Complexity Challenge Status Erno DAVID Wigner Research Center for Physics (HU) 26 January, 2016.

Slides:



Advertisements
Similar presentations
Substantive Change Requesting Commission Approval of Substantive Changes at Institutions MSCHE Annual Meeting December 2009.
Advertisements

UC’s Electronic Resources Management System Users Council, May 11, 2007 Heather Christenson.
Common Management System – CMS “CMS Status & Future” 1 Financial Officers Association April 2004 “CMS Status & Future” William Griffith Vice President,
Special Education Director Meeting February 18, :30pm.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
Asper School of Business University of Manitoba Systems Analysis & Design Instructor: Bob Travica System implementation and deployment Updated: November.
1 Tell10 Guido Haefeli, Lausanne Electronics upgrade meeting 10.February 2011.
The 22 nd meeting of the INTOSAI Working Group on IT Audit (WGITA) KPI Project Final Report — Key Performance Indicators Methodology for Auditing IT Programs.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Calorimeter upgrade meeting Olivier Duarte Upgrade calo FE review Comments : Digital.
OFED 1.x Roadmap & Release Process November 06 Jeff Squyres, Woodruff, Robert J, Betsy Zeller, Tziporet Koren,
FLP data flow – FLP prototype Filippo Costa ALICE O 2 9 th June 2015 WUHAN, CHINA.
Computer Technology 7 Group/Individual Work on:. Instructions for Research  Work by groups or individually on your assigned topic.  Do not put in too.
University of Maryland Bug Driven Bug Finding Chadd Williams.
ALICE O 2 Plenary | October 1 st, 2014 | Pierre Vande Vyvre O2 Project Status P. Buncic, T. Kollegger, Pierre Vande Vyvre 1.
Why does my perfectly working App Crash and Burn in Production? Matt Kramer Project Manager, STL Boeing Scalability Test Lab cell.
SMART METER TEXAS Status Update June 3, AGENDA Release 1 Smart Meter Texas Online Portal Update – SMT Solution Update – Registration Statistics.
Stephen Booth EPCC Stephen Booth GridSafe Overview.
GBT Interface Card for a Linux Computer Carson Teale 1.
 Mathias Dutour / UAB Dev. team  UNICOS regular meeting  29 January 2009.
CINT C++ Interpreter update ROOT2001 at Fermi-Lab Masaharu Goto.
Weekly Report By: Devin Trejo Week of July 6, 2015-> July 12, 2015.
Presented by Jubin MITRA
GBT SCA overview Slide 1-5 Work status Slide 6-10 Shuaib Ahmad Khan.
Clara Gaspar, July 2005 RTTC Control System Status and Plans.
1 SICBDST and Brunel Migration status and plans. 2 Migration Step 1: SICBMC/SICBDST split  Last LHCb week: Split done but not tested  Software week.
Making the System Operational Implementation & Deployment
SunGuide SM Software Development Project End of the Year ITS Working Group Meeting December 7, 2005.
GBT-FPGA Interface Carson Teale. GBT New radiation tolerant ASIC for bidirectional 4.8 Gb/s optical links to replace current timing, trigger, and control.
MND review. Main directions of work  Development and support of the Experiment Dashboard Applications - Data management monitoring - Job processing monitoring.
A. KlugeFeb 18, 2015 CRU form factor discussion & HLT FPGA processor part II A.Kluge, Feb 18,
Clara Gaspar on behalf of the ECS team: CERN, Marseille, etc. October 2015 Experiment Control System & Electronics Upgrade.
CRU Weekly Meeting Erno DAVID, Tivadar KISS Wigner Research Center for Physics (HU) 18 November, 2015.
Susanna Guatelli Geant4 in a Distributed Computing Environment S. Guatelli 1, P. Mendez Lorenzo 2, J. Moscicki 2, M.G. Pia 1 1. INFN Genova, Italy, 2.
Firmware Overview and Status Erno DAVID Wigner Research Center for Physics (HU) 26 January, 2016.
Ken Wyllie, CERN Tracker ASIC, 5th July Overview of LHCb Upgrade Electronics Thanks for the invitation to Krakow!
Object Oriented reconstruction of the CMS muon chambers CHEP February, Padova Annalina Vitelli - INFN Torino.
Pavel Nevski STAR analysis meeting October 22, 2002 Status of STAR Detector Simulations Pavel Nevski BNL Standard setup Standard setup New detectors Next.
INFSO-RI Enabling Grids for E-sciencE gLite Test and Certification Effort Nick Thackray CERN.
CC System CCIMOINV NEW REVISED CCIMOINV SCHID: CALENDAR: WD DESCRIPTION: SCHID 1 - Runs 1st working day of January. SCHID 2 - Runs 1st.
Common Readout Unit (CRU) – A New Readout Architecture for ALICE Experiment Jubin Mitra VECC, Kolkata, India For the ALICE Collaboration.
TPC CRU Jorge Mercado (Heidelberg) Ken Oyama (Nagasaki IAS) CRU Team Meeting, Jan. 26, 2016.
Beam Secondary Shower Acquisition System: Igloo2 GBT Starting with LATOP version Student Meeting Jose Luis Sirvent PhD. Student 16/06/
ARDA Massimo Lamanna / CERN Massimo Lamanna 2 TOC ARDA Workshop Post-workshop activities Milestones (already shown in December)
PROCStar III Performance Charactarization Instructor : Ina Rivkin Performed by: Idan Steinberg Evgeni Riaboy Semestrial Project Winter 2010.
GLAST Science Support Center May 8, 2006 GUC Meeting AI#28. SAE Release Schedule David Band (GSSC/JCA-UMBC) Julie McEnery (GSFC)
FTK high level simulation & the physics case The FTK simulation problem G. Volpi Laboratori Nazionali Frascati, CERN Associate FP07 MC Fellow.
PC-based L0TP Status Report “on behalf of the Ferrara L0TP Group” Ilaria Neri University of Ferrara and INFN - Italy Ferrara, September 02, 2014.
Status of CRU FW Resource Estimations Erno DAVID Wigner Research Center for Physics (HU) 10 March, 2016.
Content Management: What Is It and Why Should You Care?
Scalable Readout System Data Acquisition using LabVIEW Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer]
LIU Configuration Management EDMS Documentation, Layout and ECRs This presentation follows the LIU-PSB specific presentation done on 9 th October 2014.
CALIBRATION: PREPARATION FOR RUN2 ALICE Offline Week, 25 June 2014 C. Zampolli.
GBT-FPGA Tutorial Introduction 27/06/2016GBT-FPGA Tutorial – 27/06/20161.
Firm SCALE Mid-term Report. What happened in the past 2 weeks Improved landing page design & code Better front-end visualization with chart feature More.
IN THIS Slide show YOU WILL LEARN ABOUT ALL VERSIONS OF "MS OFFICE"
M. Bellato INFN Padova and U. Marconi INFN Bologna
Use of FPGA for dataflow Filippo Costa ALICE O2 CERN
GBT-FPGA 120 MHz Modification Status
DCS Status and Amanda News
RCE Application Workshop
Status and Plans for InCA
PANDA collaboration meeting FEE session
Erno DAVID, Tivadar KISS Wigner Research Center for Physics (HU)
CRU Development Platforms
Erno david , Shuaib Ahmad Khan
Fix Yahoo Mail Error Code 475
Effective Solution To Fix Outlook Error Code in Mac Verification of the Account Settings Resetting the Authentication Mode Change the SMTP Port.
Vincenzo Innocente CERN/EP/CMC
Making the System Operational Implementation & Deployment
The Transformation of A Small Company Into A Golden Legend
Presentation transcript:

Complexity Challenge Status Erno DAVID Wigner Research Center for Physics (HU) 26 January, 2016

2 Complexity Challenge Status (History) April 2015: First CC design (x24 GBT links, 1920 FIFOs, dual x8 PCIe DMA) The result – The design can be fitted into Arria 10 But this was based on a code base which is now obsolete July 2015 (1 st CRU Workshop): Our new Arria 10 GBT-FPGA port is ready Decision to rebuild the CC design and develop a more accurate “dummy cluster finder” logic with the TPC team November 2015: First release of the new core CRU framework with x24 GBT links, x1 TTS link, x2 PCIe x8, the User Logic part contains just a skeleton (there is no dummy CF inside) January 2016: It become evident that the GBT-FPGA resource usage is not realistic (it is too low)

3 Complexity Challenge Status (Current and Next Steps) Current Steps: We are investigating the issues and working on the solution We have promising results in a standalone projects where the GBT-FPGA resource usage looks more accurate The results will released after integration with the core CRU framework and double checking Next Steps: Fix the x24 version and check the resource usage Extend the design to x48 version and check the resource usage Rebuild the x48 design with GBT-FPGA Rx in Wide Bus mode Apply additional optimizations (like only x10 Tx and x40 Rx) Comments: One of the main design goal of the common CRU framework is to allow parallel work between the core CRU team and the detector teams The core CRU framework is under development (currently there is no GBTx, GBT-SCA, CRU control, TTS, raw GBT payload recorder and PICe DMA aggregator code) Expected in 1–2 weeks Requires more time and depends on the previous results