1 Tracking tests – Analysis results October 2007 Campaign Panagiota Xydi Acknowledgements: to all FIDEL team Cern, December 09, 2007 AT-MTM.

Slides:



Advertisements
Similar presentations
Future CABB Data Reduction Mark Wieringa | Science Data Processing | Australia Telescope National Facility ATUC - 11 th June 2013 CSIRO ASTRONOMY AND SPACE.
Advertisements

Patch Testing HYPACK 2013.
Page 1 GOMOS Calibration Review - ESTEC - 10 September 2002 Radiometric performance ESTEC – SEPTEMBER 10, 2002 Instrument performance session Gilbert BARROT.
1 HMC100XHMC1021/2HMC1051/2HMC1041/2/3Units Sensitivity mV/V/Gauss Field Range±2±6±6 ±6 Gauss Field Resolution µGauss Linearity (±
Linear Equations Review. Find the slope and y intercept: y + x = -1.
Nominal and no CSR (R 56-1 = 55 mm, R 56-2 = 59 mm, R 56-3 = 0) L1 phase = 21 deg, V 3.9 = 55 MV CSR OFF BC3 OFF Elegant Tracking  z1 = mm (post.
Commissioning LHC Beam Instrumentation for Nominal Bunch Intensities Beam Commissioning Working Group June 15 th 2010 Rhodri Jones (CERN Beam Instrumentation.
Planners help to keep you organized and focused!
A 1 A 2 A 3 A 4 B B B
Compound Gear Ratios Robotics Academy All Rights Reserved.
Cecile Limborg-Deprey Injector Commissioning September Injector Commissioning Plans C.Limborg-Deprey Gun exit measurements.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
CERN VIBRATION SENSOR PROPOSAL The research leading to these results has received funding from the European Commission under the FP7 Research Infrastructures.
Measurement report of Boostec girders Control after receipt Sylvain GRIFFET, 13/12/2010 Measurements performed on the 1 st and 2 nd of December 2010 with.
Searching for Quantum LOVE at the Australian Synchrotron Light Source Eugene Tan On behalf of Rohan Dowd 120/10/2010Eugene Tan – IWLC 2010, Genega ASLS.
AIDA Infrastructure for very forward calorimeters Design proposal Mechanical support structure Designers:In collaboration with: Eric DavidFrancois-Xavier.
Review of tests of superconducting magnets in SM18 - Stephane Sanfilippo AT-MTM-AS Field Quality of MQ. Measured in SM18 Presented by: Stephane Sanfilippo.
Field Quality Working Group-14/12/04 - Stephane Sanfilippo AT-MTM-AS Field Quality measurements at cold. Standard program v.s extended tests. Presented.
PERFORMANCE OF THE MACRO LIMITED STREAMER TUBES IN DRIFT MODE FOR MEASUREMENTS OF MUON ENERGY - Use of the MACRO limited streamer tubes in drift mode -Use.
Section 2.2 Functions  Functions & Graphs  Function Notation & Equations  Applications: Interpolation & Extrapolation 12.2.
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
H. Bartosik, K. Cornelis, A. Guerrero, B. Mikulek, G. Rumolo, Y. Papaphilippou, B. Salvant, E. Shaposhnikova June 16 th, 2011.
ATLAS Inner Detector Magnetic Field I am responsible for providing the magnetic field map for the ATLAS Inner Detector.  6m long x 2m diameter cylindrical.
LCLS-II Magnet Error Sensitivities. Sensitivities of dipole magnets, from injector output (95 MeV) to SXR undulator input (4 GeV), where each plotted.
SMT Assembly & Rates, Take 2 (or 3?) Changes –Limited tents to Barrels 1&6, layers 1&3 (of 4) –Used Yuri’s tent numbers in addition to nominal tolerance.
Analysis of MBXW and MBW Per Hagen (TE/MSC) Acknowledgements: R. Wolf (2008 analysis), G. de Rijk (ROXIE model), B. Auchmann (ROXIE support),
The 2008 SPS electron cloud transmission experiment: first results F. Caspers, E. Mahner, T.Kroyer Acknowledgements to B. Henrist, J.M. Jimenez, J.M. Laurent,
19 th GIST Meeting 27 th –29 th August 2003 GERB mirror mechanism 1 GERB mirror mechanism, pointing and repeatability (Tech Note MSG-RAL-GE-TN-2011) B.C.Stewart.
PS (electron cloud?!) instability at flat top Mauro Pivi Gianni Iadarola, Giovanni Rumolo, Simone Gilardoni 05/06/2012 LIU-PS meeting, CERN.
21 Jun 2010Paul Dauncey1 First look at FNAL tracking chamber alignment Paul Dauncey, with lots of help from Daniel and Angela.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
1. Introduction 2. The model and experimental design 3. Space-time structure of systematic error 4. Space-time structure of forecast error 5. Error growth.
Vertical Emittance Tuning at the Australian Synchrotron Light Source Rohan Dowd Presented by Eugene Tan.
Motion Graphs, kinematics - 2
29 Jul 2008Paul Dauncey1 Some sensor noise measurements Paul Dauncey.
Chapter 9: Rotational Motion
A high-resolution Aquarius OI SSS L4 analysis: 3-year, near-global, weekly, 0.5 degree grid Oleg Melnichenko, Peter Hacker, Nikolai Maximenko, and James.
14/1/2011 LHC Lumi days - J. Wenninger 1 IP positions and angles, knowledge and correction Acknowledgments: W. White, E. Calvo J. Wenninger BE-OP-LHC.
Linear Functions Students will be able to determine whether or not a function is linear and be able to write a linear function given a real world situation.
The Circle Post-Lab II A ( cm 2 ) r ( cm ) Area vs. Radius A ( cm 2 ) r 2 ( cm 2 ) Area vs. Radius 2 Since the graph is linear and contains (0,0) Y-intercept.
Update on TMCI measurements March 5, 2008 G. Arduini, R. Jones, E. Métral, G. Papotti, G. Rumolo, B. Salvant, R Tomas, R. Steinhagen Many thanks to the.
7 th March 2008 Magnet Modelling N. Sammut On behalf of the FIDEL Working Group.
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
RF measurements during floating MD in Week 40 3 rd of October 2012 LIU-SPS BD WG 25/10/2012 Participants: T. Argyropoulos, H. Bartosik, T. Bohl, J. Esteban.
Measurement of LHC Superconducting Dipole and Quadrupole Magnets in Ramp Rate Conditions G.Deferne, CERN Aknowledgements: M. Di Castro, S. Sanfilippo,
Outcome of beam dynamics simulations - Scenarios, requirements and expected gains s LIU-SPS Coordination meeting 26/08/2015 A. Lasheen, E. Shaposhnikova,
Coil-pack assembly procedure Paolo Ferracin LQS01 readiness review #3 Assembly LBNL July 28, 2009.
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
AB-CO Review, 23 September 2005 L. Walckiers AT-MTM p. 1 Project description  To maintain for LHC completion  Magnet Rescue Activities [MAR]  Support.
Unit 7: Writing Linear Equations THURS., DECEMBER 10 TH, 2015 (1, 3, 5, 7)
Baby-MIND Modules & Services
Expected hardware status and Priority of the commissioning task
First Year of Operation at the Two-beam Test Stand
LIU Wire Scanner Milestones June 2017
Work progress in Turin x the MVD
Space charge studies at the SPS
Tracking System at CERN 06 and 07 test beams
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Insert using Linear Hashing
Upcoming longitudinal MDs
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
قراءة القوائم المالية وفـاء شـريف علي. محلل مالي
♠ ♠ ♠ ♠ ♠ ♠ ♠ ♠ Objectives القرص الدوار والدولاب مجلس أبوظبي للتعليم
27 Math Review Part 3 Interpolation
Terry Cotter LO/IF Group Leader
Beam dynamics requirements after LS2
Linearization of Bunch Compression (2nd order )
Plan for 1 m b* J. Uythoven & J. Wenninger
HQ test at CERN: strain and stress measurements
Building pattern  Complete the following tables and write the rule 
Presentation transcript:

1 Tracking tests – Analysis results October 2007 Campaign Panagiota Xydi Acknowledgements: to all FIDEL team Cern, December 09, 2007 AT-MTM

2 Results – B2/B1 ratio SSS064 – MB2624 Condition  (B 2 /B 1 ) nominal performance± 6 x Commissioning with low intensity beams ± 1.8 x Tracking tests – Analysis Panagiota Xydi 1/3

3 Results – B2/B1 ratio SSS064 – MB2598 Tracking tests – Analysis Panagiota Xydi 2/3

4 Results – B1/B1 ratio MB2624 – MB2598 Condition  (B 1 /B 1 ) nominal performance± 1 x Tracking tests – Analysis Panagiota Xydi 3/3

5 Tracking tests: Data Processing Offset removal (using linear interpolation of the offset with current ) rms Mean value MB: ~ 0.2 mV rms ~ 0.08 – 0.1 mV SSS: ~ 1 mV rms ~ 2 mV Tracking tests – Analysis Panagiota Xydi 1/3 offset mean value at flat bottom offset mean value at flat top

6 Tracking tests: Data Processing Calibration of fixed- coil measurements with rotating coil measurements (1 st point, slope) 2/3 Tracking tests – Analysis Panagiota Xydi

7 Tracking tests: Data Processing The case of the SSS 3/3 Tracking tests – Analysis Panagiota Xydi