Quality Assurance and Risk Management Services, Inc. 

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

Process and Product Quality Assurance (PPQA)
Risk Management Introduction Risk Management Fundamentals
More than OH&S. Definitions of Risk Risk is virtually anything that threatens or limits the ability of a community or non-profit organisation to achieve.
Transition from Q1- 8th to Q1- 9th edition
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
More CMM Part Two : Details.
How ISO9001 Compares with CMM Mark C. Paulk JAN,1995 CMM version 1.1 ISO9001 July 1994 presented by Zhilan Zhou.
LATA Environmental Services of Kentucky, LLC Process for Approved Supplier Selection and Evaluation ASME NQA (and Addenda through 2007), Part I.
Responsible CarE® Process Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
ISO 9001 : 2000.
Module 3 UNIT I " Copyright 2002, Information Spectrum, Inc. All Rights Reserved." INTRODUCTION TO RCM RCM TERMINOLOGY AND CONCEPTS.
USING NASA QUALITY STANDARDS NASA Academy of Aerospace (AAQ) Quality Mini-Workshop Ken Crane Quality Engineering Technical Discipline Team Lead NASA SAFETY.
Overview of Key Rule Features
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
Slide 1 FAA’s Special Technical Audit of Boeing and the Audit Resolution Plan.
TEMPUS ME-TEMPUS-JPHES
Risk Analysis And New Innovations
RC14001 ® Update GPCA Responsible Care Committee September 23, 2013.
Pilot Risk-Ranking Model to Prioritize Manufacturing Sites for GMP Inspections Advisory Committee for Pharmaceutical Science Manufacturing Subcommittee.
TIWANA WALTON MENTOR: SHARON MONICA JONES High Level Aviation Safety Risk Assessment.
Presentation on Integrating Management Systems
4. Quality Management System (QMS)
May 4, Establish an Acquisition process that produces: Required, Affordable, Timely Products Big “A” Acquisition Resources Acquisition Requirements.
1 RPS Critical Planning Preparation & Delivery of Critical Parts Goodrich Aerostructures Group.
Risk Analysis for Engineering Design J. M. McCarthy Fall 2003 Definitions Hazard Analysis Hazard Analysis Report Example for Mini Baja Nationally Recognized.
INTEGRATION OF QA/ISM J. R. Yanek Chair, EFCOG ISM Working Group April 13, 2000.
As of: 07 Apr 051 Using MIL-STD-882D: Approach for Identification and Elimination of Environmental Hazards or Reduction of Risks Associated with Environmental.
Basics of OHSAS Occupational Health & Safety Management System
Top 10 Medical Device Citations
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
From Research Prototype to Production
Risk Management - the process of identifying and controlling hazards to protect the force.  It’s five steps represent a logical thought process from.
MATTHEW MATKOVICH MINE EQUIPMENT COMPLIANCE SPECIALIST QUALITY ASSURANCE & MATERIALS TESTING DIVISION MSHA – APPROVAL & CERTIFICATION CENTER 30CFR, PART.
Soft Tech Development Inc. 1 Software Project Tracking A CMM Level 2 Key Process Area Soft Tech Development Inc.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Managing Your Supply Chain for Food Safety in a Global Environment Dane Bernard Keystone Foods.
Slide 1V&V 10/2002 Software Quality Assurance Dr. Linda H. Rosenberg Assistant Director For Information Sciences Goddard Space Flight Center, NASA
Public Health Information System: Industry Session Establishment Profile  Policy  Features Demonstration ●
Hazards Identification and Risk Assessment
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
QUALITY MANAGEMENT STATEMENT
Rules for Supporting Part 803 and Part 806 Decision Making Page 1 Establishing Rules for: Medical Device Reports (803) & Correction and Removal Reports.
It was found in 1946 in Geneva, Switzerland. its main purpose is to promote the development of international standards to facilitate the exchange of goods.
Safety and Mission Assurance Directorate, Goddard Space Flight Center Supply Chain Management Panel Session: NASA Supplier Assessments: Processes, Results.
The Second Annual Medical Device Regulatory, Reimbursement and Compliance Congress Presented by J. Glenn George Thursday, March 29, 2007 Day II – Track.
Swedish Risk Management System Internal management and control Aiming to Transport Administration with reasonable certainty to.
Safety & Health Considerations in Accommodating Commercial Activties David Loyd, JSC Safety & Test Operations 2013 NASA Safety Directors & Occupational.
CATASTROPHIC (I) Loss of ability to accomplish the mission or mission failure. Death or permanent total disability (accident risk). Loss of major or mission-critical.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
OHSAS Occupational health and safety management system.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Storage, Labeling, Controlled Medications Guidance Training CFR § (b)(2)(3)(d)(e) F431.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,

UNDERSTANDING ISO 9001:2008.
Campus Wide Safety Committee Initial Meeting 11/9/16
People and Culture Office Safety, Health and Wellbeing
An Overview on Risk Management
Ensuring a safe workplace
Initial project results: Annex 6 – 20 Sept 2016
SYSTEM SAFETY AND THE TECHNICAL AUTHOR
Risk management - HIRAC awareness presentation
What are ISO 9000 Standards? ISO 9000 Standards
Air Carrier Continuing Analysis and Surveillance System (CASS)
Unit I Module 3 - RCM Terminology and Concepts
DOE Review of the LCLS Project 7-9 February 2006
EXPLOSIVES SAFETY SELF ASSESSMENT (ESSA) UNIT NAME
EXPLOSIVES SAFETY SELF ASSESSMENT (Division)
SELDOM (D) Remotely possible; could occur at some time
Presentation transcript:

Risk-Based Supplier Assurance A Missing Key To Enhanced Supplier Quality Program Success Quality Assurance and Risk Management Services, Inc.  Robert J. Navarro, President & CEO A.A. Flippen, Director, Systems Engineering University of Bradford, UK School of Engineering, Design & Technology Chakib Kara-Zaitri, PhD, Senior Lecturer in Risk & Reliability September 28, 2008

Presentation Objectives Quality & Risk Management Process Today Where We Want to Be How Do We Get There? Case Study Summary

Where We Are Today Quality Community Quality System Elements You Are Here Quality System Elements Management responsibility Purchasing / Supply chain management Product realization Control of non-conforming products Etc.

Where We Are Today Risk Management Community NPR 8000.4 Agency “They” Are There NPR 8000.4 Agency Risk Management Procedural Requirements Includes supply chain risk

Where We Want To Be Risk Management Community Supplier Quality Community Risk Management Community Integration of Quality and Risk Management Current focus of this initiative on supply chain QA management Supplier QA risks typically reported in supplier audit reports Transformation of quality audit deficiencies into a risk management framework Systematic reporting of supply chain risks as part of the program/project management councils (PMCs)

An Approach for Integration How Do We Get There? An Approach for Integration Program/Project risk management is governed by the NASA Risk Management Policy NPR 8000.4 Includes the Continuous Risk Management (CRM) Process The CRM process requires program/project risk management plans to provide definitions for likelihood and consequence ratings Apply these definitions to each supplier audit finding Map results in the traditional 5X5 Risk Reporting Matrix Report significant supply chain QA results as part of an integrated reporting process at program/project PMCs

Likelihood & Consequence 5X5 Matrix Case Study Likelihood & Consequence 5X5 Matrix Likely to Occur Probably May Occur Unlikely to Occur Improbable Likelihood Very Low Mod High Very Low High Consequence

Case Study, cont’d Definitions Likelihood Consequence A. Likely to occur (e.g., probability > 0.1) B. Probably will occur (e.g., 0.1 > probability > 0.01) C. May occur (e.g., 0.01 > probability > 0.001) D. Unlikely to occur (e.g., 0.001 > probability > 0.000001) E. Improbable (e.g., 0.000001 > probability) Consequence Very High -- A condition that may cause death or permanently disabling injury, facility destruction on the ground, or loss of crew, major systems failure, or vehicle during the mission High -- A condition that may cause severe injury or occupational illness, or major property damage to facilities, systems or major impact to project schedule Moderate -- A condition that may cause minor injury or occupational illness, or minor property damage to facilities, systems or minor impact to project schedule Low -- A condition that could cause the need for minor first aid treatment but would not adversely affect personal safety or health, damage to facilities, equipment, or flight hardware Very low -- Minimal or no consequences

Case Study, cont’d An audit was completed for Supplier A. Selected results: F1. Supplier A does not have a defined receiving inspection process to systematically: Verify the conformity of purchased products and services Provide a traceable record of conformity including who, when, how, and to what criteria, conformity was verified Project Risk Purchased products may not meet technical requirements, and may have no traceable record of conformity to requirements. Failures could occur downstream and result in costly delays. Consequence High - A condition that may cause severe injury or occupational illness, or major property damage to facilities or systems or major impact to project schedule Likelihood C - May occur

Supplier “A” Risk Report Case Study, cont’d Transformed Supplier Risk Supplier “A” Risk Report Likely to Occur Probably May Occur Unlikely to Occur Improbable F1 Likelihood Very Low Mod High Very Low High Consequence

Case Study, cont’d F2. While performance history is cited as a basis for approving suppliers, there appears to be no defined process for reporting supplier deficiencies that could affect supplier approval status. Project Risk Repeat problems with subcontracted and/or purchased products. Initial supplier deficiencies may not be recorded and/or addressed with appropriate controls. Consequence Moderate - A condition that may cause minor injury or occupational illness, or minor property damage to facilities, systems or minor impact to project schedule. Likelihood C - May occur

Supplier “A” Risk Report Case Study, cont’d Transformed Supplier Risk Supplier “A” Risk Report Likely to Occur Probably May Occur Unlikely to Occur Improbable F2 F1 Likelihood Very Low Mod High Very Low High Consequence

Case Study, cont’d F3. It appears that there is no defined process for reviewing controlled documents to determine whether updating is needed. Project Risk Incorrect builds, tests and inspections could occur due to use of outdated material and process specs, and manufacturing and QA work instructions.   Consequence High - A condition that may cause severe injury or occupational illness, or major property damage to facilities, systems or major impact to project schedule Likelihood B - Probably will occur

Supplier “A” Risk Report Case Study, cont’d Transformed Supplier Risk Supplier “A” Risk Report Likely to Occur Probably May Occur Unlikely to Occur Improbable F3 F2 F1 Likelihood Very Low Mod High Very Low High Consequence

Summary Supplier risks can and should be integrated into the NASA risk management program defined in NPR 8000.4 (new revision in NODIS review) A systematic and practical risk-based supplier QA process can be applied Integrated quality and risk management Supply chain risks are a critical element of the integrated project risk profile Next steps Field testing for practicality Program and project feedback

Where We Want To Be Contact Risk Management Community Supplier Quality Contact RNavarro@QAandRM.com Chakib@NTLworld.com