HL-LHC Standards and Best Practices Workshop (11-13 June 2014)

Slides:



Advertisements
Similar presentations
Codes & Standards.
Advertisements

Comparison between American and European Pressure Vessel Rules
INSTITUTE FOR PRESSURE VESSEL & PLANT TECHNOLOGY VIENNA UNIVERSITY OF TECHNOLOGY Harmonized Standards / Materials Josef L. Zeman Vienna University of Technology.
Qualification for Brazing
ASME Nuclear Conformity Assessment
Gas Transmission Pipelines
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Material choice Ofelia Capatina OC, Material choices Discuss material choices for – Helium tank – Flanges, joints, bellow OC,
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
Qualification of HVAC systems
Safety & Safety Documentation 2 3 Safety in three Questions Why ? Providing a safe workplace is a legal and moral obligation on every undertaking, and.
H IGH L UMINOSITY LHC WP1 - CERN S AFETY R EQUIREMENTS Stefan Roesler - Phillip Santos Silva – Ralf Trant EDMS# HSE Unit April 2011.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Dr Daniel Colbourne 36th Meeting of the Open-ended Working Group of the Parties to the Montreal Protocol – Side Event UNEP.
U D T Workshop on the Pressure Equipment Directive, Warsaw June 2004 INTERFACES BETWEEN NATIONAL LEGISLATION AND DIRECTIVE 97/23/EC SYSTEM OF ENSURING.
2 Technical seminar - 5 th June 2014 Vincent Roger - TE-MSC-TF.
Certificate in Pipeline Construction, Welding & Inspection LECA LEXTON ENERGY CORPORATE ACADEMY Copyright 2013 Lexton Energy Incorporated PCWI delivered.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.
23 rd World Gas Conference 5 – 9 June 2006 Amsterdam Full Scale Qualification Trials and Certification of the AMPLITUDE-LNG LOADING SYSTEM Phillip COX.
Assemblies Intentions and enforcement. Intentions Free movement  CE marking for vessels, accessories and assemblies Well-defined responsibilities  Manufacturer,
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
1 PED: equivalent overall level of safety PED Annex 1, clause 7: The following provision apply as a general rule. However, where they are not applied,
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION KEKB Review Committee/ NAKAI Hirotaka KEK Crab Cavity - Cryogenics - KEKB Crab Cavity Group - presented.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.
06/02/20161 Benny Hoff TÜV NORD Sweden AB AFS 2005:2 Installations.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
The integration of 420 m detectors into the LHC
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Vacuum assessment for BI equipment TE-VSC. Why do we need to assess BI components 10/6/2015 BI Beam Operational Spare Strategy Workshop No 2 2 The main.
C. Darve / Technical Board – December 13 th, 2012Preliminary pressure vessel code requirements Preliminary pressure vessel code requirements Technical.
ESS Cryomodule Status Meeting – Elements of Safety | | Christine Darve Elements of Safety Applicable to the ESS 2013 January, 9 th Christine.
Workshop on Accreditation of Bodies Certifying Medical Devices Kiev, November 2014.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
- Generals for PED matters - Definition of pressure vessel and classes - Who is who according to PED - Definition of pressure vessel + codes for XFEL -
Logo area 11 T Review: Safety and Codes Thomas Otto HL-LHC Project Safety Officer With contributions by -Frédéric Savary, Hervé Prin, TE-MSC -Carlos Arregui,
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer With contributions by -Paolo Ferrcin and Ezio Todesco, TE-MSC -Francesca Viggiano,
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Logo area Compliance with CERN Safety Rules – Role of CERN Health, Safety & Environment protection (HSE) Unit C. Arregui, S. Marsh (HSE-SEE) International.
ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006.
Steve Griffith February 28th, 2017
Vishy Ravindranath LCLS-II 2 K Cold Box FDR March 9, 2017
Crab Cavity Technical Coordination meeting:
Teleconf ACS – FREIA 28th March 2017
The application of the PED on the design codes for cryogenic equipment and future developments foreseen in this field Paris, 06/09/2016 l Hervé BARTHELEMY.
Preparation of functional/engineering specifications for HL-LHC
Strategy for conformity of non-standard cryogenic equipment
Internal review of IR2 LEP cryostats (WP11/WP5) Close out session
Installation of an Instrument on a CERN machine
SPS cryogenic proximity equipment and SM18 validation
Third Party Activities for FH1 Project
Thomas Otto, TE Department, CERN
HL-LHC Safety Assessment Process
Harmonized Standards / Materials Josef L
Pressure Equipment Workshop September 2007 – Day 1
Assemblies Intentions and enforcement
HAZOP Guidewords Base Set
ESS approach and support for Declaration of Conformity (CE-marking) Fredrik Håkansson 9th SRF ESS
PANDA The conceptual design of the control Dewar
ESS approach and support for Declaration of Conformity (CE-marking) Fredrik Håkansson 9th SRF ESS
INTERFACES BETWEEN NATIONAL LEGISLATION AND DIRECTIVE 97/23/EC
Workshop on the Pressure Equipment Directive, Riga,
PSS verification and validation
Gas Transmission Pipelines
Presentation transcript:

HL-LHC Standards and Best Practices Workshop (11-13 June 2014)

2 Field global overview Source: INTERNATIONAL CLASSIFICATION FOR STANDARDS, 2005 (ISO)

HL-LHC Standards and Best Practices Workshop (11-13 June 2014) 3 Identified specific groups Fluid systems and components for general use Fluid storage devices Gas pressure vessels, gas cylinders Cryogenic equipment Valves Pipeline components and pipelines Hose and hose assemblies Pipeline components and pipelines in general Iron and steel pipes Metal fittings Flanges, couplings and joints Vacuum technology Global overview EDMS:

HL-LHC Standards and Best Practices Workshop (11-13 June 2014) 4 Which technical subjects, within the fluid systems field, should be covered by standards (existing or not)? General/project coordination related Technical groups/sub-groups field related Specific know-how and best practices related Other subjects (not field related) Standardization related

HL-LHC Standards and Best Practices Workshop (11-13 June 2014) 5 1) Technical groups/sub-groups field related Cryogenic pressure vessels (incl. cryostats) Pipelines (incl. cryogenic lines, piping in valve boxes and cryostats) Pressure fittings Flanges, couplings and joints Valves Vacuum technology Final testing of pressure equipment ASME BPVC vs EN for the construction of pressure equipment – a few discussions Both codes are acceptable. EN has the advantage of providing presumption of conformity with PED Essential Safety Requirements Consistent use of one single code from design to manufacturing and testing is required (complemented eventually by more stringent requirements specified by CERN for specific cases) If PED is applicable Notified bodies have to be involved from the beginning to provide assistance on the conformity assessment and for CE-marking of the equipment (case of risk categories ≥ II)

HL-LHC Standards and Best Practices Workshop (11-13 June 2014) 6 2) Specific know-how and best practices related Bellows / flexibles hoses requirements for standard, and non-standard, applications (e.g., using non-standard materials – Ti – and specific types of bellows – edge welded) Sizing of safety devices for cryogenic equipment Protection of cryogenic volumes + vacuum jacket Two-phase flow discharge (e.g., inlet supercritical conditions) Cleanliness requirements for different types of equipment Welding of cryogenic equipment (welding techniques specified in standards are not adapted to cryogenic applications, e.g., lip-welding) Qualification of non-standard materials for low temperature applications (minimum guaranteed mechanical properties, etc)

HL-LHC Standards and Best Practices Workshop (11-13 June 2014) 7 3) Standardization related Standardization of components (reduce variants) Valves Pumps Vacuum components Flanges types – standardization between US-EU Fittings Vacuum sealing of static vacuum insulated equipment Interfaces types limitation

HL-LHC Standards and Best Practices Workshop (11-13 June 2014) 8 4) General/Project coordination Top-bottom system requirements propagation and bottom-top verification of compliance is needed Avoid over constraining a system (examples) Baking (for vacuum): the equipment with the minimum heating speed constrains the operation/conditioning of the whole sector Cooling water installations: cooling temperature defined at 10°C for one small client while all the other clients require only 25°C ! -> big impact on global price System overview is required to identify discrepancies on limiting, sizing, testing, operation, values Definition of relevant parameters (not only beam related) to be validated by top management  parameters derived from beam requirements and that impact variables such as, for example, pressure, temperature, mass-flows, heat loads, required to perform the design of systems, sub-systems and equipment Define key performance parameters for acceptance of systems (at top-level) Interfaces and corresponding interface data identification is required Management of the information of the equipment in view of operation and maintenance (as-built documentation, main parameters, operation and maintenance manuals,…)

HL-LHC Standards and Best Practices Workshop (11-13 June 2014) 9 5) Other subjects (not field related) Guidelines for equipment handling Space constraints Environment around the equipment (survey, alignment, removable collimators…) For remote handling Standardization between experiments and HL- LHC Standardization on remote handling Factory acceptance criteria Site acceptance criteria Commissioning tests

HL-LHC Standards and Best Practices Workshop (11-13 June 2014) 10 Thank you for your attention and to all who contributed to the discussions: L. Alberty, G. Apolunari, V. Baglin, A. Ballarino, I. Bejar Alonso, Y. Body, O. Capatina, S. Giannelli, R. Carcagno, L. Dassa, J. Gascon, M. Juchno, Y. Muttoni, S. Pattalwar, G. Perinic, O. Pirotte, F. Sanchez Galan, G. Volpini, Z. Zaharieva Questions?