Asphalt Pavement Association of Indiana Annual Winter Conference Michael B. Cline Commissioner, INDOT December 14, 2010.

Slides:



Advertisements
Similar presentations
Orange County Transportation Authority Measure M2 M2020 Update and Select Project Highlights Orange County Business Council Infrastructure Committee December.
Advertisements

Titusville to Edgewater Bike Loop PD&E Study
District 2 System Preservation Projects for FY 15 and FY 16 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
Public Works Greg Chock Operations Manager Harlan Hanson Road & Bridge Engineer
John Malbon, CEO, PAPCO & Hampton Roads Member, Virginia Commonwealth Transportation Board May 28, 2014.
District Information Session For the American Recovery and Reinvestment Act.
WELCOME! October 28, 2013 ODOT District 1 & District 2.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
The Way Forward – A 21 st –Century Transportation Plan Frank DePaola, P.E. Administrator, Highway Division April 2013 Massachusetts Department of Transportation.
Local Programs Update July 24, 2014 Jennifer B. DeBruhl Director, Local Assistance Division.
Albemarle RPO Project Update North Carolina Department of Transportation May 2011.
Transportation in Northern Kentucky Rob Hans, P.E. Chief District Engineer, District Six SAME, Cincinnati Post - April 15,
Twenty-Fourth Annual Alabama Asphalt Pavement Conference MARCH 11, 2014 ALDOT HIGHWAY FUNDING UPDATE.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
District 2 System Preservation Projects for FY 14 and FY 15 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
NTTA Expansion Program ASCE January Luncheon Meeting Delivering Mobility Gerry Carrigan Assistant Executive Director of Project Delivery North Texas Tollway.
SCDOT’s Strategic Direction Janet Oakley Secretary of Transportation South Carolina Alliance to Fix Our Roads September 22, 2014 Janet Oakley Secretary.
DRAFT 2009 Long Range Transportation Plan Highway Projects August 11, 2009.
HOOSIER HEARTLAND HIGHWAY Public Information Meeting – August 27, 2009 STATE ROAD 25, SEGMENT 2 From 0.42 mile east of Tippecanoe/Carroll County line to.
Title Slide visuals can be included. MnDOT Highway Construction Outlook Abby McKenzie Office of Investment Management MSPS January 28, 2010.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Road To Success US 41 WIS 441 Tri-County. Road To Success DBE Workshop and Secretary’s Golden Shovel Awards February 18, 2015.
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
Indiana’s Major Moves Projects Asphalt Pavement Association of Indiana Michael B. Cline, P.E., PTOE Commissioner INDOT December 13, 2012.
Charlie Zelle, Commissioner Minnesota Department of Transportation February 18, 2014.
CEAL January 31, Existing Alternative (Preferred Align) Objectives SR-76 Corridor Expand Mobility Improve Safety Enhance natural resources Synergy.
SR25 Preventative Maintenance Project in Tippecanoe County
Current Construction Projects Major Projects Pinellas County.
2014 SCAPA Summer Conference Christy A. Hall, P.E. Deputy Secretary for Engineering.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
TRANSPORTATION AND ECONOMIC DEVELOPMENT LINKAGES PRESENTED BY DEBRA M. SIMMONS WILSON PARSONS BRINCKERHOFF.
Public-Private Partnership Program 2015 Update 2015 American Council of Engineering Companies ACEC – Los Angeles Chapter Luncheon, July 8, 2015.
Condition Assessment & Funding Needs for North Carolina’s Highway System Report to the Joint Legislative Transportation Oversight Committee December 12,
1 Senate Transportation & Housing Committee December 13, 2005 Orange County Transportation Authority.
INDOT Overview ACEC Indiana Luncheon Brandye L. Hendrickson Commissioner, INDOT September 3, 2015.
ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT Transportation Committee Meeting January 26, 2012.
Presenter: Dewayne Johnson, P.E. SE Region Director/Bureau of Traffic Operations Director.
1 The Louisville - Southern Indiana Ohio River Bridges Project (LSIORBP) Real Estate Economic Forecast Two New Bridges, One Project.
Interstate 95 Corridor Improvement Program June 20, 2012.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Trade Corridors Improvement Fund (TCIF) California Freight Advisory Committee February 26, 2015.
N. Hancock Road Traffic Signals October 14 th, 2014 Presentation Prepared By Lake County Public Works Department.
KAPA FALL FORUM T-WORKS Progress 7,714 miles improved $63 million modal projects complete 559 bridges repaired/replaced $2.3 billion let.
Street Maintenance Program Update City Council Work Session February 5, 2013 Department of Public Works & Transportation.
Office of Highway Safety Boston, Massachusetts July 10, 2006.
Orange County Business Council Infrastructure Committee Overview of RCTC’s Major Projects December 8, 2015.
Metro Highway Program Presentation to CMAA Abdollah Ansari
STA US-30 Presentation for TRAC – October 13, 2015
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
State Route 99 Corridor Update Kome Ajise District 10 Director Caltrans.
Program Manager Administrator
Row No. Des # Sponsor Route Work Category Work Type Location County Des Length Federal Fund Type Phase Year Total Cost Federal Funds Non-Federal Funds.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
CENTRAL FLORIDA EXPRESSWAY AUTHORITY FY Five Year Work Plan December 10, 2015 Presented by: Jeanette Maldonado-Ambler, PE Atkins.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
The I-465 West Leg Reconstruction Project
Chapin Town Hall Meeting
Project Status Update I-680 Southbound HOV Gap Closure Project Environmental Phase September 2011 PARSONS.
Metropolitan Planning Organization
SR 25 – Hoosier Heartland Highway Lafayette to Logansport
BUSINESS OWNER MEETING
SR 400 Express Lanes: Market Sounding
Woodinville-Duvall Road Widening Project Update
Geo units Formation Dates In New Zealand
Contract 60X10 Informational Meeting Weber I-55
Commissioners Presentation
Louis E. Feagans, P.E. Statewide Technical Services Director, INDOT
Presentation transcript:

Asphalt Pavement Association of Indiana Annual Winter Conference Michael B. Cline Commissioner, INDOT December 14, 2010

State Highway Fund

Major Moves

Today 41 corridors complete 185 new centerline miles complete 2,800 preservation centerline miles complete 588 bridges rehabbed or replaced Nearly $5.7 billion invested in Major New and Preservation Indiana hasn’t borrowed money since 2004! Major Moves

Major Moves Update 84% of Major New projects on original schedule 2006 thru 2011 have been completed or under construction now 84% of Major New projects on original schedule 2006 thru 2011 have been completed or under construction now Status of Major Projects Status of Major Projects Est $ CN Open to Est $ CN Open to Miles % Let Cost (m) Traffic Miles % Let Cost (m) Traffic US 24 Fort to Port % $ 81 Sep 2012 I-80/94 Interchange Jul 2011 Accelerate Dec 2011 Madison-Milton Bridge Sep 2012 US 31 Plymouth to SB Dec 2014 US 31 Kokomo Dec 2013 I69 Evansville to Crane Dec 2012 SR 25 Hoosier Heartland Dec 2013 I-69 Crane to Bloomington Dec 2014

I-69 Construction: Sections 1-3: 67 miles Evansville to Crane 50% miles let CN Cost: $700M Open to traffic: 12/12 Section 4: 27 miles Crane to Bloomington 1 st letting: summer 2011 Est. CN Cost: $400M Open to traffic: 12/14 MPO Vote approved design and environmental Major Moves

Hoosier Heartland (SR 25) 36 miles 41% let Next letting: February 2011 Mainline, US 421 interchange Alternate Bid Final letting: 7/12 Open to traffic: 12/13 CN Cost: $377M Major Moves Carroll County line

US 31 Kokomo 13 miles 55% let Next letting: August 2011 SR 26 to US 35 Alternate Bid TBD Final letting: 7/12 Open to traffic: 12/13 CN Cost: $175M Major Moves New SB mainline looking north from CR 100S bridge

US 31 Plymouth to South Bend 20 miles 67% let Next letting: February 2011 SR 4 extension & interchange Asphalt Final letting: 4/13 Open to traffic: 12/14 CN Cost: $233M Major Moves New bridge two miles south of SR 4

US 31 Hamilton County 13 miles Next letting: February 2011 SR 38 interchange Alternate Bid Final letting: 2/17 Open to traffic: 2018 CN Cost: $436M Major Moves 146 th Street

Illiana P3

Ohio River Bridges Ohio River (IN Share) $1.1B KY/IN Bridge Authority – funding mechanism Target construction start date: August 2012 Partnerships

Pavement Preservation HMA Tonnage INDOT Contracts

Pavement Preservation HMA Lane Miles INDOT Contracts

Pavement Preservation Project Spending INDOT Contracts (Resurfacing, Restoration, Reconstruction, Replacement)

Pavement Preservation

INDOT

Thank You