PHASE II FLIGHT-SAFETY REVIEW AMS-02 EXPERIMENT sub-detector SILICON TRACKER Roberto Battiston - AMS-02 Phase II Safety Review - Houston JSC May 21-25,

Slides:



Advertisements
Similar presentations
Automotive A/C systems
Advertisements

H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
CO2 cooling for FPCCD Vertex Detector Yasuhiro Sugimoto KEK 1.
1 AMS-02 TRD Status Report Stefan Schael RWTH Aachen TIM Meeting, CERN, June 2001 TRD meeting: Wednesday 16:15 in room !!!
Phil MottAMS-02 GSR Phase II1 AMS-02 Vacuum Case Overview Ground Safety Review – Phase II September 8-10, 2008 Phil Mott.
HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
1 Nikhef Activities on CO 2 Cooling Bart Verlaat, Nikhef Introduction meeting with FOM director W. van Saarloos 1 Picture: LHCb-VELO evaporator.
Cable Channel tests ____________________________________________________________ 17/Apr/07 Pisa Group Four configurations of insulation has been tested.
Review of Helium Venting Analyses
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
1 Feasibility Demonstration of a Mechanically Pumped Two-Phase CO 2 Cooling Loop for the AMS-2 Tracker Experiment Conference on Thermophysics in Microgravity.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
March 13thXXXXth RENCONTRES DE MORIOND 1 The Alpha Magnetic Spectrometer on the International Space Station Carmen Palomares CIEMAT (Madrid) On behalf.
Davide Vitè - MInstPhys CPhys Particle Physics 2000, Edimburgh, 12 April AMS the Anti-Matter Spectrometer n The past:10 days on Discovery n The.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
AMS tracker hardware status (mechanics and cabling) Divic RAPIN, UniGe AMS splinter tracker, Septidi 7 Brumaire 217 (october 28, 2008) off-line operations.
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
AMS-02 tracker mechanics status of construction, assembly, integration Production: - Ladder integration - Installation on planes Inner tracker assembly:
Third International Conference on Frontier Science Villa Mondragone – Monteporzio Catone Physics and Astrophysics in Space June 14, 2004 Mercedes Paniccia.
D. VITE' - AMS Genève Cartigny, AMS the Anti-Matter Spectrometer n The past:  1999 n The present:2000 n The future: and beyond… n.
AMS-02 Delta CDR Thermal. Overview Changing from Cryomagnet to PM greatly simplifies AMS-02 Thermal requirements – Keeping vacuum Case “cold as possible”
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
GLAST LAT Silicon Tracker Marcus ZieglerIEEE The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus Ziegler.
Journée de réflexion du DPNC Cartigny – July 2, 2004 Mercedes Paniccia Université de Genève The Construction of AMS.
Craig S. ClarkAMS-02 Phase II Safety Review1 AMS-02 Thermal Control System (TCS)
Leland D. HillAMS-02 Phase II Flight Safety Review - May AMS-02 Safety Summary.
Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 1 EddiCam: The Eddington Photometric Camera Preliminary Design Layout.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
1 Mirror subsystem: telescope structure Functions: Functions: Support mirrors subsystem to S/C Support mirrors subsystem to S/C Accommodate cryostat Accommodate.
Ground Safety Review – Phase II September 8-10, 2008 Phil Mott
INTRODUCTION Definition:
1 CO 2 cooling of an endplate with Timepix readout Bart Verlaat, Nikhef LCTPC collaboration meeting DESY, 22 September
Tracker Thermal Control System 2015年9月13日星期日 2015年9月13日星期日 2015年9月13日星期日 1 AMS-TTCS Status Report AMS-TIM meeting, CERN, Oct.28 th, 2008 ZH He On behalf.
Other Flight Pressure Systems Phase III Flight Safety Review 12 Jan 2009.
1 AMS-02 Integration & Test Plans & Status Trent Martin 24 January, 2007.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
Tracker Thermal Control System 1 AMS Tracker Thermal Control System (TTCS) Phase II Safety Presentation SRII meeting, 21 May 2007, Houston Johannes van.
Tracker Thermal Control System 1 AMS Tracker Thermal Control System (TTCS) TTCS Design Description NLR-team: J. van Es, M.P.A.M. Brouwer, B. Verlaat (NIKHEF),
AMS TIM July, 2008 – CERN 1 AMS 02 –Thermal Control System Design AMS-02 Thermal Control System (TCS)
Overview of AMS-02 Changes due the addition of the Permanent Magnet
Alpha Magnetic Spectrometer Alpha Magnetic Spectrometer – 02 Phase III PSRP / SRP Electronics Summary January 12, 2010 Timothy J. Urban / ESCG / Barrios.
Tracker Thermal Control System TTCS Progress at Sun Yat-sen University Feb. 1, 2006, CERN Geneva Modeling: SS Lu, ZC Huang, DQ Mo, Y Chen EM test: TX Li,
VTCS overview 13 April 2006 NIKHEFBart Verlaat 1 NIKHEF involvement in VELO ~1 m module support CO 2 cooling detector "hood" kapton cables Vacuum vessel.
INTEGRATION OF THE CBM SILICON TRACKING SYSTEM U. Frankenfeld for the CBM collaboration supported by BMBF, EU-FP7 HadronPhysics3 and CRISP.
VG1 i T i March 9, 2006 W. O. Miller ATLAS Silicon Tracker Upgrade Upgrade Stave Study Topics Current Analysis Tasks –Stave Stiffness, ability to resist.
The Belle II Silicon Vertex Detector Florian Buchsteiner (HEPHY Vienna)
AMS-RICH Detector. J. Berdugo – CIEMAT (Madrid, Spain) 1 AMS-02 Phase II Flight Safety Review AMS Ring Imaging CHerenkov PURPOSE: 1.Precise measurement.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
AMS-02 tracker mechanics status of construction, assembly, integration Ladder assembly Ladder installation on planes Integration details, cooling loop,
ESCG\L. D. Hill AMS-02 Permanent Magnet Safety Impact 1 AMS-02-PM Design Review - May 4-5, 2010.
AMS-02 Delta CDR Structural Analysis and Certification Process Carl Lauritzen Structural Analysis Lead Jacobs Engineering
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
CO 2 Controlling a 2-phase CO2 loop using a 2-phase accumulator
Installation of the T600 at Fermilab CSN2, September 22,
Phil MottAMS-02 Phase II Safety Review1 Vacuum Case Mechanical Design Alpha Magnetic Spectrometer (AMS) - 02 Phase II Flight Safety Review Vacuum Case.
Power, Cooling, Cables, Simulations of Heat Dissipation Short overview of ongoing work on these points Technical Coordination (Rolf Lindner et al.) Cooling.
AMS Tracker Meeting17/10/05 Eric Perrin (GE) Tracker mechanics at Uni -Ge Safety issues Assembly Still to be made.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
Cooling Circuit Design Steve Virostek Lawrence Berkeley National Lab February 29, 2012 MICE Coupling Coil Cryostat Design Review Lawrence Berkeley National.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
M1M3 Fan Coil Unit Status Gary Muller & Brian Johnson LSST 2017 Project & Community Workshop 8/17/2017.
Understanding the system.
Installation of the T600 at Fermilab
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
VELO Thermal Control System
SIT AND FTD DESIGN FOR ILD
Pixel CO2 Cooling Status
SNS PPU Cryomodule Instrumentation
SNS PPU Cryomodule Instrumentation
Presentation transcript:

PHASE II FLIGHT-SAFETY REVIEW AMS-02 EXPERIMENT sub-detector SILICON TRACKER Roberto Battiston - AMS-02 Phase II Safety Review - Houston JSC May 21-25, 2007

2Roberto Battiston - AMS-02 Phase II Safety Review - Houston JSC May 21-25, 2007 AMS02 – Building Blocks Silicon Tracker is a tracking detector and it is the core of AMS-02. It is surrounded by the others sub-detectors or sub-systems.

3Roberto Battiston - AMS-02 Phase II Safety Review - Houston JSC May 21-25, 2007 The AMS 02 Detector Silicon Tracker Z, P, 

4Roberto Battiston - AMS-02 Phase II Safety Review - Houston JSC May 21-25, 2007 Characteristics of AMS-02 Δ t = 100 ps, Δx = 10 µm, Δv/v = y06K307 He,Li,Be,..Fe P e–e– He, C P, D e+e+ TRD TOF Tracker RICH ECAL ––– – Physics example Antimatter Cosmic Ray Physics Strangelets Dark matter 

5Roberto Battiston - AMS-02 Phase II Safety Review - Houston JSC May 21-25, 2007 Silicon Tracker It is composed by: -3 inner double face detector plane -2 single face detector plane

6Roberto Battiston - AMS-02 Phase II Safety Review - Houston JSC May 21-25, 2007 Silicon Tracker Each Ladders is a multi-wafer silicon detector, with the read-out electronics Assembly view

7Roberto Battiston - AMS-02 Phase II Safety Review - Houston JSC May 21-25, 2007 Silicon Tracker Each plane is composed by many: “Ladders”

8Roberto Battiston - AMS-02 Phase II Safety Review - Houston JSC May 21-25, 2007 Tracker - Ladder

9Roberto Battiston - AMS-02 Phase II Safety Review - Houston JSC May 21-25, 2007 Vibration tests of the cables and connexions cable alone cable bundle connexions/cables for a 3-layer column Mechanical behaviour and fixation scheme were studied thanks to the vibration table of University of Bern. Mr Beat Zahnd No problems found for cables, connectors and connexions Distance between cable fixations were determined (for vacuum case)

10Roberto Battiston - AMS-02 Phase II Safety Review - Houston JSC May 21-25, 2007 Plane 1

11Roberto Battiston - AMS-02 Phase II Safety Review - Houston JSC May 21-25, 2007 Silicon Tracker The final configuration of the Tracker, is done by adding: - external shells; - The upper and lower conical flange;

12Roberto Battiston - AMS-02 Phase II Safety Review - Houston JSC May 21-25, 2007 FM AMS-02 Silicon Tracker

13Roberto Battiston - AMS-02 Phase II Safety Review - Houston JSC May 21-25, 2007 Silicon Tracker Design Partially re-flown hardware (shell and honeycomb planes) AMS-01 – STS-91 mission ‘98; Main assessment for Tracker, have been: -Bolt Analysis (NSTS Tracker Bolt Assessment.pdf) -Declared Material List (AMS_Tracker_DMLv2.xls) -Fracture of Composite (Memo_Fracture_control_composite.doc) -Venting

14Roberto Battiston - AMS-02 Phase II Safety Review - Houston JSC May 21-25, 2007 Tracker - Venting To equalize the pressure inside the Tracker with the pressure in the payload bay during launch and landing, the Upper and Lower Conical Flanges each contain two light traps, filtered vents.

15Roberto Battiston - AMS-02 Phase II Safety Review - Houston JSC May 21-25, 2007 Tracker - Venting The four light tight, filtered vents permit air to exit or enter the enclosed Tracker volume of ft 3

16Roberto Battiston - AMS-02 Phase II Safety Review - Houston JSC May 21-25, 2007 TTCS – Tracker Thermal Control System The Objective of TTCS is to provide accurate temperature control of AMS02 Tracker front-end electronics. We use: Two redundant CO 2 two-phase pumped loops –Primary loop –Secondary Loop TTCE Tracker Thermal Control Electronics

17Roberto Battiston - AMS-02 Phase II Safety Review - Houston JSC May 21-25, 2007 TTCS System Overview

18Roberto Battiston - AMS-02 Phase II Safety Review - Houston JSC May 21-25, 2007 TTCS – Tracker Thermal Control System SYSTEM COMPONENTS - Top and bottom INNER (tracker) EVAPORATOR - Top and bottom OUTER (Tracker) EVAPORATOR - Electronic Boxes: TTCB primary and secondary - TTCE - 4 Condensers (RAM and WAKE side of AMS) - 2 Radiators (RAM and WAKE side of AMS)

19Roberto Battiston - AMS-02 Phase II Safety Review - Houston JSC May 21-25, 2007 TTCS box envelopes (locations) Tracker radiators TTCS Condensers are attached to the Tracker radiators Tracker

20Roberto Battiston - AMS-02 Phase II Safety Review - Houston JSC May 21-25, 2007 TTCS – Tracker Thermal Control System Inner Evaporator 192 Hybrids each producing 0.75 Watts of heat (144 W total)

21Roberto Battiston - AMS-02 Phase II Safety Review - Houston JSC May 21-25, 2007 TTCS – Tracker Thermal Control System Outer Evaporator tubing upper inner and outer ring

22Roberto Battiston - AMS-02 Phase II Safety Review - Houston JSC May 21-25, 2007 Tracker Thermal Control System FM evaporator

23Roberto Battiston - AMS-02 Phase II Safety Review - Houston JSC May 21-25, 2007 Cold orbit heater accumulator Heat exchanger Diff. P-sensor Abs. P-sensor Cover with ext. connectors Swagelok weld couplings TTCS Box

24Roberto Battiston - AMS-02 Phase II Safety Review - Houston JSC May 21-25, 2007 Pump is an adapted Mars Pathfinder rover pump by PDT Centrifugal pump Successful CDR in September 2006 Pump EM Pump Pump Controller