Technical Report for the ISCC Meeting 18 th May 2009 R. Catherall/ M. Lindroos.

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
Operational aspects 2008 run ISCOOL Isolde workshop Nov 2008 Erwin Siesling.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
WAO, Trieste, 24th - 28th September 2007 An Overview of the Reliability and the Fault Trends of the SRS Cheryl Hodgkinson Daresbury Laboratory Synchrotron.
HIE-ISOLDE Design Study and the CATHI Project Richard Catherall EN-STI ISOLDE Technical Coordinator HIE-EBIS Workshop 16 th -17 th October CERN.
NICA INJECTOR Brief remarks on the status based on recent presentations and publications.
EN-STI Group meeting 1 st February 2013 EN-STI Group meeting 1 st February 2013 Interventions for LS1 Elodie Macario EN/STI.
Richard Catherall EN-STI CERN, 1 st February 2012 ISOLDE Technical Report for the INTC.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
ISOLDE: Status report building th ISCC meeting CERN, 31 March 2014 Erwin Siesling, Magda Kowalska.
Richard Catherall EN-STI CERN, 6 th July 2011 ISOLDE Technical Report for the ISCC.
Status of REX and Commissioning with Beam Dr. Jose Alberto Rodriguez, BE-OP-PSB (167538)
Richard Catherall EN-STI 2 nd February 2011 ISCC Technical Report & Report from the Standing Group for the Upgrade of ISOLDE.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
Mid Term Review Meeting, 26 September 2012D. Lanaia1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
Mats Lindroos ISOLDE Technical report INTC 14/2/2007 Mats Lindroos.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 07/01/2013.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
Technical report for ISOLDE INTC 19 May 2007 Mats Lindroos.
The HIE-ISOLDE Faraday Cup
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
ISOLDE Technical Report Richard Catherall ISOLDE Technical Coordinator 50 th INTC meeting 1 st July 2015.
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
ISOLDE: Status report building th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska.
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
Status of the Design Study Richard Catherall EN-STI-RBS.
28/01/2013 Gerrit Jan Focker, BE/BI/PM 1 Isolde SGIU Beam Instrumentation Remarks on status and possible development.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008 ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008.
Technical Report for the ISCC Meeting 23 rd June 2010 Richard Catherall EN-STI-RBS.
Richard Catherall EN-STI CERN, 3 rd November 2011 ISOLDE Technical Report for the INTC.
LIU-Ions overall status and outlook: LEIR H. Bartosik for the LIU-IONS LEIR team* with lots of material from “Beam dynamics studies on LEIR”, H. Bartosik,
Richard Catherall EN-STI CERN, 3 rd November 2011 ISOLDE Technical Report for the ISCC.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
18/March/2008OP-days S.Mataguez / O.Hans1 Hardware Problems in the PS complex LINAC 2 BOOSTER PS AD Thanks to all that helped and provided information,
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
ISOLDE Technical Report for the ISCC
Richard Catherall EN-STI 2nd February 2011
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
AD consolidation activities in LS2
Technical Report for ISOLDE
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
Target and Horn status report
EN-CV interventions during EYETS for PS and PSB
Alexander Herlert, CERN (PH-SME-IS)
HIE-ISOLDE Project: Planning & Resources
ISOLDE Technical report for INTC 21/5/2007
HIE-ISOLDE Status & Summary of HIE-ISOLDE SC
Technical Report ISCC Meeting 16th February 2009
Technical report for ISOLDE INTC 19 May 2007
Technical Report for ISOLDE
Report on HIE-ISOLDE Status
Present and Future test facilities for High-intensity Targetry CERN
Technical Developments at ISOLDE ISCC Meeting 3rd November 2008
The HIE-ISOLDE Design Study and the CATHI Fellow Participation
Ideas for REX/HIE-ISOLDE Upgrade
Presentation transcript:

Technical Report for the ISCC Meeting 18 th May 2009 R. Catherall/ M. Lindroos

Modifications/Repairs Target cooling water program modified and anti- return valve removed to allow a better start up of cooling system. – EN-CV Major overhaul of the ventilation system – EN-CV Rabit irradiation system repaired – B. Crepieux Improvement of the target zone cameras – P. Fernier, S. Burger

REX-ISOLDE Installation of an MCP on the RA0 beam line going into the REXTRAP Progress on the tilted foil holder and its installation being made

REX-ISOLDE Low Energy – The consolidation of the REXTRAP has been presented to IEFC (Injectors and Experimental Facilities Committee) – awaiting approval and project status – Low energy started up discharges in the trap mitigated pulsed trap injection barrier with high-current supplies tested EBIS cathode less performing – change later during the year – Mass-resolving tests finished involving pulsed beam RFQ cooler, trap and EBIS ‘ready’ for real beam time challenge – Installation of B-field shielding around REX mass separator started. – Tested poly- and single-crystalline diamond detectors after the linac for current, profile and energy measurements for HIE- ISOLDE – 4 days of REX operator training F. Wenander, D. Voulot

REX linac (1) Water cooling for RF amplifiers: objective: replace the air cooling system with closed-circuit water cooling -> heat exchanger prototype installed and tested -> modification of existing water circuit or dedicated closed-loop circuit under study Impedance adapter for the 200MHz objective: improve matching between amplifier and cavity to maximise output power -> installed and operational Consolidation of 7-gaps cavities tuner -> new mechanics for the linear drive under construction

REX linac (2) Linac shielding objective: get rid of linac shielding on the cavities -> simplify access and maintenance -> improve safety REX beam instrumentation control system consolidation New magnetic steerers -> to be delivered in November New optics downstream the linac -> improved transmission and reproducibility

RFQ Integration of RFQ vacuum controls into control system. – J. de Freitas, H. Vestergard, E. Piselli Successful construction and testing of a robust RF amplifier. – P. Fernier

Booster New Vistar including; – P-beam intensity – Focus alarm – P-beam position SEM Grid Tests; – Beam profiles as a function of position and intensity – E. Piselli, E. Siesling, T. Stora

Drawings From the laser scan to Catia – Creation of detailed Catia model – Being used by Agnieszka Leyko for Fluka simulations on present and future p-beam and shielding scenarios Euclid and Pro-Engineer to Catia migration on-going for REX-ISOLDE Catia models available for targetry Planned integration of equipment models into hall D. Voulot S. Marzari V. Baronzier

EN-STI-RBS First measurements of 8 Li and 8 He in FTS Calibration of FTS against old tape station on going Test of BeO target with n-converter for the production of 6 He was successful. Results pending In parallel, n-flux measurements done with protons on converter. – Analysis on-going – T. Giles, T. Stora, E. Noah

Difficult Start Up Front End pistons – An mechanical default in the replacement piston prevented it from working properly. A second replacement piston required modification of it’s support. – The time required had consequences on the programmed laser tests during the cold check out period. Stepping motor controllers – Two motor drivers failed in one week – No spares (~15 years old) – Thanks to EN-STI- ECE for repair

Actualities! Radiation Protection – The operational radiation protection service is minimal 1 technician – All shutdown planning done around his availability – Any absences can cause serious delays for both the technical group and physics Vacuum Controls – Minimum support from the vacuum controls section – Consolidation is apparently planned for 2009/2010 but no news Safety Audit – Most of the ISOLDE community are undergoing interviews in view of exposing Safety Management shortcomings

EN-STI One technical student for Fluka simulations on shielding in target area – 6 months as from March One technical student for electronics development on FE6, tilted foils/motor controls – 1 year as from June 2009 Selection board for technician for Witch/REX Lack of resources for target development