SOUTHERN REGIONAL GRID ▀ Centre Generating Stations in the Region are Ramagundam Super Thermal Power Stn. : 2,600 MW (200x3 + 500x4) Neyveli Lignite Corporation.

Slides:



Advertisements
Similar presentations
1 FREQUENCY LINKED DISPATCH AND ELECTRICITY PRICING (An unconventional approach for tackling the peculiar problems existing in India) - Bhanu Bhushan -
Advertisements

ENQUIRY BY SRLDC TO VERIFY THE DETAILS OF DC & AG BY NTPC AND NLC STATIONS PETITION NO:- 67/2003 (suo motto) & PETITION NO:- 90/2005 (TNEB) CERC HEARING.
FREQUENCY SPECTRUM FROM AUGUST 06 TO OCT 06 (UPTO 20 TH OCT 06) < 49.0 HZ< 49.5 HZ< 50.0 HZ HZ>50.2HZ>50.5 HZ Aug
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Maharashtra State Load Despatch Centre Role of SLDC in RRF Implementation & Issues By MSLDC.
AVAILABILITY BASED TARIFF SCHEDLING PROCEEDURE AND SETTLEMENT MECHANISM UNDER ABT REGIME T. SRINIVAS MANAGER,SRLDCBANGALORE.
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
RRF Mechanism ENERGY ACCOUNTING Western Regional Power Committee
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
Largest sized hydro unit (180 MW at Chamera) in the country Salient Features Northern Regional Power System Welcome Reforms Within The State, Trading And.
1 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
1. 2 ENERGY MANAGEMENT SYSTEM AN OVERVIEW AN OVERVIEW.
1 Regional Energy Accounting, Disputes Mechanism and Resolutions -R M Rangarajan & Asit Singh. -Executive Engineer, -SRPC, Bangalore.
SCHEDLING MECHANISM AND RELATED ISSUES T. SRINIVAS MANAGER,SRLDC BANGALORE.
Energy Accounting and Need for Special Energy Meters under ABT Regime.
1. WHAT IS METER ? A device which measures, indicates and records certain measurable quantity. 2. WHAT IS ENERGY METER ? A device which measures, indicates.
REVISION OF SCHEDULES/REQUISITIONS A)OUTAGE OF GENERATING UNIT B) REVISED DECLARATION OF AVAILABILITY BY CGS C) OUTAGE OF A TRANSMISSION ELEMENT D)UNFORESEEN.
Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)
1 Regional Energy Accounting, Disputes Mechanism and Resolutions -Rakesh Goyal & Asit Singh. -Executive Engineer, -SRPC, Bangalore.
‘S ORDER ON AVAILABILITY BASED TARIFF PRESENTATION BY C.V.ANAND Sr.Supdt (Comml)
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
CMD VISIT ON 16-JAN-03 DAILY FREQ COMPARISION JAN-02 & JAN DAYS FREQ COMPARISION JAN-02 & JAN DAYS FREQ JAN DAYS FREQ JAN-02 TYPICAL.
14 TH Commercial sub-committee meeting UI &REC Audit Talcher II scheduling SEM DATATransmission pricing AMR Others.
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
LOAD FORECASTING T SRINIVAS MANAGER SRLDC. MAIN COMPONENTS OF THE GRID  GENERATION  LOAD  TRANSMISSION NETWORK DETAILS.
14 TH Commercial sub-committee meeting UI &REC Audit Talcher II scheduling SEM DATATransmission pricing AMR Others.
GRID OPERATION AND CONTROL. MAIN COMPONENTS OF THE GRID  GENERATION  LOAD  TRANSMISSION NETWORK.
Open Access for Renewables New initiatives. Scheduling and OA of RE Open Access through LTA/ MTOA/ STOA route envisaged Applicable to Wind and Solar without.
Indian Power System Peculiarities & Solutions S K Soonee Executive Director NRLDC.
Anil Thomas Asst. Executive. Engineer Southern Regional Power Committee Central Electricity Authority.
Low Peak Frequency High Off-Peak Frequency Wide Frequency Fluctuation Damage to Generating Plants and Consumers’ Equipment Merit Order not followed - Optimizat.
SCHEDULING METHODOLOGY The station-wise (Ex-bus) capability would be submitted by the ISGSs in the specified format. ISGSs would declare the capability.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
Commercial Issues Yet to open LC for UI payment delays : TN default in UI& Reactive charges Tamilnadu to pay 100Crs. as UI charges and 2Crs. as Reactive.
Commercial Issues Yet to open LC for UI payment delays : TN default in UI & Reactive charges Tamilnadu still to pay 74Crs. as UI charges during
IMPACT OF ABT, NETWORK STRENGTHENING ON GRID OPERATION IN KARNATAKA SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED ADVANTAGE.
Congestion regulations. Definitions and Interpretation “Available Transfer Capability (ATC)” means the transfer capability of the inter- control area.
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
Settlement System under ABT Regime. WHAT IS SETTLEMENT ? “ Settlement means finalisation of payment bill after consumption” To be FAIR and EQUITABLE To.
Renewable Regulatory Fund (RRF):- Implementation Mechanism
G1 G2 SERC SLDC SEB/STU State Govt. RLDC REB CTU CERC Central Govt. CEA ISTS ISGS Load L1L2 Intra State System IEGC to Operate on the periphery X=- GLG.
INDIAN ELECTRICITY GRID CODE AND OPERATION ISSUES SRLDC/Comml/IEGC/1 P. Bhaskara Rao, DGM (Commercial & C &M), SRLDC,Bangalore.
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
AN OVERVIEW IN RESPECT OF CPP’S IN SOUTHERN REGION STATES.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 2 nd SRPC MEETING 30 TH OCTOBER 2006 HYDERABAD GRID EVENTS AND ISSUES.
Availability Based Tariff (ABT) in Northern Region.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM.
SYSTEM OPERATION AVG, MAX & MIN DRAWAL SHARE ALLOCATION INTER-REGIONAL IMPORTS 3D FREQ OCT-03 3D SR DEMAND FREQ COMPARISION OCT-02 & OCT-03 GENERATION.
FREQUENCY EVENTS NTPC (INJECTION - DC) ISSUES NLY – II STAGE 1 (INJECTION - DC) NLY – II STAGE 2 (INJECTION - DC) NLY TPS I (Exp) (INJECTION - DC) ULDC.
Largest sized hydro unit (180 MW at Chamera) in the country Salient Features Northern Regional Power System Welcome INDIAN ELECTRICITY GRID CODE (IEGC)
Issue of Declared Capacity (DC), and Actual Generation (AG) by Generating Stations Hon’ble Commission has issued Interim order dated 19/ directing.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
INJECTING UTILITYSTATEEXPORT (MU) TNEBTAMILNADU673 KPTCLKARNATAKA205 KSEBKERALA1792 APPCCANDHRA PRADESH426 JINDALKARNATAKA274 KPCLKARNATAKA593 JSWELKARNATAKA1058.
Southern Regional Power Committee Central Electricity Authority.
AVAILABILITY BASED TARIFF. - Tariff structures - Two part tariff - Concept of ABT - ABT structure - Expectations from OEMs/Utilities Session outline.
MERIT ORDER SCHEDULING AND DESPATCH V. K. AGRAWAL NRLDC.
SEMs Specification Static type Composite meter Highest accuracy available in the power industry 3 Phase – 4 wire connections/measurement Direct measurement.
Sharing of Inter-State Transmission Charges and Losses Abbhimanyu Gartia, Dy General Manager, WRLDC, MUMBAI.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 2 nd SRPC MEETING 30 TH OCTOBER 2006 HYDERABAD GRID EVENTS AND ISSUES.
Grid Operation --- Role of RLDC. Contents Load Generation Balance Electricity Accounting Real Time Trends ABT Feedback Inter Regional Exchanges Loading.
INDIAN ELECTRICITY GRID CODE AND OPERATION ISSUES SRLDC/Comml/IEGC/1 P. Bhaskar Rao, DGM (Commercial & C &M), SRLDC,Bangalore.
UNIFIED LOAD DESPATCH SCHEME IN THE SOUTHERN REGION
Congestion regulations
REGIONAL ENERGY ACCOUNT BASED ON AVAILABILITY BASED TYARIFF
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
“ MERIT ORDER SCHEDULING AND
Presentation transcript:

SOUTHERN REGIONAL GRID ▀ Centre Generating Stations in the Region are Ramagundam Super Thermal Power Stn. : 2,600 MW (200x x4) Neyveli Lignite Corporation Ltd. - II : 1,470 MW (210 x 7) Madras Atomic Power Station : 340 MW (170 x 2) Kaiga Atomic Power Station : 440 MW (220x2) NLC EXPANSION TPS 1 : 420 MW (210X2) TALCHER STAGE II : 1500 MW (500X3) present in ER ▀ Beneficiaries in southern Region are. ANDHRA PRADESH KARNATAKA KERALA TAMIL NADU Union Territory of Pondicherry NLCMINES GOA has share of 100MW from RSTPS

CONTROL AREAS REGIONAL GRID SEB’S GRID CS -3 CS - 2 CS - 1 CENTRAL SHARE STATE GENR STATE IPP DISTR -B DISTR - A DISTR - C SEB - A SEB -CSEB -B SLDC COORDINATES DIRECTS RLDC COORDINATES

C H A P T E R - 7 SCHEDULING & DESPATCHING CODE Demarcation of Responsibilities. Each Region is a loose power pool and each state is a notional Control Area. (Decentralized Scheduling and Dispatch). RLDC can direct SLDCs/ISGSs in case of system contingencies, to change drawal/injection and if time permits, RLDC will ascertain whether situation has arisen due to => Deviations from schedule => Bilateral Exchange These can be terminated by RLDC.. All joint/bilateral agreements to be filed with RLDC/REB Secretariat.SEMs to be installed by CTU at all interconnection points for recording Actual Interchanges and MVARh drawals.. Regional Energy Accounting to be done by REB Sectt.based on metered and processed data (Actual net injection of ISGS and actual net drawal of each beneficiary) received from RLDC. SRLDC/Comml/IEGC/33

Settlement Systems*. Accounting on weekly basis. Capacity and Energy Charges billing on monthly basis Billing of adjustments for deviations on weekly basis RLDC to furnish data to REB Secretariat by Thursday noon for week ending Sunday. REB Secretariat to finalize and issue REA by Tuesday, for seven day period ending on penultimate Sunday. All data to be retained for 20 days (for RLDC & REB) for verification. Commercial Mechanism * Availability Based Tariff ( a) Capacity Charge (b) Energy Charge (c) Adjustment for Deviations SRLDC/Comml/IEGC/34

Scheduling Process On Day-l 10 AMISGSs advise foreseen plant-wise ex-. power plant MW, MWh * capability for next day 11 AMRLDC advises SEBs their MW, MWh* shares in foreseen ISGSs' availability 3 PMSLDCs furnish their,time-wise MW requisition from the above, and schedule of bilateral exchanges, if any 5 PMRLDC issues' despatch schedules' for ISGSs and 'net drawal schedules' for SEBs, for each hour the next day starting at midnight 10 PMSLDCs may inform any change of the above or bilateral exchanges to RLDC, if required by any new development during the day 11 PMSchedules frozen for the next day. RLDC Issues final drawal schedules to each State & Despatch schedule to each ISGS SRLDC/Comml/IEGC/41

On Day 0 On Day + 1. RLDC to issue before-the- fact Capacity Declaration/Schedules finally implemented by RLDC (Datum for accounting and working out average ex-power plant capability). Time block tAny State may revise drawal schedule from any/all ISGS Any ISGS may revise their foreseen capability Time block t+3RLDC to issue revised ‘drawal schedules' and despatch schedules SRLDC/Comml/IEGC/42

Scheduling Process Scheduling for the next day Every day by 10 AM, RLDC collects the foreseen plant-wise ex-power plant MW capability of ISGSs for the next day By 11 AM, RLDC advises SEBs, on a 15 minutes blockwise level, their entitled MW shares from each ISGSs’ availability By 3 PM, RLDC receives block-wise MW requisition from SLDCs and also the schedule of bilateral exchanges, if any By 5 PM, RLDC issues ‘despatch schedules’ for ISGSs and ‘net drawal schedules’ for SEBs, 15 minutes block-wise for the next day starting at midnight. Upto 10 PM SLDCs may inform any change of the above or bilateral exchanges to RLDC, if required by any new development during the day. At 11 PM Schedules are frozen for the next day. RLDC issues final drawal schedules to each State & Despatch schedule to each ISGS.

1000 MW HRS24 Forecast ex-bus capability of power plant SEB - A’s entitlement (40%) Entitlement for which Capacity charges Are payable by SEB-A Schedule for which Energy charges Are payable by SEB- A Declared Capability for which Capacity charges Are recieveable by ISGS Gen.Sched. for which Energy charges Are recieavable by ISGS

Scheduling Process Any change of schedule for the current day In case of any forced outage of a unit, or in case of any transmission bottleneck or in the interest of better system operation, RLDC may revise the schedules. The revised schedules will become effective from the 4 th time block. ISGSs and/or SLDCs may also revise their schedules during a day. The revised schedules will become effective from the 6 th time block.

REVISION OF SCHEDULES/REQUISITIONS A) OUTAGE OF GENERATING UNIT B) REVISED DECLARATION OF AVAILABILITY BY ISGS C) OUTAGE OF A TRANSMISSION ELEMENT D) UNFORESEEN LOAD-CRASH TAKES EFFECT FROM A) 4 TH TIME BLOCK IN CASE OF - FORCED OUTAGE OF A GENERATING UNIT - TRANSMISSION CONSTRAINT - GRID DISTURBANCE - SUO MOTO BY RLDC B) 6 TH TIME BLOCK IN CASE OF - REVISION OF DECLARED AVAILABILITY BY ISGS -REVISION OF REQUISITIONS BY BENEFICIARIES

REACTIVE ENERGY CHARGE : PAYABLE FOR : 1.VAR DRAWALS AT VOLTAGES BELOW 97% 2. VAR INJECTION AT VOLTAGES ABOVE 103% RECEIVABLE FOR: 1.VAR INJECTION AT VOLTAGES BELOW 97% 2. VAR DRAWAL AT VOLTAGES ABOVE 103% APPLIED FOR VAR EXCHANGES BETWEEN : A)BENEFICIARY SYSTEM AND ISTS - THROUGH A POOL ACCOUNT B)TWO BENEFICIARY SYSTEMS ON INTER-STATE TIES - BY THEMSELVES RATE: 4 paise/kvArh ( UPTO ) WITH 5% ESCALATION PER YEAR

Regional Energy Account & Settlement System Capacity and Energy Charges billing on monthly basis Settlement of adjustments for deviations ( UI) on weekly basis RLDC to furnish data to REB Secretariat by Thursday noon for previous week ending Sunday REB Secretariat to finalize and issue REA by Tuesday, for seven day period ending on penultimate Sunday All accounts open for 20 days for verifications and clarifications

SRLDC/Comml/IEGC/47