CMWG Update to WMS 11-13-13 Report of CMWG Meeting of 11-6-13 M. Wagner Edison Mission Marketing & Trading Thanks to ERCOT Staff for Graphics See ERCOT.

Slides:



Advertisements
Similar presentations
Outage Cost Study Market Analysis and Design Outage Coordination Improvement Task Force 3/23/2015.
Advertisements

Ancillary Services and SCED Jeff Gilbertson Market Analyst Congestion Management Working Group 9/4/2013.
Automation and Improvements to Default Uplift Methodology (summary/white paper of a draft NPRR)
CRR Shortfall – Revenue Equalization Part 2 (Continuation from 2/21/08 TPTF discussion) Bill Barnes TPTF 3/5/2008.
Discussion: Use of RAPs in system operations Kris Dixit 1.
CMWG Update June WMS Meeting CMWG Update 1. CMWG (Vote) Confirmation of new Vice Chair: Greg Thurnher (Representing Luminant/TXU Energy) 2.
February 2012 CMWG Constraints Competitiveness Tests (CCT)
John Dumas Director of Wholesale Market Operations ERCOT Operating Reserve Demand Curve.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
1 Dead Bus Pricing Issue/CRR Performance Issue TAC 3 February, 2010.
December 2, 2011 QMWG Summary of Potential Issues with NPRR385 Price Floor ERCOT.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
January 14, New logic and invoices used in January 2015 when closing out December 2014 New Bill Determinants: CRRBAFA- CRR Balancing Account Fund.
Market Mitigation Concept Group Update Jim Galvin April 26, 2004.
1 WMS Report To TAC September In Brief Four Working Group Reports Four Working Group Reports One Task Force Report One Task Force Report Three.
April, 2008 Maximum Shadow Price. April, 2008 Protocol Requirement: Transmission Constraint Management (2)ERCOT shall establish a maximum Shadow.
John Dumas Director of Wholesale Market Operations Jeff Billo Manager of Mid Term Planning Dan Jones Director with Potomac Economics, the ERCOT IMM Board.
Bill Hellinghausen EDF Trading North America
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
Commercial Operations Subcommittee (COPS) January 2014 Update to TAC 1/29/2015.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
Presentation to House Regulated Industries Committee Chairman Phil King Trip Doggett Chief Operating Officer The Electric Reliability Council of Texas.
April 28, 2008 Constraint Competitiveness Tests, an Overview Congestion Management Working Group.
East Texas Export Limit ERCOT Operations Planning ERCOT Market Presentation
RCWG Update to WMS December 5, General Update Agenda Items for Today: Verifiable Cost Manual clarifications (vote) White Paper on Long Term Fuel.
September 2012 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Matt Tozer ERCOT Manager, Settlements & Billing 9/4/2013 ERCOT Update Management of the Balancing Account CMWG.
CMWG Update to WMS Report of CMWG Meeting of M Wagner Edison Mission Marketing & Trading.
CRR Shortfall – Revenue Equalization Part 3 (Continuation from 3/5/08 TPTF discussion) Bill Barnes/Sharon Wang TPTF 3/21/2008.
ERCOT, Market Analysis 2013 Annual Constraint Competitiveness Test (CCT) Study Results – Update for 8/27/12 CMWG 8/27/2012 ERCOT Public.
Competitive Constraints/ Protocols 3.19 Presented to CMWG 10/14/2011 Steve Reedy, Manager, CRR.
CMWG Update WMS September 2015 Meeting. CRR Balancing Account Fund Discussion The CRR Balancing Account fund appears to be working as expected The cap.
DREAM November Meeting. Agenda Introduction and Expectations Path to becoming a Resource Node – ERCOT Registration process for non-modeled resources –
Congestion Management Working Group WMS update 11/7/2012.
1 WMS Report To TAC May In Brief One Working Group Reports One Working Group Reports Two Task Force Reports Two Task Force Reports One Staff report.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
Lance Cunningham, Ph.D., PE November Frisco, TX 2.
CMWG Update to WMS Report of CMWG Meetings of &
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Wholesale Market Subcommittee Update May 2 nd, 2013 Technical Advisory Committee.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
2010 CSC & Zone Selection: 6 Lines W-N & 4 Zones (WN2_SN0-4Z) Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) August 19,
MCWG Update to WMS 11/13/2013. MCWG Update to WMS General Update - October 30 th Joint MCWG/CWG Meeting Review September 25 Meeting Minutes - Approved.
CMWG NATF 11/02/2010- CCT/DME update + Outages in the CRR Model follow-up Steve Reedy – Market Design and Analysis 1.
Congestion Management Work Group Update WMS I Flores, S Reedy—ERCOT M Wagner--PSEG TX.
1 WMS Report TO TAC April 2007 (which is in March)
Constraints Competitiveness Tests (CCT) Results Analysis of 2010 SSWG Peak Summer Case Presented to CMWG 1/27/2010.
August 2012 Wholesale Market Operations Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach Market Support and Analysis.
Market Operating Level Agreement (OLA) Discussion Betty Day 8 December 2009 Nodal Advisory Task Force.
CMWG Update to WMS M Wagner Edison Mission Marketing & Trading.
WMS 1/9/20131 Priority Power Management, LLC Proposed Changes to Holistic Solution WMS January 9, 2013 James Z. Brazell Law Office of James Z. Brazell.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
ERCOT Monthly Operational Overview (January 2015) ERCOT Public February 15, 2015.
TAC December 3, 2009 Meeting Update 1. TX Nodal Implementation 2 PhaseWhenScopeStatus 2.1: Market Connectivity MILESTONE COMPLETE Oct. 28MP interface.
2% Shift Factor dispatchable rule discussion and alternatives for the 2% rule Kris Dixit 1.
CMWG Update to WMS Report of CMWG Meeting of
NPRR 520 Resmi Surendran ERCOT. Current CCT Process Annual CCT (ACCT) is run every year to feed the results to Monthly CCT (MCCT) MCCT is run every month.
RCWG Update to WMS March 7, Draft NPRR, Caps and Floors for Energy Storage Resources Chair of ETWG gave high level overview ERCOT had questions.
CSWG Update Blake Holt ERCOT CSWG 10/20/ Thanksgiving Settlement Schedule 12/01/2014 (M) 12/02/2014 (T) 12/03/2014 (W) 12/04/2014 (Th) 12/05/2014.
Technical Advisory Committee Presentation to the ERCOT Board of Directors July 15, 2008.
Proposal for Consideration Regarding Holistic Solution to Congestion Irresolvable in SCED Issue:How do you identify when constraint is irresolvable Proposal:Adopt.
CMWG Update to WMS Met 4/24 & 5/11 Continued Work on PRR 801 –Discussed outages as related to TCR Cases –ERCOT evaluates various outage combinations.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Texas Congestion Management Work Group Update For WMS Marguerite Wagner, PSEG Texas.
Report to TAC June In Brief Working Group Reports Working Group Reports CMWG CMWG MCWG MCWG QMWG QMWG VCWG VCWG Other Reports Other Reports NOGRR.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
CRR Deration and NPRR821 WMS 09/06/2017.
John Dumas Director, Wholesale Market Operations
Settlements Analysis due to SFT Deration Issue
Presentation transcript:

CMWG Update to WMS Report of CMWG Meeting of M. Wagner Edison Mission Marketing & Trading Thanks to ERCOT Staff for Graphics See ERCOT Presentations at:

Assignment: Element Competitiveness Index (ECI) ECI—Currently 2300—working except where constraint designation flips often ERCOT gave an excellent presentation on top noncompetitive constraints/ mitigation—but refinements under discussion for cases like Singleton-Zenith – SZ is one of the most frequently identified noncompetitive constraints by the test—but historically determined as competitive— significant gen on both sides of constraint--but test considers all generation in market as needed to solve constraint—which is not the case – Oscillating around 2300 ECI threshold Will have further evaluations in December to look at potential impacts of DMEs changing offers One ides: If potential price change of largest DME is <= the mitigated offer level for the next marginal DME, then consider competitive From Station: SNG (345kV) To Station: ZEN (345kV) Load Zone: LZ_HOUSTON

ECI ERCOT Analysis 8/1/13 – 10/8/13 Prior to Implementation of NPRR 520 After Implementation of NPRR 520 Jul-13Aug-13Sep-13 ECI Methodologysf*HSLsf*sf*HSL ECI Threshold on The Export Side3,000N/A ECI Threshold on The Import Side2,5002,300 Percentage of Mitigated Resources for Each SCED Interval 100%4.80%3.08%5.73% Average System Lambda Increase ($/MWh) N/A Cumulative PNM Increase ($/MW) N/A Total Number of Non-competitive Constraints 100%95.00%96.60%88.20% Non-competitive Constraints ECI >= 2300 N/A 95.6%88.3% Pivotal Players Exist N/A 31.1%34.5% No SF <= N/A 1.1%1.9%

ERCOT Analysis 8/1/13 – 10/8/13

Assignment: Work Toward Fully Funded CRRs Since Start of Nodal -- CRRs have been underfunded by ~ $30M NPRR 580 to modify CRR Balancing Account (BA) – Would accrue to a TAC specified level, to cover months where congestion rent is insufficient to fully fund CRRs – Distribute to load when the funds exceeds a specified threshold. – From Start of Nodal ~$164M distributed to loads from CRR BA – Using some of the overage to fully fund CRRs: Creates appropriate market incentives to hedge, and Hedges will be more reliable Should result in higher CRR auction revenues—because CRR product is more firm – In a month where additional funds available in the CRR BA & shortfalls are fully funded, the Rolling BA would be refilled before allocating to QSEs with load

New Generic Transmission Limit (GTL): East Texas Outage clearances can create a stability limit – N-1 in the base case + single-line- to-ground fault breaker stuck event The interface consists of six 345-kV lines: MartinLake – Shamburger MartinLake – TylerGrande MartinLake – Elkton MartinLake – Stryker MtEnterprise – Trinidad MtEnterprise – Nacogdoches Total gen cap: 3250 MW Enforced Limits under GTL Activation 1900 or 2300 MW Any one of nine 345kV line outages listed in table will enforce the limit 345-kV Line OutageInterface Limit Martin Lake – ShamburgerInterface Flow* less than 1900 MW Martin Lake – Tyler GrandeInterface Flow less than 1900 MW Mt. Enterprise – TrinidadInterface Flow less than 1900 MW Martin Lake – ElktonInterface Flow less than 2300 MW Martin Lake – StrykerInterface Flow less than 2300 MW Tyler Grande – TriCornerInterface Flow less than 2300 MW Shamburger – RoyseInterface Flow less than 2300 MW Elkton – ForneyInterface Flow less than 2300 MW Stryker -- TrinidadInterface Flow less than 2300 MW Target GTL implementation date of 12/18/13

Assignment: Work Toward Fully Funded CRRs Improving CRR Modeling—Potential Ideas Outage Scheduling – opportunity for improvement—would it be useful to look at incentives in other ISOs? Is there a method to better capture outages—say “indicative scheduling” days out for high kV work? Is it possible to develop metrics that align Outage Scheduling and CRR model builds?