04 Feb 03 Shutdown Activities Cryostat warm-up –Dilute contaminates Use purer helium on cooldown –Thermal stress test for cassettes –Move cassette from.

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

TEC X5 Setup (1) 1 Front + 1 Back petal, fully equipped (28 modules F.P modules B.P. + AOH + DOHM) Petal assembly IPN-Lyon (F.P.), RWTH-Aachen I.
6890 GC Detectors - The Flame Ionization Detector
1. 2 Maintenance & Troubleshooting 3 Maintenance Three-monthly checks Carry out the following checks every three months: check the power supply; check.
Bagby L0 Workshop L0 Infrastructure  Mapping  Installations u Horseshoe Area s Adapter Card u Cathedral s Low Voltage Fuse Panel u Platform s.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
First Results from Tracker 1  Cryostat Commissioning  AFE/VLSB Firmware and Readout  Cosmic Ray Setup  Tracker Readout  Software  Trigger Timing.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 4 August 2003 Sam Burke UCSB HEP Group.
DAQ System  We need to build a clone of the new test stand DAQ that is being put together at D0.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
Cryo and AFE IIt Update MICE Collaboration Meeting October 22, 2005 RAL A. Bross.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 30 June Sam Burke UCSB HEP Group.
2005/10/22 MICE CM at RAL, Tracker Parallel, Makoto Yoshida 1 KEK test beam - introduction - M. Yoshida MICE CM tracker parallel 2005/10/ /10/22.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
Tracker 2 Cryo &Electronics Update Linda Coney, UC Riverside Terry Hart, U Mississippi Ben Freemire, IIT Malcolm Ellis, Brunel University ADB MICE Collaboration.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 17 June Sam Burke UCSB HEP Group.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
Fiber, Ribbon Production and Cryo Update Alan Bross Tracker Phone October 26, 2006.
SSD Operations Manual March 2014 SSD: 4 th layer of vertex detector Heavy Flavor Tracker Silicon Strip Detector – Operations Manual PXL Inserted from this.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
Cryo Update and Power Distribution Alan Bross Tracker Parallel – MICE CM October 7, 2007.
High Sensitivity Smoke Detection
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
Status of COBRA Magnet Wataru OOTANI MEG review meeting July 11 th, 2003 PSI Switzerland.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
FEE LVPS 1. INTRODUCTION This section describes the Low Voltage Power Supplies (LVPS) for the TPC FEEs and RDOs. Plans currently call for all of the old.
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
January 22, 1999SciFi L1 Trigger Review 1 Analog Hardware Front-end Board (CTT_FE) –Transmit (and split) the VLPC signal to the Multi-chip Modules –Discriminate.
1 Online Calibration of Calorimeter Mrinmoy Bhattacharjee SUNY, Stony Brook Thanks to: D. Schamberger, L. Groer, U. Bassler, B. Olivier, M. Thioye Institutions:
NIU Trigger Workshop CTT Commissioning Trigger Workshop October 22, 1999 WBS & Presented by Fred Borcherding for the D0 Electronics Group.
LSST Electronics Review – BNL, January LSST Electronics Review BNL January Electronics Development Plan Goals and Plans for
10 Dec 02 CFT+PS Week in Review CFT_Gui broadcasts limited Calibration/DataBase issues Grounding changed on 6 AFEs Two AFEs replaced –SIFT gain variation.
Codan 5700 Series C-Band Transceiver Technical Overview.
Tracker Summary Alan Bross MICE CM October 10, 2007.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
7 Jan 03 CFT+PS Weeks in Review Sequencer status –1553 communications issues may not be fully resolved –scanning still off Calibration –calibration database.
Andy Blue Glasgow Update. Andy Blue WP3 Meeting Summary ESD Protection –Part all arrived and installed Compressed Air Controls –New lines and panel being.
17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 February Dedicated some.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
CERN Single Phase Prototype Initial Discussion on Power/Space Requirements Terri Shaw Neutrino Platform July 30, 2015.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
PS VFE & PS/SPD FE Electronics Status and Plans 16 January 2008 LPC Clermont.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
February 24, DØ’s VLPC Detectors: The Fiber Tracker and Preshowers Greg Davis University of Rochester.
FPD STATUS Carlos Avila Uniandes/UTA 1. FPD overview 2. Roman pot and detector status 3. FPD readout integration status 4. Software status 5. Stand-alone.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
D. Lincoln Run II MTG May 12, Y2K What will it take to get data out of the CFT?* Don Lincoln CFT Commissioning Czar Fermilab Run II Meeting May 12, Y2K.
FNAL All Experimenters Meeting June 24, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Operations June 17 – 24, 2002  Notable “features”
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
Tracker Readout Progress Terry Hart, MICE Tracker Meeting, July 29, 2008 Cosmic Ray Readout with 1 st Tracker at RAL 2 nd Tracker Preparation at FNAL Firmware.
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
L1Calo News Activity Summary, Run coordination and Operation Planning Bruce M. Barnett Rutherford Appleton Laboratory.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
S A Griffiths CM42 June 2015 Electrical & Control.
Task T6.2 Tertiary Buildings infrastructures installations
GC Trouble shooting.
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
LKr status R. Fantechi.
For residential and commercial heating and air conditioning units
Track Finder Crate, Backplane and Parts
Presentation transcript:

04 Feb 03 Shutdown Activities Cryostat warm-up –Dilute contaminates Use purer helium on cooldown –Thermal stress test for cassettes –Move cassette from slot 102 to slot 101 –West cryostat at 6.5K (was 6.3K) –East cryostat at 6.1K (was 5.5K) LED pulser upgrades FPS waveguide studies and moves CPS mapping studies Readout Firmware Updates –SEQC/SEQ for tick –AFE for tick, clockgen, and 1553 –High rate scanning tests Trigger –Hardware upgrades Transition boards Power supplies –Firmware upgrades –Continuing commissioning/testing FPD “cassette” installation Installation of table top between cryostats

04 Feb 03 Thermal Stress Test Warmup began 13 Jan Most cassette module heaters started turning on about 17 Jan after 1800 Cold block temperatures rising at about 0.4K per hour Turned off on 19 Jan at about 1800 Roughly 38 hours at full heater power of 1.6 watts per cassette Cold blocks averaged about ~322K Isotherms estimated to reach ~325K Hybrid assemblies oven cured at 339K 8 fiber plug assemblies cleaned at 308K Polystyrene deformation temp 355K Visual inspection of assembled modules reveals no surprises Lost contact with 13 heaters and 2 temp sensors VLPCs remain sensitive to light

04 Feb 03 To Be Studied Continue testing seq scanning Between stores occupancy Split peds Pedestal variation versus tick number Check status of pdaqexamine results –Tick –Data integrity –DB4/5 FPD calibration Smoke detectors on platform –test and optimize smoke detectors

04 Feb 03 To Be Addressed? Complete installation of DB4/DB5 1A2 download problems New VRBC firmware CPS personality –CPS stereo installation –CPS axial development/installation LED pulser –Additional pulser boards –Remote control for 5V power –Software enhancements –Address coupling between boards CPS link issues Optimize AFE installation Alarms updates –Invalid data Individual pixels that suffer from breakdown Crate x53 VRBC replacement

04 Feb 03 To be Addressed? Enclose back of rack PC19 Power supply issues –PS-2-B/+33V readback problem (151969) –measure backplane voltages? –calibrate Vicor voltage readouts? –separate CFT+PS from CAL BLS supply swaps AFE cooling enhancements? –Double wide air dams for special locations –tighten ductwork –Air filter retainers? Enhance protection of LVDS cable plant –LVDS strain relief? Close-up –Verify bayonet installations –Verify AFE map and SEQ fibers –Replace AFE fan filters LED studies