Slide 1 of 13 CONFIDENTIAL April 20, 2004 Caterpillar ECF-2 Program Field Follow data Test Criteria Test Matrix Results.

Slides:



Advertisements
Similar presentations
TM/WSP 5-9 Nov Group D1- Nuclear fuel cycle, nuclear waste QUESTIONS / DIFFICULTIES  Why is the NPP decommissioning required / necessarily?  How.
Advertisements

Cylinder liner The cylinder liner forms the cylindrical space in which the piston reciprocates. The reasons for manufacturing the liner separately from.
M11EGR TRWL vs Liner Material Statistical Analysis 19May2003 jar.
Identifying Key Processes For Successful Temperature Sensitive Shipments Frank Morgiewicz, VP & GM of Logistics Services ArrowStream.
Stability data required by WHO-PQP Mercy Acquaye.
T h e E u r o p e a n T y r e a n d R i m T e c h n i c a l O r g a n i s a t i o n UNECE Regulation No 117 Testing method for measuring the wet grip index.
Rob Midgley Oils and Oil Analysis deHavilland Moth Club.
Aero Engines 9.02 Oil & Fuel References: FTGU pages
RETScreen® Energy Efficiency Projects
8 Criteria for IRB Approval of Research 45 CFR (a)
St. Johns River Water Supply Impact Study by Getachew Belaineh Ph. D., P.H. 1 Brian McGurk P.G. 1 Louis Motz Ph. D., P.E 2 Follow up Review meeting March,
Practical Energy Conservation Tips for Diesel Propulsion Ships.
An Overview of Emerging Power Industry Standards for Geomagnetic Storms Adequacy Concerns.
Item 3: Electrified Vehicle Battery Performance & Durability EVE-14-08e Presented by: USA, Canada EVE-14 meeting April 20,
Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.
ALPHA Project Safety Assessment Document Vladimir Anferov.
CSOEM Materials Advisory Group Summer Meeting: Status Update - UNS S66286 Elevated Temperature Tensile Testing Tim Haeberle Chief Consulting Engineer –
Confidential and proprietary to U.S. Bank 1 Corporate Payment Systems Adwebportal Training.
08/02/011 Statistical Summary of the Mack T10 Precision/BOI Matrix.
Analysis of the ISM Matrix Draft 3 November 5, 2004.
HD 2007 Rule Diesel Fuel Sulfur Testing and Sampling Methods and Requirements US EPA Office of Transportation and Air Quality November 20, 2002.
Calorimeter Analysis Tasks, July 2014 Revision B January 22, 2015.
Project Nexus Workgroup AQ Backstop Date Options 7 th October 2014.
Paul Novak, Ohio EPA. Committee Meetings/Agenda  March call of full committee  April meeting with IDEM, OEPA, ORSANCO on streamlined variance.
California Statewide Utility Codes and Standards Program Title 24 Res ACM - DHW Heschong Mahone Group, Inc. Energy Solutions Nov 20, 2012.
© Chevron 2008 ASTM PCEOCP VID Matrix Design and Funding Subgroup September 4, 2008 Detroit, MI.
Formulae For each severity adjustment entity, X i = i th test result in original units in end-of-test order T i = i th test result in appropriate units.
Mack T12 Engine Test Update
Bernie Kinker June 14, 2007 RohMax Oil Additives ROBO For ESCIT.
HD Engine Tests John Redshaw 11/10/10.
How to Start An Industry Sponsored Clinical Trial
JACTest Monitoring Center Test Monitoring Center Report to the Mack Test Surveillance Panel June 17, 2002 Montreal.
© The Lubrizol Corporation 2006, all rights reserved Case Study: Sequence IIIG Phos Retention at 20 Hours Presented to ESCIT February 2007 San Antonio,
ISM Test Development Task Force Report June 21, 2004.
Particulate Matter Monitoring Exercise: Laboratory & Field Methods Lydia Scheer ITEP.
API 17TR8: High-pressure High-temperature (HPHT) Design Guidelines
Peru BY GABE LANE / ANGEL ALEMAN 4 TH HOUR. peru.
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-081 Leader: Per Ohlund / Kazuki Kobayashi.
Cat Aeration Task Force Additional Prove Out Testing Proposal 1 PC-11 Statisticians Task Force July 1, 2014.
© Chevron 2008 ASTM PCEOCP VID Matrix Design and Funding Subgroup April 25, 2008 Teleconference.
© The Lubrizol Corporation 2006, all rights reserved Case Study: Sequence IIIG Phos Retention at 20, 40, 100 Hours Presented to ESCIT August 9, 2007 Midland,
Engine Compression. We have already seen how internal combustion engines develop compression Basically the piston is slightly smaller in diameter than.
Piston Design & Analysis
Draft 08/06/01 jar1 Draft Addendum to the Statistical Summary of the Mack T10 Precision/BOI Matrix Including IR Oxidation.
Generic Industry’s Perspective on the New GMP Initiative 2002 Generic Pharmaceutical Association Kenneth Lavin, M.Sc. Director, Regulatory Compliance TEVA.
Proposed C13 MERIT SYSTEM Steve Jetter/Abdul Cassim
FIXED ETHERNET SWITCH COMPARISON TOOL (v6- presentation mode will activate tool) The information in this document is confidential to Juniper Networks.
[Team Name] (e.g. ESH) Team Lead.
How To Apply Quality Management
Formulae For each severity adjustment entity,
Automotive Engines Theory and Servicing
Steady state thermal analysis in ASONIKA
D. Romberger Ag Power & Technology
Statistical Summary of the Mack T10 Precision/BOI Matrix
Using the Seq. IIIG to Reliably Provide Catalyst Protection
A presentation on Measurement of Winding Resistance and Insulation Resistance of 3 Phase 11 kV/ 433 V, 16KVA Oil cooled type Transformer PRESENTED BY:
Caterpillar C13 Matrix Data Analysis
Caterpillar C13 Test Matrix Update
Test Monitoring Center Report to the Mack Test Surveillance Panel
2017 Exploration & Production Winter Standards Meeting
Performance Assessment of 100% Recycled Hot Mix Asphalt
High Oil Consumption Engine, # 31
Test Plans EGR Mar 2015.
Human Factors Issues in Oil Refinery Operation
CPD Summary Guide 2018 Version:3.1.
' · · ,.-.., '' !'",. -,..._ ·-.·-...;.· -
DSC Change Committee Update
DSC Change Committee Update
Automotive Engines Theory and Servicing
Presentation transcript:

Slide 1 of 13 CONFIDENTIAL April 20, 2004 Caterpillar ECF-2 Program Field Follow data Test Criteria Test Matrix Results

Slide 2 of 13 CONFIDENTIAL April 20, 2004 Caterpillar C13 Field Follow Summary Test Population Percentage High OC Pre-Prod % Pre-Prod % Production Iron used for Oil Test C13 Production began Nov 03

Slide 3 of 13 CONFIDENTIAL April 20, 2004 Caterpillar ECF-2 Test Criteria Test Pass/Fail Criteria: 1. No Loss of Oil Consumption Control 2.No stuck rings/Loss of ring side clearance 3.No Liner Scuffing or Bore Polish 4.No Loss of Blowby Control 5.Measured Piston Deposits 6.EOT Oil Quality to be monitored 500 hour – Steady State Test Cycle

Slide 4 of 13 CONFIDENTIAL April 20, 2004 Caterpillar ECF-2 Test Matrix

Slide 5 of 13 CONFIDENTIAL April 20, 2004 Caterpillar ECF-2 Test Matrix Ref 0Ref 1Ref 2 Intermediate Temps 41 % Inc OC, Sluggish Rings 36% Inc OC, Stuck Ring Hot Temps16 % Inc OC, Rings Free 49% Inc OC, Rings Free Low Temps105 % Inc OC, Stuck Rings* 62 % Inc OC Stuck Rings 61 % Inc OC Stuck Ring 78 % Inc OC Rings Free 31% Inc OC, Stuck Rings* * Test started at hot temp for first hrs, then switched to Low Temp

Slide 6 of 13 CONFIDENTIAL April 20, 2004 Caterpillar ECF-2 Test Results Summary Discrimination? Temperature sensitivity to deposits validated Field concerns validated through Field Follow Test conditions defined Low Reference Oil (Ref 1) selected High reference being sought –Onus on Oil/Additive Industry to supply

Slide 7 of 13 CONFIDENTIAL April 20, 2004 Caterpillar ECF-2 Test Results Summary

Slide 8 of 13 CONFIDENTIAL April 20, 2004 Caterpillar ECF-2 Test Results Summary

Slide 9 of 13 CONFIDENTIAL April 20, 2004 Caterpillar ECF-2 Test Results Summary

Slide 10 of 13 CONFIDENTIAL April 20, 2004 Caterpillar ECF-2 Test Results Summary

Slide 11 of 13 CONFIDENTIAL April 20, 2004 Caterpillar ECF-2 Test Summary 1.Completing 2 more tests (Potential Ref Comm. Oils) 2.Expected completion May Propose go forward with C13 test for ECF-2 4.Taskforce Approval needed 5.ASTM Approval? 6.Research Report and Test Procedure to be documented

Slide 12 of 13 CONFIDENTIAL April 20, 2004 Caterpillar ECF-2 Test Matrix Plan All Tests to be conducted at the same low temp conditions

Slide 13 of 13 CONFIDENTIAL April 20, 2004 Caterpillar ECF-2 Test Matrix Low TempsTLCTLHCTGFTGC2GF Rings Lab 1 Ref 1 Lab 2 Ref 1 Lab 3 Ref 1 Lab 1 Ref X Lab 2 Ref Y Test completed 500 hrs Test completed 300 hrs Test completed 240 hrs