ILC GDE - ILCDR08 Cornell 8-11 July 2008 Electron Cloud Mitigation R&D at SLAC M. Pivi, D. Arnett, G. Collet, T. Markiewicz, D. Kharakh, R. Kirby, J. Seeman,

Slides:



Advertisements
Similar presentations
KEK Update on the status of the electron cloud studies at KEKB Contents Brief review of our studies Updates Clearing electrode Groove structure SEY measurement.
Advertisements

Upgrade Plan of KEKB Vacuum system Pre-kickoff KEK1 Y. Suetsugu KEKB Vacuum Group Contents Challenges for vacuum system Designs for.
Study of a Clearing Electrode at KEKB - First beam test - Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2008/3/3-61TLC08 Sendai.
9-12 April 2007 International Linear Collider DR electron cloud R&D effort: Clearing electrode and triangular fin M. Pivi T. Raubenheimer, J. Seeman, T.
KEK Recent results of beam tests on clearing electrode and grooves 2010/1/191ILC DR WebEx Meeting Y. Suetsugu, KEK.
Quick Review of Secondary Electron Yield Studies to Mitigate Electron Cloud Effect in Accelerator F. Le Pimpec (PSI) R. Kirby, F. King, M. Pivi (SLAC)
Review of Electron Cloud R&D at KEKB 1.Diagnostics 1.Beam Size Blow-up 2.Beam Instabilities 3.Electron Density 4.SEY (Secondary Electron Yield) 2.Mitigation.
2006/09/25-28 ILCDR06, Cornell University 1 Experimental Study on Suppression of Electron Cloud Effect at the KEKB Positron Ring Contents Introduction.
How e-cloud effect affects the ILC DR Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
9-12 April 2007 International Linear Collider DR electron cloud R&D effort 1 st part: Tests in PEP-II M. Pivi L. Wang, D. Arnett, G. Collet, R. Kirby,
Latest ILC DR wiggler simulations M. Pivi, T. Raubenheimer, L. Wang (SLAC) July, 2005.
Global design effort 2008 DOE/NSF review June 30, 2008 Global design effort Americas Slide 1 CesrTA Status and Planning for FY08-09 David Rubin Mark Palmer.
45 th ICFA Beam Dynamic Workshop June 8–12, 2009, Cornell University, Ithaca New York Modeling Cyclotron Resonances in ECLOUD Jim Crittenden Cornell Laboratory.
49th ICFA Advanced Beam Dynamics Workshop October 8 –12, 2010 LEPP, the Cornell University Laboratory for Elementary-Particle Physics, has joined with.
26-28 August 2008 Final EUROTeV Scientific Workshop, Uppsala University, Sweden 1 ILC DR vacuum system related problems and solutions Oleg B. Malyshev.
ILC Damping Ring update on collective effect electron cloud R&D Mauro Pivi SLAC ILCDR06 Cornell Workshop September 26-28, 2006.
18-20/12/2007 ILC Damping Ring R&D Mini-workshop, KEK, Japan Vacuum Design vs. e-cloud Oleg B. Malyshev ASTeC Daresbury Laboratory.
Electron Clouds at SLAC Johnny Ng ILC Damping Rings Collaboration Meeting March 4, 2009.
Webex Electron Cloud Evaluations for ILC DR Mauro Pivi on behalf of the ILC Electron Cloud Working Group - by Webex - KILC12 – Daegu Korea April 25, 2012.
Updates of Electron Cloud Studies at KEKB Topics in 2008 Measurement of electron density in solenoid and Q field Mitigation using clearing electrode in.
30 May – 2 June, 2007 ILC 2007 DESY, Germany ILC R&D plan WP 2.2.3: Electron cloud M. Pivi -SLAC ILC 2007 Hamburg, Germany.
ILC damping ring Workshop, Dec 19, 2007, KEK, L. WANG Ecloud simulation 2007 ILC Damping Rings Mini-Workshop December, 2007 Lanfa Wang, SLAC.
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
ILC08 Chicago November 2008 Summary of Recent Results from SLAC M. Pivi, J. Ng, D. Arnett, G. Collet, T. Markiewicz, D. Kharakh, R. Kirby, F. Cooper,
Electron cloud in the wigglers of ILC Damping Rings L. Wang SLAC ILC Damping Rings R&D Workshop - ILCDR06 September 26-28, 2006 Cornell University.
CesrTA EC Build-Up and Mitigation Program - Introduction Mark Palmer June 25, 2009.
ILC Damping Ring Collective Instability update: Electron Cloud Mauro Pivi SLAC ILC Vancouver Meeting July 19-22, 2006.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
June 13, 2007 Global Design Effort 1 ILC Effort at SLAC RDR > EDR Nan Phinney SLAC/GDE.
October 13,2010 WG Meeting Cornell U. Recommendation for Electron Cloud Mitigations in the ILC Damping Ring ILC DR Working Group October 13, 2010 Cornell.
2008/7/281 ILCDR08 Report - Electron Cloud Session – Univ. Y. Suetsugu, KEK.
Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.
Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.
ILC DR Workshop - KEK December, A new resonance in wiggler simulations: Christine Celata Use POSINST code.
GDE, 26 Oct 2007, FNAL Global Design Effort 1 Damping Rings Area System Summary Andy Wolski.
Motivation and Overview David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
C ESR TA Status Report July 22, 2010 Mark Palmer for the C ESR TA Collaboration.
Recent Electron-Cloud Mitigation Studies at KEK E-cloud mitigation mini-workshop on November at CERN Kyo Shibata (for KEKB Group)
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill.
CesrTA Vacuum System Conversion and Operational Experiences Yulin Li for the CesrTA Team Cornell Laboratory for Accelerator-based ScienceS and Education.
AEC09, CERN Mauro Pivi, SLAC TiN chambers and SEY measurements in PEP-II M. Pivi J. Ng, T. Markiewicz, D. Kharakh, R. Kirby, F. Cooper, C. Spencer, B.
Electron cloud measurement in Cu/Al chambers with/without TiN coating at KEKB positron ring ILC DR Working Group Meeting Kyo Shibata (KEK)
Electron Cloud R&D at SLAC Johnny Ng SLAC DOE HEP Review July 7 – 9, 2008.
Electron Cloud Issues for the 3.2km Positron Damping Ring Mark Palmer (Cornell University) GDE January 18, 2011 ILC Baseline Assessment Workshop 2 SLAC.
E-cloud Remedies and PS2 vacuum design J.M. Jimenez AT Department – Vacuum Group CARE-HHH-APD BEAM’07 Thursday 04 October Session 2: PS2 E-cloud.
WebEx meeting November 17, 2009 ILC Damping Ring Working Group on Electron Cloud LC e- cloud Working Group November 17, 2009.
2nd International Particle Accelerator Conference September 4–9, 2011, San Sebastián, Spain LEPP, the Cornell University Laboratory for Elementary-Particle.
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008) First Intnl. Teleconference Ecloud, Impedance/Instabilities - M. Pivi, SLAC 31 October.
Updates of EC Studies at KEKB 1.EC studies at KEKB 2.Recent results 1.Clearing Electrode 2.Groove surface 3.TiN coating 4.Measurement of EC in solenoid.
3 February 2010 ILC Damping Ring electron cloud WG effort Mauro Pivi SLAC on behalf of ILC DR working group on e- cloud ILC DR Webex Meeting Jan 3, 2010.
Recent ECLOUD07 Workshop in Daegu, S. Korea (~50 participants) –Highlights: Measurements of the surface Secondary Electron Yield (SEY) of samples inserted.
ECLOUD’12 (the 5 th electron-cloud workshop) Kyo Shibata (on behalf of KEKB Vacuum Group) SuperKEKB Vacuum System KEK Tsukuba site SuperKEKB Linac.
Electron Cloud in the International Linear Collider ILC Mauro Pivi work performed while at SLAC and the ILC Damping Ring Working Group High.
2007/03/1-2 ECL2, CERN 1 SEY and Clearing Studies at KEKB Contents Contents Introduction Studies Beam duct with Ante-chambers Coatings with Low SEY Clearing.
Recent Studies on Electron Cloud at KEKB 1.EC studies at KEKB 2.Recent results –Clearing Electrode –Groove surface –EC measurement in Q and solenoid field.
PEP-II test chambers installation
Experiments on Fast Ion Instability at PLS
International Linear Collider R&D on electron cloud (SLAC)
Groove Mitigation and Plans
Electron Cloud Effects in SuperB
Electron Cloud R&D for Future Linear Colliders
Impedance & SEY of grooved surface
RECENT DEVELOPMENTS IN MODELING
Why Study Electron Clouds? Methods and Tools to Study Electron Clouds
J.A.Crittenden, Y.Li, X.Liu, M.A.Palmer, J.P.Sikora (Cornell)
Work In January 2007, we installed 5 chambers in a straight Field Free region of PEP-II Low Energy Ring (LER). Closest bend at ~18 meters upstream: 1 stainless.
Impedance of grooved surface
Electron Clouds at SLAC
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008)
Presentation transcript:

ILC GDE - ILCDR08 Cornell 8-11 July 2008 Electron Cloud Mitigation R&D at SLAC M. Pivi, D. Arnett, G. Collet, T. Markiewicz, D. Kharakh, R. Kirby, J. Seeman, L. Wang, T. Raubenheimer (SLAC) ILC Damping Ring - ILCDR08 Cornell University 8 to 11 July 2008

ILC GDE - ILCDR08 Cornell 8-11 July 2008 Simulations indicate that a secondary electron yield of ~1.2 results in a cloud density close to the instability threshold. The aim of experimental studies is to obtain a surface secondary electron yield of 1.1. Simulations indicate that techniques as grooves in the chamber walls or clearing electrodes, besides coating, will be effective at suppressing the development of an electron cloud. Work done for the ILC Reference Design Report RDR

ILC GDE - ILCDR08 Cornell 8-11 July 2008 R&D Goals: –Reduce the SEY below instability threshold. SEY ≤ 1.1. Surface Approach: –Coatings –Conditioning –Grooved surfaces –Clearing electrodes (KEK) Experiments in PEP-II: –Conditioning –Grooved chambers –Conditioning and grooved chambers in magnetic field regions Electron Cloud and SEY R&D Program

ILC GDE - ILCDR08 Cornell 8-11 July 2008 R&D work at SLAC on mitigation techniques Installed 6 chambers in PEP-II straight: –“ECLOUD1”: to monitor the reduction in-situ of the SEY due to conditioning –“ECLOUD2”: to test Groove chambers –ECLOUD3”: new Chicane to test in magnetic field chambers: Aluminum TiN coating Groove chamber (not installed) Non-evaporable getter NEG coating chamber (not installed) stopped due to FY08 budget

ILC GDE - ILCDR08 Cornell 8-11 July 2008 ECLOUD1: SEY station 1.5% of the ring Electron cloud chambers installed in PEP-II ILC tests - SLAC ECLOUD2: grooves tests ECLOUD3: Al uncoated and TiN-coated chamber in chicane

ILC GDE - ILCDR08 Cornell 8-11 July 2008 “ECLOUD1” SEY test station in PEP-II Transfer system at 0 o PEP-II LER e+  Transfer system at 45 o 2 samples facing beam pipe are irradiated by SR Isolation valves ILC tests, M. Pivi et al. – SLAC

ILC GDE - ILCDR08 Cornell 8-11 July 2008 Results of Conditioning in PEP-II LER beam line Tin samples measured before and after 2-months conditioning in the beam line. Samples inserted respectively in the plane of the synchrotron radiation fan (0 o position) and out (45 o ). ILC tests, M. Pivi et al. – SLAC Before installation in beam line After conditioning e- dose > 40mC/mm**2 Similar SEY measured in situ at KEKB by S. Kato et al.

ILC GDE - ILCDR08 Cornell 8-11 July 2008 sample surface exposed to SR PEP-II LER side SEY TESTS TiN and NEG Expose samples to PEP-II LER synchrotron radiation and electron conditioning. Then, measure Secondary Electron Yield (SEY) in laboratory. Samples transferred under vacuum. Complementary to CERN and KEK studies 20 mm

ILC GDE - ILCDR08 Cornell 8-11 July 2008 LER#1 XPS Before installationXPS After exposure in PEP-II LER for 2 months (e dose 40mC/mm^2) Carbon (and oxygen) contents are strongly reduced after exposition to PEP-II radiation and electron environment. Contrary to electron (only) conditioning performed at many laboratories which shows carbon increase on surface. Surface analysis: Carbon content decrease X-ray Photon Spectroscopy. ILC tests, M. Pivi et al. – SLAC

ILC GDE - ILCDR08 Cornell 8-11 July 2008 Effect of recontamination in vacuum: SEY < 1 (!) for TiN sample in stand-by in vacuum after the conditioning period in PEP-II LER. In vacuum pressure typical of an accelerator environment: 1.0e-9 torr, 10:1 H2:CO. SEY recontamination after long term exposure in vacuum environment

ILC GDE - ILCDR08 Cornell 8-11 July 2008 Activated-NEG conditioning in PEP-II beam line R. Kirby, M. Pivi, ILC tests – SLAC NEG as received After beam conditioning March 2008 After NEG heating Caution: although we took best precautions, the vacuum ~1e-7 Torr environment during sample transferring for measurements, may not have been perfectly free from CO CO2 contaminantion. TiZrV Non-Evaporable Getter NEG coating. Activation = 2h at 200degC.

ILC GDE - ILCDR08 Cornell 8-11 July 2008 ECLOUD1: Uncoated aluminum in PEP-II … Daphne and CesrTA have most of chambers in aluminum M. Pivi, R. Kirby – SLAC SEY remain > 2 after conditioning in beam line.

ILC GDE - ILCDR08 Cornell 8-11 July 2008 ECLOUD1: Summary Goal: monitor the reduction in-situ of the SEY due to conditioning Results: –TiN coating: SEY reduced to 1000 h) recontamination exposure to H and CO under vacuum. –Uncoated aluminum: SEY > 2 with/without conditioning.

ILC GDE - ILCDR08 Cornell 8-11 July 2008 ECLOUD1: Summary –Other findings: Activated NEG coating: SEY ~ 1.1 Copper: SEY reduced to < 1.2 Stainless steel: SEY reduced to < 1.2, but increased to 1.5 after recontamination exposure in vacuum References: –M. Pivi et al. MOPP064 EPAC 2008; –paper being prepared for submission to Physical Review ST AB –F. Le Pimpec et al. Nucl. Inst. and Meth., A564 (2006) 44; –F. Le Pimpec et al. Nucl. Inst. and Meth., A551 (2005) 187;

ILC GDE - ILCDR08 Cornell 8-11 July 2008 SEY before installation SEY after conditioning TiN/Al TiZrV Al StSt Cu Summary ECLOUD1 experiment Summary of samples conditioned in the accelerator beam line

ILC GDE - ILCDR08 Cornell 8-11 July 2008 Rectangular Grooves to Reduce SEY Schematic of rectangular grooves Without B field Rectangular grooves can reduce the SEY without generating geometric wakefields. The resistive wall impedance is roughly increased by the ratio to tip to floor. Schematic of rectangular grooves With B field

ILC GDE - ILCDR08 Cornell 8-11 July 2008 Special surface profile design, Cu OFHC. EDM wire cutting. Groove: 0.8mm depth, 0.35mm step, 0.05mm thickness. 1 mm Rectangular (!) groove Laboratory measurements SLAC M.P. and G. Stupakov, SLAC Artificially increasing surface roughness. Measured SEY reduction < 0.8. More reduction depending geometry. Measured SEY reduction < 0.8. More reduction depending geometry. 5mm depth (PEP-II) Same SEY results 5mm depth (PEP-II) Same SEY results Ref: A. Krasnov LHC-Proj-Rep-617

ILC GDE - ILCDR08 Cornell 8-11 July 2008 ECLOUD2: Design - Fin Extrusions - SLAC FIN TIPS= I.D. OF CHAM FAN HITS HERE FIRST LIGHT PASSES THRU SLOTS BETW FINS BECAUSE FAN IS “THICKER” THAN FIN FAN EVENTUALLY HITS “BOTTOM” OF SLOT FOR FULL SR STRIKE VIEW IS ROTATED 90 CCW FROM ACTUAL FAN ORIENTATION Goal: build Rectangular Groove (Fin) chambers by Al extrusion, TiN coat and install in Straight Section PEP-II LER for tests

ECLOUD2 – Grooved Chambers in PEP-II Standard (flat) chambers also installed as reference. All aluminum with TiN coating installed in straight sections. Rectangular groove (or “fin”) chambers fabricated by extrusion. e+ Grooved chamber Flat chamber Electron detectors

ECLOUD2 – Grooved Chambers Performance M. Pivi et al, SLAC Electron cloud signal in two smooth (flat) TiN-chambers and two grooved TiN-chambers installed in PEP-II. Electron cloud signal in stainless steel chamber.

ECLOUD2 – Summary *Goal: Measure performance of electron cloud suppression using grooved chambers *Electron cloud signal is ~ factor of 20 smaller in grooved TiN chambers compared to flat TiN chambers *Confirmed reduced electron cloud build-up in TiN coated chambers compared with uncoated stainless steel chambers. *References: –M. Pivi et al. MOPP064 EPAC 2008 –paper being prepared for submission to Phys. Rev. Lett.

Additional Plans: Grooved chamber for Cesr-TA *Grooved chamber for dipole: Chamber fabricated, needs assembly and TiN coating (originally built for ELCOUD3, but was not installed due to budget cuts.) Morrison, Pivi, Wang, SLAC

2mm Aluminum+coating triangular grooves (pictures above), manufactured by SLAC. Extrusion manufacturing limited by the groove sharpness requirements. 1mm depth stainlees steel grooved insertion under development: CERN/SLAC Lanfa Wang, SLAC Tip Valley Aluminum triangular groove, SLAC. Depth 1.9mm, Opening angle 20 o, radius top 95um, radius valley 144um Mauro Pivi - SLAC April 2008 Tip Additional Plans: Grooved chamber for CERN SPS

Additional Plans *KEK-B: –Provide groove insertions for experiment at KEK-B –Compare grooved and flat TiN coated surfaces, and clearing electrodes  see Suetsugu-san next presentation. *CesrTA: –Redeploy all experiments ECLOUD1,2,3 (plus grooved chamber in dipole). *Project-X: –Re-deploy ECLOUD1 (SEY Station) to Fermilab (after CesrTA)

Summary *A successful R&D program on electron cloud has been carried out at SLAC. *TiN coating has been demonstrated to have an SEY reliably below the instability threshold. Work continues to address a few remaining issues. *Requirements at future colliders - 2 picometer emittance in the ILC DR - are challenging. *Key collaboration with other labs to develop complementary mitigation techniques.