1 CNGS Electrical Services (PBS 5.5) S. AKHTAR - ST/EL.

Slides:



Advertisements
Similar presentations
General Infrastructures Services Department LIU-SPS external beam dump - Internal Review Civil Engineering Aspect for Option B (LSS4) 30/7/2014 Martin.
Advertisements

Study report on the TDC2/TCC2 Cabling and Low Voltage activities Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting
How to Perform Preventive Maintenance of the Personal Computer Properly Shut Down of the Computer Properly Shut Down of the Computer Unplug all Connection.
CERN TS Department / Civil Engineering Group 8 February 2008 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC/ILC Collaboration Meeting 8 Feb 2008.
SPL Integration Layout Impact on cryo and vacuum sectorisation ◊ Underground obstacles, constraints on slope and length of the SPL ◊ Continuous cryostat.
1 The CNGS Reflector Water distribution system Outer conductor Inner conductor Drain connections  5 Drain tube Support and alignment frame Transport chassis.
Monitoring Vibration on Tunnel Fans Safety First The worlds developing infrastructure creates many technical challenges for engineering and construction.
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
13 March MERcury Intense Target (MERIT) Experiment Layout A.Fabich for CERN AB-ATB.
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
CONVENTIONAL ELECTRICAL TDR DESIGN Randy Wielgos March 22, 2012 ILC CFS Baseline Technical Review.
John Osborne GS/SE March 2013
Jean-Claude Guillaume ATOP Days – CERN, 5 March 2009 Review of irradiated cables in the SPS Part I – Present strategy Jean-Claude Guillaume Cables and.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
Conventional Facilities and Siting Global Design Effort Safety Requirements for IR Conventional Facilities and Siting Group Safety Requirements for IR.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Health and Safety Executive Health and Safety Executive Electrical Engineering HSE Perspective John Madden CEng FIET Principal Electrical Inspector Team.
CFD team supports CERN development 19 May M.Battistin CERN May 19 th 2011 C omputational F luid D ynamics team C omputational F luid D ynamics team.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
CLIC CES Webex 12 Nov Summary: – Set of fire safety measures defined in CERN Safety Report – Proposed Structure for CLIC/ILC Fire Safety Report Fabio.
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
The CNGS Horns Electrical Systems The CNGS Horns Electrical Systems 4th workshop on Neutrino Beams and Instrumentation 7 – 11 November 2003 at KEK Gilles.Maire.
Vacuum system.
J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D. J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D SAFETY J.Pothier (GLIMOS) C.Schäfer (deputy GLIMOS) DISMANTLING.
Integration of the Experimental Facility in West Area & CNGS 1Ans Pardons, 18/10/2012 Integration of experimental facility in West Area and CNGS With input.
Safe-Room Status Intermediate ‘Conclusions’ M. Brugger (based on HSE discussion)
CLIC CES Meeting 14 jan 2009 A resume table for fire safety in LHC, and a possible scheme for other machine – part 1 CERN –SC Fabio Corsanego.
Conventional Facilities and Siting 1 Alternate Site and Tunnel Configuration Status Report KEK (2) Nov. 2008, Chicago Global Design Effort Masami Tanaka.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
Electrical Discharge Circuit for CNGS Horn & Reflector PH/DT1 Group Meeting, 23 October 2007 Gilles MAIRE PH/DT1-IC Section Leader.
Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson 17 September 2015.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
Civil Engineering and Services - drawings for CDR - CDR chapter J.Osborne and M.Gastal for CES WG 1.
CNGS PROJECT STATUS D.Autiero 21/5/2003 General status 2003 Project review CNGS upgrade.
ALICE-TRD gas system 1/4/2015R. Guida PH-DT-DI1. TRD gas system Few numbers:  Total number of modules/racks: 20 (max leak rate certified at construction.
EUROn Safety 13/06/2012M. Dracos1. Safety workshop 13/06/2012M. Dracos2 A first two days safety workshop has been organized at CERN last May (
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
March 22,  Overview of Asian Civil Design  Previous Case Study  Feature of Beam Tunnel  Tunnel Typical Cross Section  Beam Tunnel.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
Extraction and beamline progress B.Goddard TE/ABT.
WORK EDUCATION PROJECT TOPIC:- SYMBOLIC REPRESNTATION SUBMITTED BY:- JYOTISHMAN PUZARI SUBMITTED TO:- SANJAY SRIVASTAVA SIR.
SUBMMITED BY : MOUTRISHNA GAYAN CLASS : VII ROLL. no : 9.
18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 1 Power Converters for Magnets –Introduction –Specification Magnet characteristics.
KEK, 04/28/061 Safety Plan Assumptions Break out of fire in the Beam Tunnel is negligible Cables in the Service Tunnel is main fire load They are combustible.
50% LBNE Concept Design WCD Infrastructure. Mechanical.
LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team1 Experimental Area Latest News from IP8  Radiation Shield – Upper & Front Parts  Structures.
S UPER B site status report S. Tomassini INFN-LNF On behalf of SuperB Collaboration SuperB general meeting– Frascati – December 1-5, 2009.
ESS Grounding System Concept Fundamentals and Requirements
Design considerations for the FCC electrical network architecture FCC week 2016, Rome, April 2016 Davide Bozzini - CERN/EN/EL With the contribution.
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
DCal-ALICE integration and installation plan and status A. Tauro.
Linac 4 SPL tunnel Material access and services shaft Personnel and material access shaft Klystron gallery Emergency exit shaft Transfert line to PS2 Personnel.
Supply and Distribution of Electrical Energy
MEDICIS Safety Alarms Systems
Energy How to use Safety Diagnosis Bilingual
VENTILATION OF AD TARGET Kick off meeting
News from Integration WG
Budget specification EHN1 Extension: Infrastructure (WG2)
FCC Tunnel and Shaft Cross Sections
Electrical and electronic systems projects
Extension SR1 WP3 Electrical installations
Business opportunities related to CERN electrical network
Reader Swap out Guide.
ILO Industrial Opportunities Days, 6-7 June 2019
Presentation transcript:

1 CNGS Electrical Services (PBS 5.5) S. AKHTAR - ST/EL

2 AGENDA 1.ITEMS WHICH MAKE UP GENERAL SERVICES (UNDERGROUND) 2.CABLE TRAYS AND SUPPORTS 3.LV SWITCHGEAR 4.GENERAL SERVICES BUDGET (UNDERGROUND) 5.POWERING OF COOLING AND VENTILATION 6.BB4 ANNEX ELECTRICAL SERVICES (HORN & REFLECTOR) 7.TEMPORARY LIGHTING DURING INSTALLATION PHASE 8.SAFETY ASPECTS 9.CURRENT STATUS

3 1. GENERAL SERVICES UNDERGROUND NORMAL LIGHTING SECURE (SAFETY) LIGHTING EXIT LIGHTING THREE PHASE AND SINGLE PHASE SOCKETS (NORMAL & SECURE) SUPPLY FOR POWER RAIL EMERGENCY STOP SUPPLY FOR EVACUATION SYSTEM LV SUPPLY FOR VARIOUS MACHINE PUMPS AND CONTROL UNITS LV SUPPLY FOR GSM REPEATERS EARTHING CABLE TRAY WORK

4

5

6

7 GENERAL SERVICES

8 5. POWERING OF COOLING AND VENTILATION SURFACE

9 POWERING OF COOLING AND VENTILATION

10

11

12 BB4 ANNEXE

13 Estimate for the temporary lighting and the powering of temporary ventilation fans. TT41 - No temporary lighting required. Although some mobile lighting will be required to fix the permanent lights. Cost = 2KCHF 7. TEMPORARY LIGHTING

14 TAG41 & TAG42 - Total length of the two tunnels is 891 m long. If we install a light every 10 m, we will require 90 lights. Cabling and cost of light fittings and fixing = 22.5KCHF Ventilation chamber, junction chamber, service gallery, target chamber and 7 cross passages amount to 425 m in length. We require 43 lights. Cost of cabling, light fittings and fixing = 9.2KCHF TEMPORARY LIGHTING

15 Decay tunnel (TND4) - Special lighting, must be easily removable, for the 1km Decay tunnel. We require 100 lights. Cost of cabling + connectors, light fittings and fixing = 23KCHF From the TI8 side - TZ80, TZ81, TZ82, TNM41 and TNM42 all amount to 330m. Here we will require 33 lights. ***Assuming the general services power point at UJ87 will exist*** Cabling and cost of light fittings and fixing = 11.7KCHF Total cost for the lights including dismanteling is : 72KCHF Powering of ventilation fans The two fans in SUI8 = 2.5KCHF The two fans in TI8 connecting galleries = 6KCHF The small fan in the service gallery = 1.5KCHF ***Assuming the general services power point at UJ87 will exist*** Total for ventilation 10KCHF.

16 8. SAFETY ASPECTS

17

18 SAFETY ASPECTS

19 9. CURRENT STATUS SOME AREAS CABLE TRAY WORK IS IN PROGRESS - COMMITTED EQUIPMENT WHICH CAN BE RECUPERATED IS IDENTIFIED, MAINLY LV SWITCHBOARDS AND CABLE TRAYS AREAS WHERE A COMMON METAL SUPPORT CAN BE USED HAVE BEEN IDENTIFIED, MAINLY TA41 INITIAL STUDY WORK IS COMPLETED NOTHING ELSE COMMITED BUT THE HV/LV INSTALLATIONS ARE FORESEEN FOR TI8 IN MARCH 2003

20 Access tunnel TAG41 (COMMON SUPPORT)