LIU-SPS e-cloud contribution to TDR Electron cloud meeting, 17/02/20141 o First draft by end of February 2014. Between 5 to 10 max pages per chapter, refer.

Slides:



Advertisements
Similar presentations
RHIC electron cloud and vacuum pressure rise characteristics P.He, H.C.Hseuh, W.Fischer, U.Iriso, D.Gassner, J.Gullotta, R.Lee, L.Smart, D.Trbojevic, L.F.Wang.
Advertisements

Heat load due to e-cloud in the HL-LHC triplets G. Iadarola, G. Rumolo 19th HiLumi WP2 Task Leader Meeting - 18 October 2013 Many thanks to: H.Bartosik,
Expected performance in the injectors at 25 ns without and with LINAC4 Giovanni Rumolo, Hannes Bartosik and Adrian Oeftiger Acknowledgements: G. Arduini,
Summary of the two-stream instability session G. Rumolo, R. Cimino Based on input from the presentations of G. Iadarola, H. Bartosik, R. Nagaoka, N. Wang,
Electron-cloud instability in the CLIC damping ring for positrons H. Bartosik, G. Iadarola, Y. Papaphilippou, G. Rumolo TWIICE workshop, TWIICE.
March 14-15, 2007ECloud Feedback, IUCF1 Electron-Cloud Effects in Fermilab Booster K.Y. Ng Fermilab Electron-Cloud Feedback Workshop IUCF, Indiana March.
Helmholtz International Center for Oliver Boine-Frankenheim GSI mbH and TU Darmstadt/TEMF FAIR accelerator theory (FAIR-AT) division Helmholtz International.
Review of 2011 studies and priorities for 2012 LIU-SPS-BD.
Preliminary results and ideas for the SPS upgrade MDs on LHC beams in 2011 G. Rumolo on behalf of all the MD team (Elena, Thomas, Karel, Christina, Holger,
Vacuum, Surfaces & Coatings Group Technology Department 04/12/2014 R. Salemme – COLDEX results during SPS Scrubbing Run I Electron Cloud Meeting #18,
SPS scrubbing run in 2014 H. Bartosik, G. Iadarola, G. Rumolo LHC Performance Workshop (Chamonix 2014), 22/9/2014 Many thanks to: G. Arduini, T. Argyropoulos,
E-CLOUD VACUUM OBSERVATIONS AND FORECAST IN THE LHC Vacuum Surfaces Coatings Group 03/07/2011 G. Bregliozzi On behalf of VSC Group with the contributions.
Giovanni Rumolo, G. Iadarola and O. Dominguez in LHC Beam Operation workshop - Evian 2011, 13 December 2011 For all LHC data shown (or referred to) in.
Carbon for SPS, state or the art and scrubbing runs, P.Chiggiato, P.Costa Pinto, P.Cruikshank, J.Ferreira Somoza, H.Neupert, A.Sapountzis, M.Taborelli,
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Final results of the E-Cloud Instability MDs at the SPS (26 and 55 GeV/c) G.
SPS scrubbing experience: electron cloud observables L. Mether on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, September 8, 2015.
LHC Scrubbing Runs Overview H. Bartosik, G. Iadarola, K. Li, L. Mether, A. Romano, G. Rumolo, M. Schenk, G. Arduini ABP information meeting 03/09/2015.
LHC beams in the SPS in 2014 H. Bartosik, G. Rumolo, G. Iadarola With the help from K. Kornelis, V. Kain and SPS OP crew.
PS (electron cloud?!) instability at flat top Mauro Pivi Gianni Iadarola, Giovanni Rumolo, Simone Gilardoni, Hannes Bartosik, Sandra Aumon 27/06/2012 ICE.
G. Rumolo, G. Iadarola, H. Bartosik, G. Arduini for CMAC#6, 16 August 2012 Many thanks to: V. Baglin, G. Bregliozzi, S. Claudet, O. Dominguez, J. Esteban-
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
SPS Scrubbing Runs 2014 week 45 and week 50 (part I) H. Bartosik, G. Iadarola, K. Li, L. Mether, G. Rumolo, M. Schenk Thanks to: SPS OP crew, G. Arduini,
Electron cloud SPS in 2012 G. Iadarola, H.Bartosik, F. Caspers, S. Federmann, M.Holz, H. Neupert, G. Rumolo, M. Taborelli LIU Beam studies review.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Elias Métral, LHC Beam Commissioning Working Group meeting, 08/06/2010 /191 SINGLE-BUNCH INSTABILITY STUDIES IN THE LHC AT 3.5 TeV/c Elias Métral, N. Mounet.
Production of bunch doublets for scrubbing of the LHC J. Esteban Muller (simulations), E. Shaposhnikova 3 December 2013 LBOC Thanks to H. Bartosik, T.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
Physics of electron cloud build up Principle of the multi-bunch multipacting. No need to be on resonance, wide ranges of parameters allow for the electron.
LIU-SPS ZS Electrostatic Septum Upgrade Review held on M.J. Barnes & T. Kramer.
Discussion and preliminary conclusions LIU-SPS ZS Electrostatic Septum Upgrade Review M.J. Barnes.
Injection Energy Review D. Schulte. Introduction Will review the injection energy So could answer the following questions: Which injection energy can.
Improved electron cloud build-up simulations with PyECLOUD G. Iadarola (1),(2), G. Rumolo (1) (1) CERN, Geneva, Switzerland, (2) Università di Napoli “Federico.
Some ideas for/from the SPS LIU-SPS team. Scrubbing (only) for ecloud in SPS? aC coating remains baseline..... –but scrubbing has many potential advantages.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Progress on electron cloud studies for HL-LHC A. Axford, G. Iadarola, A. Romano, G. Rumolo Acknowledgments: R. de Maria, R. Tomás HL-LHC WP2 Task Leader.
Simulation of multipacting thresholds G. Iadarola and A. Romano on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, 8 September, 2015.
Electron cloud in the LHC: lessons learnt from 2015 experience with 25 ns beams G. Iadarola, H. Bartosik, K. Li, L. Mether, A.Romano, G. Rumolo, M. Schenk.
Andreas Jansson, "Quadrupole Pick-ups", LHC BI-Review, November 19-20, Quadrupole Pick-ups  What is a quadrupole pick-up?  PS pick-ups and experimental.
Heat load analysis for Inner Triplet and Stand Alone Modules H. Bartosik, J. Hulsmann, G. Iadarola and G. Rumolo LBOC meeting 28 October 2014 Based on.
Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Future Needs and Future Directions Maximizing the LHC Performances J.M. Jimenez …when Nature persists.
February 5, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity -Machine studies -Simulation and modeling -4.1GeV.
Pressure data from SPS MDw35 H.Neupert, M.Taborelli For SPSU, 23/09/2010.
Saturday 9 th April 10:24 Finally « 600 » bunches 14:30 Dump the 600 x :00 Loss maps Green light for 800 bunches 18:40 Fill for 800 bunches 20:48.
Ion effects in low emittance rings Giovanni Rumolo Thanks to R. Nagaoka, A. Oeftiger In CLIC Workshop 3-8 February, 2014, CERN.
Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 ELECTRON CLOUDS AND VACUUM EFFECTS IN THE SPS Experimental Program for 2004 J.M. Jimenez Thanks.
End-of-year talk LIU-SPS BD WG meeting Our meetings in 2015 O During year - 9 meetings of LIU-SPS BD WG (as in 2013, but 10 in 2014 and 12 in.
E. Benedetto, 24/04/14, LIU-PSB Meeting, MDs planning for 2014 MDs planning for 2014 E. Benedetto Thanks: G. Rumolo, B. Mikulec and the RF, OP, ABP, BI.
Simulation of the new PS EC detector: implementation and results A. Romano, G. Iadarola, G. Rumolo LIU-PS Student Day 20 April 2015.
Main Activities and News from LHC e-Cloud Simulations Frank Zimmermann ICE Meeting 8 June 2011.
Electron cloud study for ILC damping ring at KEKB and CESR K. Ohmi (KEK) ILC damping ring workshop KEK, Dec , 2007.
LHC Scrubbing Run 1 Day 3 (27/06/2015) Scrubbing team 28/06/2015.
End-of-year talk LIU-SPS BD WG meeting Our meetings in 2013 O During year - 9 meetings of LIU-SPS BD WG (less than usual 12 in the past :-)
Progress on e-cloud effects (PS and SPS) G. Iadarola, H.Bartosik, G. Rumolo, M. Taborelli, C. Yin Vallgren Many thanks to: G. Arduini, T. Argyropoulos,
Electron Cloud Effects: Heat Load and Stability Issues G. Iadarola, A. Axford, K. Li, A. Romano, G. Rumolo Joint HiLumi LHC - LARP Annual Meeting,
Outcome of beam dynamics simulations - Scenarios, requirements and expected gains s LIU-SPS Coordination meeting 26/08/2015 A. Lasheen, E. Shaposhnikova,
Optics solutions for the PS2 ring February 11 th, 2008 LIS Section Meeting Y. Papaphilippou.
Benchmarking Headtail with e-cloud observations with LHC 25ns beam H. Bartosik, W. Höfle, G. Iadarola, Y. Papaphilippou, G. Rumolo.
Two-beam instabilities in low emittance rings Lotta Mether, G.Rumolo, G.Iadarola, H.Bartosik Low Emittance Rings Workshop INFN-LNF, Frascati September.
Two beam instabilities in low emittance rings Lotta Mether, G.Rumolo, G.Iadarola, H.Bartosik Low Emittance Rings Workshop INFN-LNF, Frascati September.
A preliminary overview on the 2014 Scrubbing Run II The scrubbing team, i.e. H. Bartosik, G. Iadarola, K. Li, L. Mether, A. Romano, G. Rumolo, B. Salvant,
Off-axis injection lattice design studies of HEPS storage ring
Electron Cloud Effects
Beam Instability in High Energy Hadron Accelerators and its Challenge for SPPC Liu Yu Dong.
Heat load estimates for the Long Straight Sections of the HL-LHC
A. Al-khateeb, O. Chorniy, R. Hasse, V. Kornilov, O. Boine-F
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Multiturn extraction for PS2
Scrubbing progress - 10/12/2012
SPS collective effects Hannes, Gianni, Giovanni, Benoit, Yannis
Presentation transcript:

LIU-SPS e-cloud contribution to TDR Electron cloud meeting, 17/02/20141 o First draft by end of February Between 5 to 10 max pages per chapter, refer to existing publications o Proposal concerning electron cloud Simulation study of SPS chambers  ECLOUD12 paper summarizes the outcomesECLOUD12 paper Experimental activities at SPS − Beam quality studies, signal from e-cloud monitors, experiment with a- C coated pipe and solenoids at both ends to explain pressure rise  all described in the note published last year, CERN-ATS-Note MD needs to be compressed in few pagesCERN-ATS-Note MD − Doublet beam tests (optimized scrubbing)  IPAC paperIPAC paper Future plans (post-LS1, strategy coating vs. scrubbing)  Hannes’ paper from RLIUP paper from RLIUP

Future studies (SPS) Electron cloud meeting, 17/02/20142 o Simulations Simulation of main quadrupoles QD and QF (SEY threshold) E-cloud monitors (including the holes) COLDEX – meeting with TE/VSC colleagues to define the needs Instability thresholds with all chambers (MBB, MBA, QD, QF, SS1, SS2)? o Experimental activities at SPS (scrubbing run MDs) 25 ns beam ( standard and BCMS) − Recover 2012 performance − Push performance to maximum intensity (possibly higher brightness thanks to the PSB-PS larger longitudinal emittance transfer), Monitor scrubbing process based on e-cloud observables (liners, beam lifetime, emittances, tune shift along the train, chromaticity needed to stabilise). Characterization of the a-C coated cell. In-situ SEY measurements device? Doublet beam, full set up (need to set up slower acceleration cycle, Q20 and Q26) High Bandwidth Feedback System tests on single bunches of a multi-bunch beam (using directly data with ECI, if possible) Test 8b + 4e scheme (e-cloud efficient ?) COLDEX measurements with cold a-C coating (probably in 2015?)

Injector schedule 2014 Electron cloud meeting, 17/02/20143

Future studies (LHC) Electron cloud meeting, 17/02/20144 o Simulations (no experiments in 2014) Simulation of all SAMs and semi-SAMs (SEY threshold) Comparison with heat load data to determine − Evolution of SEY − Present value of SEY Heat load in dispersion suppressor to determine fractions of e-cloud in arc dipoles and quads Comparison with stable phase shift measurements including alos the contribution from arc quads + SAMs + semi-SAMs Extract all the heat load data from ITs (2011 – 2013) − Define a strategy to determine the scrubbing history with both 50 and 25 ns beams (simulations of some selected points) − Project for summer student submitted Simulation of higher order magnets (sextupoles, octupoles) Do we need to include also the drifts in all our comparisons with heat load data? (usually cryostats include long drift portions) Holes in the beam screen: effect in dipoles ? E-cloud in BSRT chamber? Can we change the magnetic field and measure heat load? Stability for different octupole polarities (to explain hunchback instability)

Future studies (PS) Electron cloud meeting, 17/02/20145 o Simulations Simulation of the new e-cloud monitors in SS98 (expected signal) Instability simulations ?  self-consistent approach needed, maybe start with concatenating PyECLOUD and HEADTAIL (how easy through cobra-HEADTAIL?) o Experimental activities at PS Measurements with the new monitors installed (25 and 50 ns, different bunch lengths over the last part of the cycle) Cover higher intensities, up to LIU values, if achievable after LS1 with the new longitudinal feedback More instability data? o New Technical student will start in March 2014  Annalisa Romano

Future studies (Miscellaneous) Electron cloud meeting, 17/02/20146 o More LHC and HL-LHC studies BGV, MKI, TDI, BSRT … HL-LHC  Triplets in IP2 and IP8, include D1 with new triplets in IP1 and IP5, SAMs from matching sections  April o CLIC damping rings Check electron cloud in the electron ring for the rebaselining? (possible resonant values for which there could be electron accumulation even in electron ring) Check for cyclotron resonances in wigglers? (scan in magnetic field between -2.5 and 2.5 T) o FCC Define possible electron cloud issues in the FCC and injector chambers (defined by magnet and resistive wall constraints) Scan over bunch intensities and spacings under consideration