GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section 17 1 GLAST Large Area Telescope: Performance & Safety Assurance WBS: 4.1.A.

Slides:



Advertisements
Similar presentations
Mission Success Starts With Safety GSFC Electrostatic Discharge (ESD) Control Program Are you plugged in? Jeannette Plante, Program Manager, Code 300.
Advertisements

USING NASA QUALITY STANDARDS NASA Academy of Aerospace (AAQ) Quality Mini-Workshop Ken Crane Quality Engineering Technical Discipline Team Lead NASA SAFETY.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Safety Overview.
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
GLAST LAT ProjectDOE/NASA Status Review, March 31 & April 1, 2004 Performance & Safety Assurance 1 GLAST Large Area Telescope: Performance & Safety Assurance.
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
ISO 9000 Certification ISO 9001 and ISO
Section 20.0 Mission Assurance Roger Counts Systems Assurance Manager ST5 PDR June 19-20, 2001 GSFC 5 Space Technology “Tomorrow’s Technology Today”
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 N. Virmani Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
C osmic R Ay T elescope for the E ffects of R adiation PERFORMANCE ASSURANCE BRIAN KLATT MISSION ASSURANCE MANAGER.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Safety and Mission Assurance Jorg Fischer, PFP SMA Manager.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
24a - 1 NASA’s Goddard Space Flight Center Mission Assurance Ron Kolecki Senior Systems Assurance Manager August 16-17, 2005.
GLAST LAT ProjectMarch 24, H Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS H: Tower Shipping and Storage.
24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept EFW INST+SOC PDR97 RBSP Electric Field and Waves Instrument (EFW) Product.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 Survey & Process Review conducted at Teledyne on Nov. 14, 2003.
THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
1 MAVEN Documentation Training. Date September 12, 2011 Particles and Fields Package (PFP) MAVEN - FLT Traveler Book Documentation Training Safety and.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 STEREO Product Assurance Ron Jackson
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 1 GLAST Large Area Telescope:
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
Accelerator Readiness Review October 31, 2006
EFW DFB Systems Assurance
EFW DFB Systems Assurance
I&T&C Organization Chart
GLAST Large Area Telescope:
THEMIS Mission Assurance
Peer Review Agenda (Suggested).
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
BRIAN KLATT MISSION ASSURANCE MANAGER
Thermal Vacuum Test: Plans and Procedures
Integration and Test Organization Chart
GLAST Large Area Telescope
Introduction and Overview
PSS verification and validation
GLAST Large Area Telescope:
DOE Review of the LCLS Project October 2006
GLAST Large Area Telescope:
DOE Review of the LCLS Project 7-9 February 2006
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section 17 1 GLAST Large Area Telescope: Performance & Safety Assurance WBS: 4.1.A Darren S. Marsh Stanford Linear Accelerator Center Performance & Safety Assurance Manager Gamma-ray Large Area Space Telescope

GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section 17 2 Outline Introduction Organization Requirements Safety & Mission Assurance Program Reviews Performance Assurance System Workmanship & Inspection Contamination Control Nonconformance Reporting Materials and Processes Systems Safety

GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section 17 3 Introduction Performance & Safety Assurance is a program consisting of: –Quality Assurance Hardware Software –Systems Safety –EEE Parts Program –Materials & Processes Program –Contamination Control –Reliability & Risk Management Program –Design Verification –Technical Reviews

GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section 17 4 Performance Assurance Functional Responsibilities FUNCTIONAL ELEMENTINSTITUTIONS (LEAD) Hardware QualitySLAC (Marsh), GSFC (Kolecki), NRL (Virmani) Flight Software AssuranceSLAC (Sawyer) Reliability Engineering Continuous Risk Management SLAC (Thurston, Horn) SLAC (Marcellini, Horn) EEE Parts Program NRL (Virmani) Materials & Processes Program SLAC (Nordby, Tice) Instrument Design Verification - Design Verification Planning - Analytical Design Verification - Functional Design Verification SLAC (Horn) SLAC (Klaisner) SLAC (Bloom) Systems Safety SLAC (O’Neill) SLAC (Cullinan) Configuration Management SLAC (Horn, Cramer) Contamination Control

GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section 17 5 Performance & Safety Assurance Requirements LAT Documents GLAST Project Office Documents Requirements apply to all work by the LAT collaboration and their subcontractors and suppliers of deliverable space flight hardware and software Contamination Control Plan 433-PLAN-0010 LAT Mission Assurance Reqs 433-MAR-0001 EEE Parts MGMT Plan 433-PLAN-0004 LAT Flight S/W Mgmt. Plan LAT-MD LAT Mechanical Parts Plan LAT-SS LAT Quality Manual LAT-MD Parts Program Control Plan LAT-MD System Safety Program Plan LAT-MD LAT Inst. Perf. Verification Plan LAT-MD Configuration Management Plan LAT-MD LAT Contam. Control Plan LAT-MD LAT Risk Mgmt. Plan LAT-MD LAT Performance Assurance Implementation Plan LAT-MD

GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section 17 6 Safety & Mission Assurance Program Reviews Fiscal Years GLAST scheduled for launch in September 2006 Begin LAT I&T Critical Design Review PDR PER PreShip Review LAT Ready For S/C I&T FABRICATION PHASECOMMISSIONING PHASE Build & Test Flight Units Observatory I&T Final Design Engr’g Models LAT I&T Ops. Prelim. & Sys. Design Pre-PDR S&MA Survey PDR Delta Baseline Review Pre-CDR S&MA Survey

GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section 17 7 Results from GSFC Pre-PDR S&MA Survey Goddard Space Flight Center (GSFC) Office of System Safety and Mission Assurance (OSSMA) performed a survey of the LAT Program April 3-4, 2001 –The goal of the survey was to evaluate the status of the LAT Safety & Mission Assurance Program and give GSFC and LAT personnel the opportunity to discuss Safety & Mission Assurance documentation –The SLAC survey did not result in any “Findings”, there were nine “Observations” and two “Commendations” Nearly all the recommendations identified in the survey were addressed –Documentation updated to reflect comments provided –Secured the necessary expertise in specific disciplines

GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section 17 8 Results from PDR/Baseline Reviews Findings from January 2002 PDR/Baseline Review: The Committee concluded that Performance & Safety Assurance was at PDR level and recommended baselining One RFA was generated from the review –Describe the LAT Metrology Program (S. Scott) LAT Quality Procedure LAT-MD-00470, Inspection, Measuring & Test Equipment, has been established to ensure that monitoring and measurement can be carried out and are carried out in a manner that is consistent with the monitoring and measurement requirements Findings from the July 2002 Delta PDR/Baseline Review: The Committee reaffirmed the decision to baseline the Performance & Safety Assurance subsystem No RFAs were identified for Performance Assurance

GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section 17 9 Results from GSFC Pre-CDR S&MA Survey Goddard Space Flight Center (GSFC) Office of System Safety and Mission Assurance (OSSMA) performed a survey of the LAT Program December 10-11, 2002 –The goal of the survey was to evaluate the status of the LAT Safety & Mission Assurance Program and to assess the program’s readiness for the LAT CDR –The SLAC survey did not result in any “Findings”, there were eight “Observations” Excerpt from the Survey Closeout Report –“It is the conclusion of this survey team that the LAT Performance and Safety Assurance Program is CDR ready.”

GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section LAT Performance Assurance System LAT Performance Assurance Implementation Plan (PAIP), LAT-MD-00039, released and approved by GSFC –Requirements for performance assurance elements are defined LAT Quality Manual, LAT-MD-00091, completed and released –LAT Quality Management System (QMS) is established, documented, implemented and aligned with the requirements of ISO 9001 Documentation to ensure the effective planning, operation and control of assurance activities –Configuration Management Plan, LAT-MD –LAT EEE Parts Program Control Plan, LAT-MD –LAT Contamination Control Plan, LAT-MD –LAT Flight Software Management Plan, LAT-MD –LAT Mechanical Parts Plan, LAT-SS –LAT Continuous Risk Management Plan, LAT-MD –LAT Instrument Performance Verification Plan, LAT-MD GOAL IS CONFORMANCE TO REQUIREMENTS

GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section Performance Assurance Activities Collaborator/Supplier Surveillance Activities –Surveys of collaborators and key suppliers to evaluate ability to produce quality flight hardware and ensure project requirements are met –Review and approve specifications, travelers/work orders and NCRs –Perform on-site source inspections to monitor or witness fabrication, assembly and/or integration & test activities Ensure contamination control requirements are met Compliance to ESD requirements Review travelers/routers, fabrication and workmanship procedures Equipment calibration review Material handling and shelf life material storage

GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section Fabrication, Assembly, Integration and Test Process Production Readiness Review (PRR) –Review of detailed fabrication and assembly plan using completed drawings, process, tooling, and in-process test procedures Fabrication, Assembly, Integration –All work will be conducted in a controlled manner so that end item conforms to requirements Test Readiness Review –Evaluate the planned test/calibration program and test flow to assure that it meets program needs Comprehensive Performance Test Activities –Instrument Performance Verification Plan, LAT-MD-00408, released and approved –LAT Environmental Specification, LAT-SS-00788, released and approved –Requirements traceability/verification matrix Comprehensive Performance Test Activities Production Readiness Review Fabrication, Assembly, Integration Test Readiness Review

GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section Delivery & Acceptance Process Pre-Ship Review –Assure the design of the item has been validated through the environmental qualification and/or acceptance test program, that all open items have been dispositioned Flight Unit Delivery –Plans for shipping container, environmental control and mode of transportation developed Post-Ship Acceptance Test –Verifies functionality of delivered hardware to integrator Pre- Ship Review Deliver Hardware to Integration Site Post Ship Acceptance Test

GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section Workmanship and Process Control LAT personnel working on flight hardware will be trained and certified to the following standards (or equivalent approved ESA standards): –NASA-STD , Workmanship Standard for Staking and Conformal Coating of Printed Wiring Boards and Electronic Assemblies –NASA-STD , Workmanship Standard for Surface Mount Technology –NASA-STD , Requirements for Soldered Electrical Connections –NASA-STD , Requirements for Crimping, Interconnecting Cables, Harness, and Wiring –NASA-STD , Electrostatic Discharge Control

GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section Workmanship & Inspection Requirements A work order/traveler will define the steps for QA inspection –Quality records will be maintained and reviewed Mandatory inspections points (MIP) will be performed for integration & test at predefined inspection points –To screen out defects caused by workmanship, design, assembly, etc. –To prevent unacceptable products from entering the next stage of production –A final inspection verified that the hardware/software deliverables meet requirements and are properly documented

GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section Contamination Control Cleanroom environments –LAT assembly, integration & test activities will be performed in class 100,000 environment –LAT personnel are trained in contamination control Monitoring, recording, and inspections –Continuous temperature, %RH, and multiple port airborne particle count monitoring –Fallout witness plates, tape lifts, and/or NVR solvent rinses/swabs are planned –Visual inspections of hardware and cleaning as required prior to each closeout activity LAT Contamination sensitive hardware (calorimeter, tracker, and ACD) shall meet Level 750B surface cleanliness per MIL-STD-1246

GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section Contamination Control (Con’t.) Additional requirements –Calorimeter Cesium Iodide crystals shall not be exposed to >45% relative humidity –ACD photomultiplier tubes are shall not be exposed to excessive helium levels as specified in LAT Contamination Control Plan Atmosphere Control using GN2 and/or dry air –ACD requires purge if measured helium levels exceed 10 ppm GN2 will be filtered and certified to Grade B, 99.99% pure per MIL-P –Dry air flow to calorimeter as required will limit Cesium Iodide crystals exposure to humidity < 45% RH

GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section Contamination Control (Con’t) Materials selection –Select materials that satisfy outgassing of ≤ 1% TML and ≤ 0.1% CVCM Bakeout –Plan is to do a vacuum bakeout of LAT at 40˚C at start of thermal-vacuum test –The parameters of subsystem or component bakeouts (e.g., temperature, duration, and pressure) will be individualized depending on materials used, the fabrication environment, and the established contamination allowance. –Required thermal vacuum testing of flight hardware shall be performed and outgassing rates shall be monitored to achieve required outgassing levels

GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section Nonconformance Reporting All nonconformances will be reported through a nonconformance & corrective action (NCR/CA) system –The LAT will ensure that product which does not conform to requirements is identified and controlled to prevent its unintended use or delivery –Action will be taken to eliminate the cause of nonconformance in order to prevent recurrence –Close-out of all nonconformance reports shall be verified Work stopped until the nonconformance is reviewed and dispositioned by Material Review Board (MRB) –Records of the nature of nonconformities and any subsequent action taken, including concessions obtained, shall be maintained –When nonconforming product is corrected it shall be subject to re-verification to demonstrate conformity to the requirements

GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section Nonconformance Reporting Process Nonconformances will be reported to GSFC in accordance with MAR requirements TKR CAL ACD ELEX MECH End Item/Traveler Data Package Program Records Database IPO LAT IOC Operations End Item Data Package M R B M R B M R B M R B M R B Operations Data F R B F R B Observatory End Item Data Package F R B GLAST Project Office Observatory Office NCR/CA

GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section LAT Materials and Parts Material requirements –Source: 433-MAR-0001, “Mission Assurance Requirements” –LAT: LAT-SS , “Mechanical Parts Plan” Material Usage Agreement (MUA) needed for non-compliant materials –All materials have been assessed by GSFC materials branch to be compliant to standards and used in conventional methods –Currently the project requires no MUA’s Relevant procedures and guidelines for material selection –Metallic Materials for Stress Corrosion Cracking Resistance in Sodium Chloride Environment (MSFC-STD-3029) –Fastener Integrity Requirements (541-PG ) –Standard Test Method for Total Mass Loss and Collected Volatile Condensable Materials for Outgassing (ASTM-E-595) Total Materials Count on LAT M&P List

GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section LAT M&P List: Inorganic, Polymer and Composite Materials Inorganic materials –Inorganic materials submitted to LAT IPO as of 29 April 2003 Polymers and Composites –Polymer and composite materials submitted to LAT IPO as of 29 April 2003 Inorganic Materials Count on LAT M&P List Polymer and Composite Materials Count on LAT M&P List

GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section LAT M&P List: Lubricants and Processes Lubricants –Lubricants used only in static applications, largely for bolts –No moving parts within the LAT –Lubricants submitted to LAT IPO as of 29 April 2003 Processes –M & P list collects process information for all heat treating and surface treatment processes –Processes submitted to LAT IPO as of 29 April 2003 Lubricant Count on LAT M&P List Processes on LAT M&P List

GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section Materials List Pending Items Pending items as of 29 April 2003 Reasons for status –Specific material not yet chosen –Waiting for “TBD’s” to be filled in –Outgassing testing in progress Mechanical Parts Review Board will evaluate materials once missing information is collected from test results or work with manufacturer Final step is to validate materials list –Cross-check against drawing list –Check for missing materials and processes Materials Pending Materials Branch Approval

GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section Systems Safety The purpose of the LAT Systems Safety Program is to identify the hazards of the LAT and impose design requirements and establish controls to reduce the associated risk to acceptable levels. Established and implemented System Safety Program Plan (SSPP), LAT-MD –Complies with EWR 127-1, Eastern and Western Range Safety Requirements –LAT Preliminary Hazard Analysis, LAT-MD Identifies safety critical areas, assesses risk, and establishes requisite hazard controls –LAT Operating and Support Hazard Analysis, LAT-MD Evaluates activities for hazards or risks introduced into the system by operational and support procedures and evaluates the adequacy of operational and support procedures used to eliminate, control, or abate identified hazards or risks.

GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section LAT Hazard Analysis 17 Hazardous Materials Mechanical damage to calorimeter Calorimeter 10 Hazardous Materials Rupture of heat pipes Mechanical 8 Collision Structural failureMechanical 8 Electrical Electrical short circuit or overloadElectronics RAV* Hazards Group Hazards Subsystem Risk Priority: Unacceptable Undesirable (Acceptable With Proper Controls) Operation Permissible Hazard controls have been identified and established Verification of hazard controls will be on-going *The Risk Assessment Value (RAV) is derived from MIL-STD-882D, Standard Practices for System Safety.

GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section LAT Operating and Support Hazard Analysis Electrical Electromagnetic interface Electronics Electrical Electrostatic discharge Electronics Occupational Personnel contact with sharp edges, pinch points, or rotating fixture ALL 8 Collision Structural failure or improper use of MGSE I&T 10 Electrical Power distribution system overload or short circuits I&T Electronics RAV*Hazards GroupHazardsSubsystem 10 All hazard identified in Preliminary Hazard Analysis apply to Operating and Support Hazard Analysis *The Risk Assessment Value (RAV) is derived from MIL-STD-882D, Standard Practices for System Safety. Risk Priority: Unacceptable Undesirable (Acceptable With Proper Controls) Operation Permissible