SPS and LHC (longitudinal plane)
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Fri :52 Stable beams fill #2536
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Wednesday h18: 228b fill lost just before start of ramp.
Thursday - setup 10:00 Starting pre-cycle. 11:30 Injection.
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Wednesday 26 October 2011.
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Sunday 12th 00:29 Stable beam fill #1864. Initial lumi 1.1e33
Tuesday
Presentation transcript:

Saturday 9 th April 10:24 Finally « 600 » bunches 14:30 Dump the 600 x :00 Loss maps Green light for 800 bunches 18:40 Fill for 800 bunches 20:48 RQ5.R5 quench loop – SEU?– beams dump and recycle 23:30 Refill for 804 bunches:  Dumped with 732/660 due to an RF arc (so said the alarm)  Achieved 804/804! but B2 was very unstable. Eventually dumped by the SIS  Stopped at 804/732. Stayed like that for ~45 minutes but the dumped by BPM in IP6 LHC 8:30 meeting 10/4/2011

Filling for 600 bunches was tough LHC 8:30 meeting 10/4/2011 Satelites after the 36 bunches Fill with larger spacing, also behind 36 bunches

Scrubbing Clear sign of heat load in the arcs and scrubbing Temperatures on beam screen measurement points indicate e-cloud and the vacuum pressure is only going down slowly. LHC 8:30 meeting 10/4/2011 Up to 70 mW/m/aperture due to e-cloud – W. Venturini

Solenoid with 1 A LHC 8:30 meeting 10/4/2011 P. Chiggiato

BSRT – Beams are blowing-up LHC 8:30 meeting 10/4/2011 The vertical emittance grows along the train (especially for batches 4 and 5), while in the case of the horizontal the behavior depends on the batch For horizontal emittance we see a big emittance growth in the middle of the batch for 3rd and 4th batches, while from the 5th one we see the big emitance growth mainly at the beginning of the trains. Taking in consideration that the first bunches if each batch are more intense, the previous effect can be due to impedance issues, to be desentagled from e- cloud effects.

Energy loss form stable phase LHC 8:30 meeting 10/4/2011 Proposed by E. Shaposhnikova  indications of scrubbing

Pressure during scrubbing LHC 8:30 meeting 10/4/2011 V. Baglin

Bunches are too intense (filling for 800) LHC 8:30 meeting 10/4/2011 SPS called Thomas for help with the longitudinal blow up and possibly the 800 MHz...

Loss maps – B1H is the problem again First loss maps shows again large hierarchy breaking in B1H. A second loss map after recalibration for all the BPMs is good. Problems with BPM calibration…. B1H +0.06: LHC 8:30 meeting 10/4/2011

Re-fill for 800 bunches – several attempts LHC 8:30 meeting 10/4/2011 Correlation Beam Loss and Vacuum

Vacuum during the 800 bunches LHC 8:30 meeting 10/4/2011

Plan Scrub with 800 bunches Check injection If all goes well (incl. rMPP) – more bunches Issues  BPM calibration  Set-up collimation in IP7 again?  Beam unstable if heavy e-cloud – ADT gain up and up  XPOC: Ring FBCT and MKB seeing the bunches LHC 8:30 meeting 10/4/2011