Nextef results & status International Workshop on Breakdown Science and High Gradient Technology KEK, Japan 18 April 2012 Toshi Higo.

Slides:



Advertisements
Similar presentations
Breakdown Rate Dependence on Gradient and Pulse Heating in Single Cell Cavities and TD18 Faya Wang, Chris Nantista and Chris Adolphsen May 1, 2010.
Advertisements

Choke-mode damped accelerating structures for CLIC main linac Hao Zha, Tsinghua University Jiaru Shi, CERN
CERN-KEK X-band collaboration 3 Dec T. Higo on behalf of X-band group of KEK.
High gradient studies in simple setups (for discussion) T. Higo.
Report from KEK High gradient study results from Nextef (+ other related activities) LCWS2011, Granada Sep. 27, 2011 T. Higo.
Status of KEK production July 11, 2008 at SLAC KEK T. Higo et al., Accelerator div. T. Takatomi et al., Mech. Eng. Center.
X-band Structures Test Results at NLCTA Faya Wang Chris Adolphsen, Christopher Nantista 9-Feb-11.
July Alexej Grudiev, Improvement of CLIC structure. Possible improvement of the CLIC accelerating structure. From CLIC_G to CLIC_K Alexej.
High gradient features from Nextef on recent CLIC prototype structures US-HG workshop, SLAC 9 February 2011 T. Higo representing X-band group of KEK.
Report from Nextef IWLC10, Genève, Oct. 20 T. Higo (KEK)
Working Group 1: Microwave Acceleration Summary 10 July 2009.
Design of Standing-Wave Accelerator Structure
High-gradient Experiments with Narrow Waveguides Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Noboru Kudo, Shuji Matsumoto, Shigeki Fukuda, Mitsuo Akemoto,
Walter Wuensch CLIC project meeting, 31 March 2015 Accelerating structure program: design and testing.
W. Wuensch, rf development meeting Considerations on running normal conducting cavities cold.
Results from Nextef Observations in high gradient tests of CLIC Prototype Structures and associated study activities CLIC2013, CERN 29 January, 2013 T.
KEK activities on CLIC X-band Accelerating Structures Tsinghua Univ., March 24 T. Higo (KEK)
Accelerating structure test results and what’s next Walter Wuensch CTF3 collaboration meeting
R&D status and future strategy in KEK X-band area May 16, 2011 T. Higo (KEK)
Update of KEK X-band Research Activity March 3, 2009 Shuji Matsumoto Accelerator Laboratory, KEK 2009/3/31US High Gradient Workshop.
日米協力 US/Japan cooperation Research of High Gradient Acceleration Technology for Future Accelerators progress report New proposal 7.
040220LCPAC 2004 Structure (T. Higo)1 X-band accelerator Structure LCPAC Feb. 20, 2004 T. Higo KEK.
Statistical analysis of RF conditioning and breakdowns Jorge GINER NAVARRO CLIC Workshop /01/2015 J. Giner Navarro - CLIC WS20151.
An Overview of the CLIC Testing Program W. Wuensch CLIC ACE
Summary of the meeting T. Higo This meeting was originally born as a collaboration meeting among three laboratories, CERN, SLAC and KEK, but the attendee.
Overview of CLIC main linac accelerating structure design 21/10/2010 A.Grudiev (CERN)
CLIC Workshop – CERN, October / 17 DC breakdown experiments for CLIC CERN, TS-MME Antoine Descoeudres, Trond Ramsvik, Sergio Calatroni, Mauro Taborelli.
EuCARD is co-funded by the European Commission within the Framework Programme 7 under Grant Agreement no Reach of NC and SC Technologies, 50 …
X-band high gradient activities at KEK May 13-15, nd Collaboration meeting on X-band Accelerator Structure Design and Test Program T. Higo, KEK.
X-Band: test stand and structure program
NLC Status and Milestones D. L. Burke ISG9 KEK December 10-13, 2002.
Recent High-gradient test result at KEK Linear Collider Workshop 2012 Arlington, Texas (WebEx) 25 October, 2012 Toshi Higo and X-band group of KEK.
Performance of CLIC prototype accelerator structures tested at Nextef CLIC February 2014 Toshiyasu Higo (KEK)
常伝導技術での LC の可能性 LC feasibility consideration with normal conducting technology 第5回「機構の研究推進について」の意見交 換会 (ILC の推進について ) 平成 24 年 2 月 13 日 加速器・肥後寿泰.
Recent high-gradient results, rf testing, places and plans Steffen Döbert, CLIC Workshop, Test facilities High gradient results Future testing.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
A Study of RF breakdown of Narrow Wave Guide Shuji Matsumoto Kazue Yokoyama Toshi Higo Accelerator Lab., KEK 2016/1/41SLAC Workshop 8-10 July 2009.
KEK workshopWalter Wuensch18 April 2012 Status and objectives of the CLIC X-band and high- gradient activity.
The CLIC accelerating structure development program Walter Wuensch CARE05 23 November 2005.
High gradient study at KEK CLIC08, Oct , 2008 T. Higo.
Progress of X-Band Accelerating Structures LINAC10, Tsukuba 17 Sep T. Higo (KEK)
Status report from KEK Feb. 26, 2010 T. Higo, S. Matsumoto T. Takatomi, Y. Higashi and X-band group.
Nextef results CLIC09, Oct T. Higo (KEK). Contents Quadrant high gradient test status – Initial processing and power limit – VAC characteristics.
Walter WuenschIARC CERN High-gradient accelerating structures for proton acceleration Linear collider development applied to cancer therapy.
TD18 High Power Test Results Faya Wang Chris Adolphsen May 3, 2010.
W. Wuensch CLIC project meeting High-power rf structure testing.
Status of high gradient experiments at Nextef Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Shuji Matsumoto, Shigeki Fukuda Accelerator Laboratory, KEK.
Title 2 nd X-band Accelerator Structure Design and Test-Program Collaboration Meeting Discussion with WebEx on March 17 between CERN and KEK W. Wuensch,
Optimization of CLIC-G structure & Design of CLIC open structure Hao Zha, Alexej Grudiev (CERN) Valery Dolgashev (SLAC) 27/01/2015.
Review of the rf working group of the ICFA Mini Workshop on Novel Accelerators and Colliders which was associated with the Bob Siemann Memorial Symposium.
Narrow waveguide experiments Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Noboru Kudo, Shuji Matsumoto, Shigeki Fukuda, Mitsuo Akemoto, Mitsuhiro Yoshida,
Discussion on critical issues for testing: breakdown identification, preparation for test, processing protocol, etc. 4 th Annual X-band Structure Collaboration.
Some information from Nextef For poster session in IWLC T. Higo.
Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group /5/51 4th X-band Structure Collaboration Meeting, CERN.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
High Power Crab Cavity Testing Ben Woolley HG2016 Argonne National Lab. 8 th June 2016.
Test Accelerating Structures Designs, Objectives and Critical Issues
KEK Status and plans of structure production and testing
Effort to identify the critical issues for high gradient
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
Review of rf structure test results
Testing Infrastructure, Program and Milestones
Recent high-gradient testing results from the CLIC XBoxes
High Gradient tests at the KEK Nextef Facility
Measurements, ideas, curiosities
A Study of RF breakdown of Narrow Wave Guide
T24 results and comparison to the preceding studies on CLIC prototype structures May 17, 2011 T. Higo (KEK)
5th X-Band Structure Collaboration Meeting
T18_VG2.4_Disk_#2 processing summary
Field-Emission mapping measurement on Copper Surface
Presentation transcript:

Nextef results & status International Workshop on Breakdown Science and High Gradient Technology KEK, Japan 18 April 2012 Toshi Higo

Contents Status of Japan and KEK under recovery Normal conducting X-band studies at KEK Comparison of four CLIC prototype structures Undamped prototype T24 result Damped prototype TD24 result (in operation) CLIC pulse operation Effort to identify trigger source leading to suppress breakdowns 2012/4/182High Gradient Workshop (Higo)

Status of Japan under recovery One year has passed since 11 March, 2011 – Still frequent earthquakes, but frequency decreasing East Japan under recovery – From Tsunami disaster Establish to be safe against Tsunami – Reforming the north-east area Assignment as a special area for science Japan under recovery and reform – Fukushima nuclear plants National trend toward reducing nuclear plants Government approval of restarting operation 2012/4/183High Gradient Workshop (Higo)

Seismic intensity = 6- at Tsukuba on 11 March, 2011 KEK Injector linac at junction between hard and soft Nextef collapse due to non-fixed load 2012/4/184High Gradient Workshop (Higo)

Recent earthquakes in Japan in a week (April 6—13) We still suffer from frequent earthquakes with seismic intensity of 2~3. One of the candidate site of ILC in Japan is located in north-east Japan, no big one in several hundred years. 2012/4/185High Gradient Workshop (Higo)

Status of KEK under recovery One year has passed since 11 March KEK facilities were quickly recovered – J-PARC – Injector linac – ATF, STF, Nextef, …… KEK Tsukuba site strategy – Recovery budget was approved – Recovery with reinforcement against earthquakes – Injector linac is being recovered with various improvement, naturally be suited for SuperKEKB 2012/4/186High Gradient Workshop (Higo)

Normal conducting X-band studies at KEK X-band as a main project of KEK until ITRP 2004 – 60cm accelerator structure to confirm operation at 65 MV/m unloaded Continue high gradient as a basic research for accelerator Join CLIC collaboration – 22cm accelerator structure targeting the operation at 100 MV/m unloaded Continue and go into a stage – To identify the trigger of breakdowns and understand initial processing, operation period, later aging, ….. – Studies to improve initial conditioning and nominal performance and to suppress deterioration through operation The present workshop is one of the step to this end 2012/4/187High Gradient Workshop (Higo)

Nextef facilities KT-1 X-band KT-2 C-band Nextef X-band A B 2012/4/18 8High Gradient Workshop (Higo)

2012/4/18High Gradient Workshop (Higo)9 A B Control RF source Power transfer Nextef

Comparison of four CLIC prototype structures 2012/4/1810High Gradient Workshop (Higo)

CLIC test structures; a series of fabrication and test T18  TD18  T24  TD24 High Gradient Workshop (Higo) T18_Disk_#2 TD18_Disk_# /4/18 T24_Disk_#3 TD24_Disk_#4 undamped damped d d ~12

SLAC/KEK typical fab/test flow Design for CLIC (CERN) Fabrication of parts (KEK) Bonding (SLAC) CP (SLAC) VAC bake (SLAC) High power test (NLCTA- SLAC) High power test (Nextef- KEK) 2012/4/1812High Gradient Workshop (Higo)

13 Difference in processing speed among four structures More BD’s are required for damped!? Why? Can it be reduced? BD’s are essentially needed for processing? T24T18 TD18 TD24 Breakdowns are needed or can be avoided? 2012/4/18High Gradient Workshop (Higo)

Reduced magnetic field 18  24 P (MW), Es (MV/m), Ea (MV/m),  T(C), Sc*50 (MW/mm2) Iris number P Ea Sc Es TT TD18 unloaded 100MV/m 2012/4/1814High Gradient Workshop (Higo) High Eacc and Es and  T TD18 Damped TD24 Damped Reduce  T TD24 unloaded 100MV/m P (MW), Es (MV/m), Ea (MV/m),  T(C), Sc*50 (MW/mm2) Alexej Grudiev

2012/4/18High Gradient Workshop (Higo)15 Undamped T24 3x10 -7 T24 was found much better than T18 Faster processing Reached low breakdown rate

162012/4/18High Gradient Workshop (Higo) Damped TD24#4 at 252ns

Lines are only for guide for eye and drawn all with the same slope as that of T24 at 40 hr. Damped vs undamped /4/18High Gradient Workshop (Higo)

18 More frequent breakdowns in longer pulse Not easy to say only from this figure, but longer pulse makes more frequent breakdowns. Investigate CLIC pulse: effectively shorter pulse. 2012/4/18High Gradient Workshop (Higo)

Nominal CLIC pulse F(CLIC) Rs Tr 2012/4/1819High Gradient Workshop (Higo)

Only 3 breakdowns in 484 hour operation with CLIC pulse at FLT=100MV/m 1.6x10 -7 bpp/m ACC-IN Rs Tr Rs F FC-UPFC-Mid 2012/4/1820High Gradient Workshop (Higo)

CLIC pulse at 110 MV/m till to date 2012/4/18High Gradient Workshop (Higo)21 Operated for 77 hours and encountered 41 ACC-BD. It results in 1.4X10 -5 bpp/m. BD’s are bunched in time. BD’s are mostly associated with first-pulse BD’s. ACC-BD 1 st pulse-BD ACC-IN power

22 TD24#4 BDR with CLIC pulse at FLT=100MV/m 2012/4/18High Gradient Workshop (Higo)

Single-cell studies in preparation or in mind Explore basic research in a simple geometry Center cell is such as the following 1.Standard: KEK made – SLAC test 2.Nominal: Heavily-damped 3.Made of large-grain material 4.Undamped but all-milled 5.All milled quadrant type 6.Choke-mode type 2012/4/18High Gradient Workshop (Higo)23 These are under preparation

Basic study setups /4/18High Gradient Workshop (Higo) High field only at center cell Clean setup Crystal characteristics Damped cell

Preparation of setup in shield-B 2012/4/1825High Gradient Workshop (Higo) Waveguide NEG HEPA GV Cavity

Scanning field emission microscope being under development at KEK 2012/4/18High Gradient Workshop (Higo)26 W-Tip Field emission and surface of crystal characteristics. Capacitance gauge Sample W-Tip PIEZO actuator XY stage

Conclusion Four CLIC prototype structures have been tested, each for a few thousand hour scale. Improved performance was given with TD24 type. CLIC pulse operation met the required BDR for CLIC at FLT=100MV/m. Basic research area is under construction, expecting to start test in a month or so. All of KEK members suffer from the huge work for SuperKEKB until the commissioning in We want to keep the basic research activity. We also want to consider a klystron based compact LC for Higgs. We want to expand X-band based applications, but after SuperKEKB. 2012/4/1827High Gradient Workshop (Higo)