M1 Central Part Cable Routing R3 FAR R2 CLOSE R2 FAR + GEM A3 B From chain GEM R2 CLOSE R2 FAR 20 18 16 14 14 A1 20 A1 A1 A2 A CHAIN Access Front Dané.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

P u t y o u r h e a d o n m y s h o u l d e r.
Winter shutdown 08/09 Summary of HV interventions Barrel Muon Workshop, 02/09 Jesús Puerta-Pelayo, CIEMAT 17-February-2009.
© 2012 Delmar, Cengage Learning Automotive Plumbing: Tubing and Pipe Chapter 24.
EMB PAR, 23 nov P. Perrodo, LAPP, Annecy1 ATLAS EMB SERIE MODULE CABLING Experience started with three successive prototype modules (module 0) in.
02-Mar-09A. Cardini / CERN & INFN1 Muon Detector Status (week 9: Feb 23 rd  Feb 27 th ) Present: Ale, Thomas, Nikolai, Oleg, Sasha, Maria Luisa, Perluigi,
Observations and next works from the recent tests of the insertion tools of Mini-Drawers at CERN Roméo Bonnefoy and François Vazeille Tilecal Operation.
PKI-Anwendungen 6/2/ Base framework. PKI-Anwendungen 6/2/ Bottom frame.
1 Daya Bay Muon system Installation Workshop, IHEP, July 14, Updated RPC Gas System Installation Plan Changguo Lu Princeton University.
1 Daya Bay Muon system Installation Workshop, Daya Bay, March 22, Daya Bay RPC Gas System Installation Plan Changguo Lu Princeton University.
Walls crates cables gas chambers electronics CERN adb.
Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.
EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 1 TT installation Installation of the TT station.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
INTRUSION ALARM TECHNOLOGY
MUON piquet report 18/9 -24/ Nikolai Bondar.
Preparation of wall position Alignment of A and C side in closed position Creation of reference system Translation of reference system to open position.
Challenges and Overview From Technical Coordination 27/08/2013 -FH1.
GE1/1 Services and Strips PCB Andrey Marinov On behalf of CMS GEMs collaboration.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
Some questions:  In which order cables will be put ?  Who, where will put PS signal cables in bundles ?  Which kind of cable binders: velcro or panduit.
Itzhak Tserruya, BNL, Aug. 11, Itzhak Tserruya Weizmann Institute, Israel BNL, Upgrades Meeting, Aug. 11, 2004 HBD: Infrastructure and Integration.
r1Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling YB+2 and YB+1, extension to minus wheels and YB0, cables between UXC55 and USC55.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
1 B. Braun SpaceStation – Product details Overview Flexibility in use Typical configurations.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
SPD cabling issues I.Cable status II.Cabling inside VFE box III.Cable through chains (Gael) IV.Data spare cables V.Control bundles VI.Information for cabling.
MINER A Operations Report All Experimenters’ Meeting Steve Hahn, FNAL July 1, 2013.
From Bare Chambers to Installable Chambers Muon Barrel Week Bologna April 11 th 2003 Alberto Benvenuti INFN Bologna.
End-of-stave region. 2 Space Z-dimension is critical –Keep gap small (might help getting rid of stubs) Edge of last barrel silicon (at corner) is 1277.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
Services in GIF++ A pictorial record of the work HV Cables LV cables DCS cables Signal Cables Ian Crotty 17 Dec 2014.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Strategic Marketing ICU&OR Systems Nov 13, 2003 Chapter Sales Manual B.Braun Space Chapter 5.3  Overview  Flexibility in use  Typical configurations.
V. Bobillier1 Cable installation status.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
Update on the M1 schedule Muon Meeting March 23, 2009 Burkhard Schmidt.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
T. Hajer Brahim & T. Rania Alakazalah U.Y: 1435/1436 H.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
Central Tracker Cabling and Mechanics Paola Gianotti26/4/111.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
9 September 2015 VXD Mechanics Summary Markus Friedl (HEPHY Vienna)
Cabling for LHCb Upgrade
Service channels between Tracker and PP1
Service channels between Tracker and PP1
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
Services – First Considerations Sigi Wenig / Nicolas Massol ATLAS Tracker Upgrade Workshop Valencia December 2007 Existing services (in cryostat.
G. Carboni for the Muon Group
First of all we will remind some numbers:
Initial BIS installation
LST Module Installation
CSC Electronics Installation and Commissioning CSCE I&C
General wiring procedure for a new instrument
Reader Swap out Guide.
CSC Electronics Installation and Commissioning CSCE I&C
Presentation transcript:

M1 Central Part Cable Routing R3 FAR R2 CLOSE R2 FAR + GEM A3 B From chain GEM R2 CLOSE R2 FAR A1 20 A1 A1 A2 A CHAIN Access Front Dané - Muon Meeting – Dec 18th 2008

18A1 18 A3 Last week 3 chambers were installed by me, Gianni B., Fabrizio, Marco and Alessandro C. on row 18 of Access Front: 18A1 (gem), 18A2 (gem), 18A3 (R2). Three main difficulties: 1.Positioning and cable connection of the gem 18A1: the space between RICH and M1 is tight.; 2.Connection of the gem 18A2: this gem has the connectors in front of the wall; 3.The final part of the gem cables are not flexible due to the presence of the plastic tube covering the labels. RICH 2 18A2 connectors Dané - Muon Meeting – Dec 18th 2008

Things to do for the central part cabling and installation chambers Arrange cables and install chambers should be done at the same time: The wall should be in open position for at least 7-8 working days per quadrant for 2 people (installation + cabling); GEM gas pipes, on chamber, are actually too long; Table of the chamber position (X and Y): reference on the Al bar; A tool for the installation of the GEM 18A1 (not easy to reach): Marco Pistilli is working on this; Upper and bottom balconies installed; The cables of the GEM must be more flexible, it means that the transparent tube to protect the labels should be removed and shifted back; Other tasks: 8 HV cables (connecting the R2 chambers) have the piece of cable between the two connectors, too short; Install the LV GEM cables. Dané - Muon Meeting – Dec 18th 2008