Wind Operations Task Force Overview for ROS Feb 2009 mtg: WOTF has drafted a scope for ROS to consider. WOTF recommendations for Chair & Vice Chair: Chair.

Slides:



Advertisements
Similar presentations
1 TSS Report PCC Meeting Salt Lake City, UT October 26-27, 2006.
Advertisements

Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
Texas Regional Entity Compliance Report TAC July 9, 2009.
ROS June 12, 2008 Meeting ROS Report for June 26, 2008 TAC Meeting Randy Jones ROS Vice Chair.
RTWG Report to TAC August 5, 2010 Howard Daniels.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee April 8, 2010.
1 WMS Report To TAC September In Brief Four Working Group Reports Four Working Group Reports One Task Force Report One Task Force Report Three.
Texas Regional Entity Compliance Report Board of Directors May 19, 2009.
Reliability and Operations Subcommittee Report Presentation to the ERCOT Technical Advisory Committee January 6, 2005.
PMO Update to PRS Troy Anderson Program Management Office April 20, 2007.
TEXAS NODAL Board of Directors Austin, Texas July 15, 2003.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee March 4, 2010.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
September 4, 2008 TAC Meeting Summary For Sept. 11 ROS Meeting Paul Rocha ROS Chair.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
Lead from the front Texas Nodal 1 TPTF Update for TAC March 8, 2007 Trip Doggett.
ROS Meeting – 05/15/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 05/15/08.
September 2012 Wholesale Market Subcommittee Report to Technical Advisory Committee.
December 18, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott January 6, 2015 TAC Update to RMS 1.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
Nodal ATF 1 Nodal Advisory Task Force Update for TAC September 2 nd, 2010.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
HAPUA WG No.5 (ESI Services) Updates The WG2, 5, 6 and Chairman of APGCC Meeting Jakarta, Indonesia ● 26 February 2009 By WG 5 Project Coordinator: MR.
Generation Adequacy Task Force Update to WMS November 18, 2009.
August 28, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 9, 2014 TAC Update to RMS 1.
September 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
CMWG Update Mark Soutter - Invenergy LLC WMS November 2015 Meeting.
1 WMS Report To TAC May In Brief One Working Group Reports One Working Group Reports Two Task Force Reports Two Task Force Reports One Staff report.
Page 1 of 13 Texas Regional Entity ROS Presentation April 16, 2009 T EXAS RE ROS P RESENTATION A PRIL 2009.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 30, 2007 Trip Doggett.
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
1 TAC Report to the ERCOT Board February 16, 2005.
Report to TAC March In Brief Voting Items Voting Items GATF – WMS endorsed the recommendations of the GATF GATF – WMS endorsed the recommendations.
PRR Impact Analysis Update Steve Wallace Program Management Office October Board Meeting.
1. Non-Dispatchable Resources and EIS Market Carrie Simpson May 30,
October 3, 2013 Technical Advisory Committee (TAC) Update to RMS Kathy Scott October 16, 2013TAC Update to RMS 1.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee December 5, 2002.
Feb 18, TAC Report to the ERCOT Board February 18, 2003.
Technical Advisory Committee Presentation to the ERCOT Board of Directors March 21, 2007.
Report to TAC July In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG DSWG MCWG MCWG MWG MWG QMWG QMWG VCWG VCWG Task Forces Task.
George Zhou, VGITF Chair October 14, 2015 Salt Lake City, Utah Variable Generation Interconnection Task Force Update to PCC.
CMWG NATF 11/02/2010- CCT/DME update + Outages in the CRR Model follow-up Steve Reedy – Market Design and Analysis 1.
ROS July 10, 2008 Meeting WOTF Update on ROS Action Plan Summary: EECP Step #2 (Feb.26 th, 2008) Mark Garrott WOTF Chair.
ROS Report to TAC October 5, Outline  General Items  Nodal Operating Guides  OGRR192  Document control issues  Proposed revisions to Texas.
1 TAC Report to the ERCOT Board November 14, 2006.
ERCOT DYNAMICS WORKING GROUP Report to ROS August 16, 2007 Vance Beauregard, American Electric Power.
TAC December 3, 2009 Meeting Update 1. TX Nodal Implementation 2 PhaseWhenScopeStatus 2.1: Market Connectivity MILESTONE COMPLETE Oct. 28MP interface.
QSE Managers Working Group Meeting Notes 9 June, 2009 Report to WMS 17 June, 2009 David Detelich - Chairperson.
Current Stakeholder Timelines for Emergency Issues May 6, 2008 TPTF.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting March 11, 2008.
11/3/2011 Technical Advisory Committee TAC Update Kyle Patrick.
Network Operations Model Go-Live Decision Kenneth Ragsdale TAC July 1, 2010.
COPS JULY 2013 UPDATE TO TAC 07/02/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
Page 1 of 21 Texas Regional Entity ROS Presentation June 11, 2009 T EXAS RE ROS P RESENTATION J UNE 2009.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Planning Coordinator - Gap Resolution Team Lorissa Jones – GRT Chair PCC Update March 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
TPTF Update Trip Doggett TAC March 9, TPTF Update Meetings February 6 & 7, February 20 Attendance approximately 40 Completed review of ERCOT’s clarification.
Texas Congestion Management Work Group Update For WMS Marguerite Wagner, PSEG Texas.
Wind Operations Task Force Overview for ROS Jan 2009 mtg: WOTF is continuing work on issues #1a/b/c, 1d, 3e, and 5. The WOTF makes no recommendation to.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 7, 2009.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
Renewable Technology Working Group (RTWG) Report to TAC February 4, 2010 Henry Durrwachter.
TEXAS NODAL (ERCOT REVISIONS)
Protocol Revision Subcommittee
Technical Advisory Committee
Recommendation of Texas Test Plan Team to RMS
Oncor Electric Delivery Company LLC
Presentation transcript:

Wind Operations Task Force Overview for ROS Feb 2009 mtg: WOTF has drafted a scope for ROS to consider. WOTF recommendations for Chair & Vice Chair: Chair – Mark Garrett (Direct Energy) Vice Chair – Mark Soutter (Invenergy) WOTF makes no recommendation on WOTF vs WOWG. WOTF is continuing work on issues #1a/b/c, 1d, 3e, and 5.

Wind Operations Task Force – status on #1a/b/c Issue 1a/b/c: Better defined voltage support requirements & practices, and SCADA control Phase 1 is a survey by staff of existing capabilities, and was just completed in Jan. Phase 2 was holding the Wind Workshop II on Aug 22 (complete). WOTF has begun brainstorming on possible action item for Phase 3. The main item being discussed: 1.Possible improvements in better coordination of all data requests and requirements. The WOTF has established a Modeling Subgroup, led by Brad Schwarz (E.On). It met first on Jan 22, drafting a list of data requirements and discussing the merits of detailed vs equivalanced subtransmission models. It will meet again on Feb 25 (prior to WOTF 2/26 mtg).

Wind Operations Task Force – status on #1d Issue 1d: Generation Interconnection Checklist Part 1 is complete – development of the Nodal readiness metric. Part 2 – review of a voltage control test, prequalification, and synchronization test requirements – The WOTF is still waiting on a first draft from staff. Staff has a draft under consideration. See Operating Guide Unit Reactive Capability Testing.

Wind Operations Task Force – status on #3e Issue 3e: Evaluating possible coordination of transmission line outages. CMWG helped develop, PRS has approved, and TAC is considering PRR 795: “90-Day Transmission Outage Scheduling Timeline” to cover TCR deadlines. This should be effective March 1. The CMWG is not drafting any further developments at this time, waiting to see the results of PRR 795. The WOTF has kept this issue open as a placeholder to consider the reliability aspects of a coordination proposal if one was developed by the marketing group.

Wind Operations Task Force – status on #5 Issue 5: Alternate solutions to high frequency conditions OOM instructions to wind resources – Staff will continue to use OOM instructions under selected conditions, but isn’t seeking further codification into the Operating Guides. Governor Response – Since Type 3 & Type 4 wind turbines can possibly provide such service, how can this capability be utilized? The WOTF discussed a possible requirement for future wind farms to be able to provide governor response service, and will likely be drafting a PRR to cover this. Reg down bids – Response capability is technology specific; and protocol changes would be necessary. How can we measure response of an intermittent resource? The WOTF will be discussing a white paper next month.

Wind Operations Task Force – further discussion Unassigned Issue: Possible overreliance on N-0 SPSs SPSs to run back wind resources – The WOTF discussed concepts for a potential Op Guide revision for “N-0” SPSs. With 70 wind farms using the “No Bid” flag, staff has had to deal with numerous daily local congestion in an individual manual manner. The question is: Can very selective line flow information be provided to a WGR to give a more flexible guidance before tripping occurs? Staff is drafting an OGRR for consideration by the OGRTF.

Wind Operations Task Force – upcoming The next WOTF mtgs will be Thurs Feb 26 & Tues March 31. The next WOTF Modeling Subgroup mtg will be Wed Feb 25. An list at lists.ercot.com will be established for the group shortly.