An Inquiry into ERP systems from an ”activity” perspective Lars Taxén.

Slides:



Advertisements
Similar presentations
Ensure Vendor/Engineer of Choice Product Quality
Advertisements

Some questions o What are the appropriate control philosophies for Complex Manufacturing systems? Why????Holonic Manufacturing system o Is Object -Oriented.
Software Modeling SWE5441 Lecture 3 Eng. Mohammed Timraz
MNC Management PRESENTATION TASKS. Multinational Management Session 2Strategic Management & Structure Group presentations: GROUP 1. Based on Akoorie and.
ITIL: Service Transition
Sixth Hour Lecture 10:30 – 11:20 am, September 9 Framework for a Software Management Process – Artifacts of the Process (Part II, Chapter 6 of Royce’ book)
L4-1-S1 UML Overview © M.E. Fayad SJSU -- CmpE Software Architectures Dr. M.E. Fayad, Professor Computer Engineering Department, Room #283I.
1 Samples The following slides are provided as samples and references for the Quarterly Reviews Additional slides will be added.
University of Southern California Enterprise Wide Information Systems Functionality and the Reference Model Instructor: Richard W. Vawter.
The Use of Zachman Framework Primitives for Enterprise Modeling
1 Pertemuan 25 Packaged Solution for E-Business Matakuliah: M0284/Teknologi & Infrastruktur E-Business Tahun: 2005 Versi: >
Iterative development and The Unified process
System Engineering Instructor: Dr. Jerry Gao. System Engineering Jerry Gao, Ph.D. Jan System Engineering Hierarchy - System Modeling - Information.
The Software Product Life Cycle. Views of the Software Product Life Cycle  Management  Software engineering  Engineering design  Architectural design.
Systems Development (SD) Presentation Michael Webb IT Director for Medicaid Utah Department of Health UDOH Informatics Brownbag August.
Mitun PatelMXP07U. Organisational structure Top management; this includes the organisation’s general manager and its executives Department managers; this.
VENDORS, CONSULTANTS AND USERS
Enterprise Architecture
Release & Deployment ITIL Version 3
MARKETING INFORMATION SYSTEMS: PART 5 COURSE CODE: PV250 DALIA KRIKSCIUNIENE, PHD FACULTY OF INFORMATICS, LASARIS LAB., AUTUMN, 2013.
INTEGRATION OF E - BUSINESS WITH ERP SYSTEM P RESENTATION ON INTEGRATION OF E - BUSINESS WITH ERP SYSTEM Presenting by Presenting by, Shruti raj Anushree.
EMarketPlace: Advanced Service Delivery Solutions Stephanie Woolson Lockheed Martin.
DYNAMICS CRM AS AN xRM DEVELOPMENT PLATFORM Jim Novak Solution Architect Celedon Partners, LLC
ASQ Milwaukee Section 1202 May 21, 2012
Web Development Process Description
SYS364 Evaluating Alternatives. Objectives of the Systems Analysis Phase determine, analyze, organize and document the requirements of a new information.
RUP Fundamentals - Instructor Notes
David Chen IMS-LAPS University Bordeaux 1, France
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
ACTIVITY THEORY AND HUMAN-COMPUTER INTERACTION Simon Tan CS 260, Spring 2009.
ETICS2 All Hands Meeting VEGA GmbH INFSOM-RI Uwe Mueller-Wilm Palermo, Oct ETICS Service Management Framework Business Objectives and “Best.
Industry specific cover image Oracle | Agile PLM Implementation Best Practices Guillaume Vives, Sr. Practice Director Agile National Practice, Oracle consulting.
Role-Based Guide to the RUP Architect. 2 Mission of an Architect A software architect leads and coordinates technical activities and artifacts throughout.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
1-1 System Development Process System development process – a set of activities, methods, best practices, deliverables, and automated tools that stakeholders.
CHECKPOINTS OF THE PROCESS Three sequences of project checkpoints are used to synchronize stakeholder expectations throughout the lifecycle: 1)Major milestones,
© 2012 xtUML.org Bill Chown – Mentor Graphics Model Driven Engineering.
Accounting Information System By Rizwan Waheed M.Com 710.
Notes of Rational Related cyt. 2 Outline 3 Capturing business requirements using use cases Practical principles  Find the right boundaries for your.
Software Engineering Prof. Ing. Ivo Vondrak, CSc. Dept. of Computer Science Technical University of Ostrava
Unified Modeling Language* Keng Siau University of Nebraska-Lincoln *Adapted from “Software Architecture and the UML” by Grady Booch.
L6-S1 UML Overview 2003 SJSU -- CmpE Advanced Object-Oriented Analysis & Design Dr. M.E. Fayad, Professor Computer Engineering Department, Room #283I College.
VENDORS, CONSULTANTS AND USERS. WHY CAN’T COMPANIES DEVELOP THEIR OWN ERP PACKAGES? To develop an ERP package is a complex & time consuming activity which.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
ERP Implementation Fundamentals Richard Byrom Oracle Consultant, Speaker and Author
Presented To: Dr. Dina Rateb MOIS 549 Class Presented By: Karim Aguib.
Software innovation theoretical model. the model: outputs (outcomes) product/service innovation process innovation factors (drivers) outputs (outcomes)
Independent Insight for Service Oriented Practice Summary: Service Reference Architecture and Planning David Sprott.
Workforce Scheduling Release 5.0 for Windows Implementation Overview OWS Development Team.
SAM for SQL Workloads Presenter Name.
Introduction Complex and large SW. SW crises Expensive HW. Custom SW. Batch execution Structured programming Product SW.
Defining Action Research Action Research aims to address organizational problems while at the same time contributing to scholarly knowledge. 1. the Principle.
Introduction to ITIL and ITIS. CONFIDENTIAL Agenda ITIL Introduction  What is ITIL?  ITIL History  ITIL Phases  ITIL Certification Introduction to.
TECHNICAL WRITING 2013 UNIT 3: DESIGNING FOR CHANGE.
Lars Taxén – Activity Modalities An action perspective based on innate coordination capacities Lars Taxén, Linköping University
1 Adaptive Case Management from the Activity Modality Perspective Lars Taxén Linköping University
Enterprise Architectures. Core Concepts Key Learning Points: This chapter will help you to answer the following questions: What are the ADM phase names.
Knowledge Integration – Balancing Between Anarchy and Despotism Joakim Lilliesköld The Royal Institute of Technology Lars Taxén Linköping.
1 An Investigation of Model Quality from the Activity Modality Perspective Lars Taxén Linköping University.
An Inquiry into Knowledge Integration and Innovation Management from an ”Activity Domain” perspective Lars Taxén.
Overview of SAP Application Services By Accely. Introduction Developed organizations in any business industry will invest in SAP programs to offer progressive.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
The Activity Domain - A New Paradigm for Enterprise Architectures Lars Taxén Linköping University
Chapter 1 Market-Oriented Perspectives Underlie Successful Corporate, Business, and Marketing Strategies.
ITIL: Service Transition
Peter Olow Knowit TM On the Integration of System Anatomy, System Architecture and Project Management Peter Olow Knowit TM
Toward a Theory of System Fielding
Distribution and components
Enterprise Architecture Week 4
The Requirement Continuum
Presentation transcript:

An Inquiry into ERP systems from an ”activity” perspective Lars Taxén

[There is a] need to research the design, implementation, use and evaluation of ES [Enterprise Systems] … within and across contexts so that we can examine the ways that such systems shape and are shaped by individual and group interests (Howcroft et al., 2004, pp ) Point of departure - context “activity” (Leont’ev, 1981) – Activity Theory “social world” (Strauss, 1985) “communities of practice” (Lave & Wegner, 1991) “thought world” (Dougherty, 1992) “knowledge domain” (Boland & Ramkrishnan,1995) “work situation” (Bannon & Bødker, 1997) “workpractice” (Goldkuhl & Röstlinger, 2002) “work system” (Alter, 2002) “activity domain” (Taxén, 2003)

A conceptualization of human activity

Context Norms Means Actions Object, Motive Other contexts Actors

Capability Individual-acting-with-mediational-means (Wertsch, 1991) Resource Resource – always with respect to motive and context

Why start from activity (Activity Theory)? Object and Motive shaping the activity Focus on meaning construction Originally a psychological theory (Vygotsky) –Grounding in individual, innate faculties Meaningful context for individual actions Based on interesting Marxian concepts –Dialectical relations –Praxis –Mediation Have been elaborated –Cultural Historical Activity Theory (CHAT) –Activity Domain Theory

Organizations

Norms Actions Other contexts Actors Object, Motive Context Means

Activities in product development Courtesy Siemens PLM Software Same Object, different Motives, in various contexts

Coordinative mode Object: coordination Transformative mode Object: product Two modes of actions in an activity Enacts coordination capabilities Information models Process models Rules IS support.... Draws on coordination capabilities

Work object A Activity A Transformative capabilities A Coordinative capabilities A Activity a1 Work object a1 Transformative capabilities a1 Coordinative capabilities a1 Activity a2 Work object a2 Activity a3 Work object a3 Activity a4 Work object a4 Transformative capabilities a2 Coordinative capabilities a2 Transformative capabilities a3 Coordinative capabilities a3 Transformative capabilities a4 Coordinative capabilities a4

Example from Ericsson

Sales Customers, Tenders Design Product Supply Orders Customer needs Product

Customer needs IT department IT infrastructure Sales Customers, Tenders Service & Support Installed Base Service Design Product Supply Orders Dependencies between activities ERP consultants ERP application [Coordination is] managing the dependencies between activities (Malone & Crowston, 1994, p. 90)

ERP systems

Observations ERP-system impacts several activities –Valid for other systems as well, e.g. Product Lifecycle Management (PLM) systems Basically a coordinative means –Activities need to be coordinated Coordination in focus for ERP initiatives

Insights

Tones! Tons! Context

Design HSC HSD APX 1 SubS Block SWU HWU APT SubS Block SWU HWU APZ APX 2 SubS Block LMHWU APR Supply Product Package Site Common Power Cooling Additional mtrl Installation mtrl Product Package Other Deliverables SW ‘dump’ LZY /1 Product Package HW Platfom FAP Cabinet BFE /12 Mounting Set BAY /1 Connection Cable RPM /12 CPI LZN /1 Sales SSI Services FGC HW Platform FGC SW Features FGC Product packge FAP Product packge FAP SSI Service FAP Node Release FGB System Solution FGA Context

Sales Customers, Tenders Design Product Supply Orders Customer needs Product Commonality “One Company”

Sales Customers, Tenders Design Product Supply Orders Customer needs Product Commonality “War-lords”

Sales Customers, Tenders Design Product Supply Orders Customer needs Product Commonality “Federated”

Transitions

Sales Customers, Tenders Design Product Supply Orders Customer needs Product Transitions

DS- DS4 PR-PR1PR2PRA HW Design PRB DS1DS2 DS3 PSAPSN PS- PSSPSF PSB CS- CSA Define Product Content Define Business Opportunity Create Business Sales Design Market Offer Prepare Deployment Specify Product Design & Verify Product Supply Solution Implement Solution In- Service Support Exhibit Product in Service Design Supply Sales PC0 SC1 PC4 SC6 PC2 SC5 PC1 SC2 PC5 PC6 SC7 PC3 SC4SC3

Sales Customers, Tenders Design Product Supply Orders Customer needs Product Adaptation and emergence ERP system Vendor

Implementation

Implementation guidelines Identify activities from Objects Define dependencies between activities

Create Business Sales Supply Solution Implement Solution In-Service Support Define Business Opportunity Define Product Content Design Market Offer Prepare Deployment Exhibit Product in Service Specify Product Design & Verify Product Performance Fulfillment Solution Fulfillment Product in Service New Standards & Technology Changes & Expectations & Gap Solution Need Performance Need or Incident PC0 PC1 PC2 SC8 PC6 SC7 SC5 SC1 SC2 SC6 PC3 PC4PC5 SC3SC4 TTC flow states PC0: Offer requested PC1: Order / Contract PC2: Product arrived PC3: Ready for Acceptance PC4: Customer Acceptance PC5: Product in service PC6: Solution fulfillment TTM states SC1: Market offer intent SC2: Product release intent SC3: Product model approval SC4: Design Implementation Decision SC5: Market offer SC6: Product quality approved SC6.5: Product ready for deployment SC7: Market release decision SC8: Full deployment acknowledged IS/IT InfrastructureBusiness rules Human ResourcesFinancingSourcing SC6.5 ERP System

Identify activities from Objects Define dependencies between activities Agree on provisional least acceptable commons –Business rules –Master data –Overall business process –Transitions between major activities Implementation guidelines Consider context specific needs –E.g. different product structures in Sales, Design, and Supply Take heed of emergence –Capabilities of actors and ERP-system evolve during implementation –Small steps, validation of each step –Joint effort: users, ERP vendors and organizational architects Flexible ERP system –User interfaces –Generating reports –Activity specific terms and symbols –Data entry –Processes –Transitions between activities

Summary and conclusions Activity the building block of organizations –Frames meaningful contexts based on Object and Motive Organizations integrate / coordinate activities Coordination – managing dependencies between activities ERP systems are seen as coordinative means Theoretical framework guiding inquiries into –Contexts and ERP-systems –Transitions between activities –Balancing between commonality and locality –Adaptations between ERP built-in capabilities and activity needs –Emergence of capabilities (human and non-human) –“Best practice” –Integration and coordination –Implementation guidelines