FPD Cable Routing LIST OF MATERIALS: PW08 Movable Counting House Truss 70 Ribbon Cables 56 Ribbon Cables 2 Reynolds HV cables HV Fan in 4 Reynolds HV cables.

Slides:



Advertisements
Similar presentations
Excellence in Connectivity Solutions Author | Name of the presentation | Date |1 MPO-Solutions for LISA.
Advertisements

1 Part II Proposition of locations of cable trays.
LECC V. Bobillier1 Overview of LHCb Electronics installation aspects V. Bobillier; L. Roy; J. Christiansen CERN - LHCb.
L1 => L2 Optical Network Patch Panel Update Tim Durkin STFC RAL 03/04/2014.
04/02/2004 az Outer Tracker Distribution Boxes 1 EFNI H K Outer Tracker Distribution Boxes Ad Berkien Tom Sluijk Albert Zwart.
July 10, 2008 PHENIX RPC review C.Y. Chi 1 RPC Front End Electronics On chamber discriminator  The strips  The CMS discriminator chips  The discriminator.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
Update on FMS Repair Stephen Trentalange STAR Management Meeting October 31,
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
1 Exercise 1 Computer Hardware. 2 Objectives for Exercise 1 When you complete this exercise, you will be able to:
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
4 Amp Load.500 Hard Line Cable SPSM 2 P/S Setup Configuration RF Signal Supplied by RG-6 RF Signal To TV via RG-6 Remove Central Fuse Move 20A fuse from.
Off Detector Electronics System [LNF-INFN] 1 Off Detector Electronics System Fan Unit ODEODE 1 ODEODE 2 ODEODE 3 ODEODE 4 ODEODE 5 ODEODE 6 ODEODE 7 ODEODE.
Readout electronics for the MUV detectors R. Fantechi 28/3/2012.
D2 P 2Q Q4Q4 S Q2Q2 Q2Q2 Q3Q3 Q3Q3 Q4Q4 S A1I A2I P1DP2D D1 FPD OVERVIEW p P_bar.
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
FPD FPD STATUS JORGE MOLINA CBPF February FPD  10 detector cartridges have been installed: 8 in the vertical plane, 2 at Dipole locations  We.
Hall A DVCS calorimeter Operation Safety procedure September 18 th 2014 Alexandre Camsonne DVCS Readiness Review.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
PMT HV Base Prototypes Evaluation Instrumentation Workshop LBNL July 23-24, 2003 Nobuyoshi Kitamura University of Wisconsin-Madison SSEC.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Towards a final design of LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
1/12/2010 R. CIARANFI 1 NEW NINO BOARD FOR RICH OLD AND NEW LOGISTIC NEW BOARD DESCRIPTION NEW MODULARITY 32 CH NEW FORM FACTOR FRONT END AREA AND DAQ.
SPD cabling issues I.Cable status II.Cabling inside VFE box III.Cable through chains (Gael) IV.Data spare cables V.Control bundles VI.Information for cabling.
7/28/2003DC/EC Review Aerogel Read out Electronics K. Ozawa, N. Kurihara, M. Inaba, H. Masui T. Sakaguchi, T. Matsumoto.
Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.
Legend SL3 RR C006 National Instruments MID-7604 Proton Motor Controller RR C006 Channel 1  45° X-Y Mirror Hor. Channel 2  90° X-Y Mirror Hor. Channel.
Design of High Voltage System Kyungju Ma & Reno Collaboratiors
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
FPD Status and Plans Andrew Brandt UTA Q4 D S Q3S A1A2 P 1 UP p p Z(m) D1 Detector Bellows Roman Pot P 2 OUT Q2 P 1 DN P 2 IN D2 Q4Q3Q2.
FPD STATUS Carlos Avila Uniandes/UTA 1. FPD overview 2. Roman pot and detector status 3. FPD readout integration status 4. Software status 5. Stand-alone.
FNAL All Experimenters Meeting June 24, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Operations June 17 – 24, 2002  Notable “features”
FPD Status and Data Quality Andrew Brandt UTA Q4 D S Q3S A1A2 P 1 UP p p Z(m) D1 Detector Bellows Roman Pot P 2 OUT Q2 P 1 DN P 2 IN D2.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
Solid State Driver Upgrade Update 1kW Solid State Amplifiers – 32 have been tested and calibrated. – 50 have been built so far. Small heat sinks for the.
04 Feb 03 Shutdown Activities Cryostat warm-up –Dilute contaminates Use purer helium on cooldown –Thermal stress test for cassettes –Move cassette from.
MuTRG Channel map summary June 30, 2008 Tsutomu Mibe KEK 1.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
By Daniel Arthur. Checklist Cover Power Supply CD ROM Floppy Hard Drive Cables CPU Fan Mother Board RAM CMOS Battery CPU Video Board Audio Board Computer.
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
CuOF towards the Production Certification Tests 4/9/131 D. Dattola, P. De Remigis, S. Maselli, G. Mazza, G.Ortona, G.L. Pinna Angioni, F. Rotondo, R. Wheadon.
Calibration and monitoring system for FPD to check the response of the MAPMT and L0PMT as it involves in time ( + to see if we have any dead channels +
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
Veto Readout Electronics-The Big Picture
NA62 RICH ELECTRONICS LOGISTIC Part 2 R. Ciaranfi 25/05/2011.
PMT cabling Gian Luca Raselli INFN Pavia
Buffer CABLES routing proposal
HPS Motherboard Electronic Design
Electronics for RPC Upscope
SHMS "pivot-patch" cable run Experiments: NPS, LAD(?), CGEN(?)
S12X Full-Emulator: Pictures of the Emulator Hardware
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
SPD cable length and rack location
HCAL HV splice box.
Testing of the EMCO Prototype Boards
RPC Front End Electronics
Dzero Collaboration Meeting Sep. 22, 2004
Particle detection configuration
RPC Electronics Overall system diagram Current status At detector
The D0 Forward Proton Detector (FPD) Status
Digitally subtracted pulse between
TOF & BB FEE Safety Review
Presentation transcript:

FPD Cable Routing LIST OF MATERIALS: PW08 Movable Counting House Truss 70 Ribbon Cables 56 Ribbon Cables 2 Reynolds HV cables HV Fan in 4 Reynolds HV cables PMT Cables Truss 18 PMT cables 10 PMT cables Patch Pannel Patch Pannel AFE Boards Proton Side Pbar Side 8 PMT cables HV Fan out 13 RG58 HV cables HV Fan out 10 RG58 HV cables 2 Reynolds HV cables LMB Cables Patch Pannel 5 RG58 cables 2 RG58 cables 3 RG58 cables MCH 308 MCH 115 MCH 222

D2D2 D1D1 P2OP2O P2IP2I P2DP2D P2UP2U 4:1 split Fanout to HV 8 ch. cable P1OP1O P1IP1I P1DP1D P1UP1U 4:1 split Fanout to HV 8 ch. cable A1OA1O A1IA1I A1DA1D A1UA1U 4:1 split Fanout to HV 8 ch. cable A2OA2O A2IA2I A2DA2D A2UA2U 4:1 split Fanout to HV 8 channel cable 2:1 split Fanout to HV 8 ch. cable Fanout to HV 8 channel cable HV Power Supply mother board with 7 pods HV Power Supply mother board with 8 pods HV Power Supply mother board with 8 pods 8 HV RG58 cables3 HV RG58 cables5 HV RG58 cables FPD High Voltage Supply and Cables 3 DZERO HV Supply mother boards located at MCH M DZERO HV Pods to be installed in the 3 HV motherboards 4 DZERO HV Fanout unit located above motherboards on M222 4 DZERO HV Fanout unit located on FPD racks inside Tevatron 4 HV 8-channel cables from M222 to FPD stations - 80 to 100 m each 64 HV RG58 cables with HV BNC connectors ( see table for the diferent lengths) LIST OF MATERIALS: 8 channels used5 channels used HV 8 channel cables 2 HV RG58 cables5 HV RG58 cables Tevatron anti proton sideTevatron proton side

MCM1-2 PW8PW2PW3 7 PMT 112 channels AS PU2 PD1 PD2 PU1 Flat cables PU1[1:112] PU2[1:16] MCM3-4 PD1[1:32] PU2[17:112] MCM5-6 MCM7-8 PD1[33:112] AD2[1:48] AD2[49:112] AS PO2 PI1 PI2 PO1 PO1[1:64] PO1[65:112] PO2[1:80] PO2[81:112] PI 1[1:96] PI 1[97:112] PI 2[1:112] AFE 1 AS D1 D1 [1:112] MCM1-2 MCM3-4 MCM5-6 MCM7-8 AFE 2 MCM7-8 AS AI2 AI1 AO2 D2 D2 [1:112] AU2[1:16] MCM5-6 AU2[17:112] AD1[1:32] MCM3-4 MCM1-2 AD1[33:112] AS AD2 AD1 AU2 AO1 AO1[1:64] AO1[65:112] AO2[1:80] AO2[81:112] AI 1[1:96] AI 1[97:112] AI 2[1:112] AFE 4 AS AU1 AU1[1:112] MCM7-8 MCM5-6 MCM3-4 MCM1-2 AFE PD2[49:112] PD2[1:48] AIAOAIAO DFE 2 ADAUADAU PUPDPUPD DFE 1 POPIPOPI DAUGHTER BOARDDAUGHTER BOARD DFE3DFE3 T R I G. M G R TEVATRON LVDS Cables FPD L1 Trigger

FPD Cable Routing LIST OF MATERIALS: PW08 Movable Counting House Truss 70 Ribbon Cables 56 Ribbon Cables HV Fan in 2 Reynolds HV cables 13 RG58 HV cables HV Fan in 2 Reynolds HV cables (Pbar) PMT (Prot) PMT Truss 8 PMT cables 10 PMT cables HV Fan out Patch Pannel Patch Pannel HV Fan out 10 RG58 HV cables AFE Boards Proton Side Pbar Side