Georgina Harris 11 th October 2007 2 nd SKADS Workshop – Observatoire de Paris 2-PAD Infrastructure Georgina Harris SKADS System Design and Team Leader.

Slides:



Advertisements
Similar presentations
Construction Method, Material Selection & Building Services
Advertisements

SM. FlexPod site readiness assessment services verify that all required Layer 1 Physical Infrastructure items are in- place, properly installed, and correctly.
Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
Undergraduate Renewable Energy Courses and Certification Tests John Martini University of Arkansas – Fort Smith ASSET II Annual Meeting Springdale, AR.
Paul Alexander DS3 & DS3-T3 SKADS Review 2006 DS3 The Network and its Output Data Paul Alexander.
Update on Measurements and Simulations at Cambridge: SKALA element + LNA Eloy de Lera Acedo Nima Razavi Ghods Cavendish Laboratory University of Cambridge.
Schediwy: Advantages and Disadvantages of Sparse Aperture Arrays Fermilab: October 2009.
CERT MEOC Mobile Emergency Operations Center Concept designed by Keith Morin & Associates - Tucson, AZ.
HYDROFORMING PROCESS SHORT DESCRIPTION DVA1 Meeting at NSF Arlington VA April 15-16, 2010 Matt Fleming Contributions from John Andersen.
Keeping It Cool! Written by Laura Blackburn K-5 Educator.
SKA South Africa Overview Thomas Kusel MeerKAT System Engineering Manager April 2011.
System designAA Consortium - BolognaOctober 2012 AA Consortium AA System configuration options 23 October 2012.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
Dec 2010 AAVP Cambridge workshop AAVP AAVS1/2-low demonstrators Jan Geralt Bij de Vaate.
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
Name1 title 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Progress in Active Antenna Design and Developement - FIDA3 Timothy Finn FG-IGN
Name1 SKA(DS) System Design Aspects 4 th SKADS Workshop, Lisbon, 2-3 October 2008 SKA(DS) System Design Aspects: building a system Laurens Bakker.
Chris Shenton1 DSP Technology Options 4 th SKADS Workshop, Lisbon, 2-3 October 2008 DSP Technology Options Matching The Technology Platform To The Instrument.
SKA Pre Construction Phase Infrastructure Tracy Cheetham Carel van der Merwe General Manager: Infra & Site OpsInfrastructure System Engineer
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
ANCIT WORKSHOP Torino March Access Network in EURESCOM Projects, and the P614 Project Umberto Ferrero CSELT (P614 Project Leader) Participants.
AIDA FEE64 production report June 2011 LYCCA tests and MBS Production of FEE64 Preparation for October test. 13th June
Section 11.1 Identify customer requirements Recommend appropriate network topologies Gather data about existing equipment and software Section 11.2 Demonstrate.
Georgina Harris1 2-PAD 4 th SKADS Workshop, Lisbon, 2-3 October Polarisations All Digital Dr Georgina Harris / Prof Tony Brown SKADS System Design.
2 © 2005 OSIsoft, Inc. – Company Confidential Paul Ireland Manager – Information Engineering, RWE npower Technology Services P I.
Keeping It Cool! Presented by the MathScience Innovation Center.
23 rd World Gas Conference 5 – 9 June 2006 Amsterdam Full Scale Qualification Trials and Certification of the AMPLITUDE-LNG LOADING SYSTEM Phillip COX.
Eloy de Lera Acedo 2 nd SKADS Workshop October 2007 DS4T4 Differential Dual Polarized Antenna Array Design - Eloy de Lera Acedo - Research Associate.
SKA Introduction Jan Geralt Bij de Vaate Andrew Faulkner, Andre Gunst, Peter Hall.
S. Montebugnoli 2 nd SKADS Workshop October 2007 Stelio Montebugnoli IRA - INAF- Italy.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
Investigating EMC policies for the SKA Paul van der Merwe Prof. HC Reader Stellenbosch University.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Tim Ikin 11 th October ND SKADS Workshop 2-PAD Analogue Front End Tim Ikin Electronics Engineer 2 nd SKADS Workshop Paris 11 th October 2007.
Philippe Picard1 System Design 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Aperture Arrays system design Front end RF combining: an efficient way to.
André van Es 2 nd SKADS Workshop October 2007 Review on Deliverables and forward look André van Es.
Andrew Faulkner1 Technology Readiness Levels 4 th SKADS Workshop, Lisbon Technology Readiness Levels TRLs Andrew Faulkner.
Rosie Bolton1 SKADS Costing work 4 th SKADS Workshop, Lisbon, 2-3 October 2008 SKADS Costing work: Spreadsheets to scalable designs Rosie Bolton Dominic.
2 nd convergence workshop: introduction R. T. Schilizzi Penticton 22 July 2004.
AAs in PEP Jan Geralt Bij de Vaate. PEP Project Execution Plan for the pre construction phase of the SKA Consortium to be formed AA-low ready for construction.
SKA System Design Kobus Cloete 9 December 2010 AAVP Workshop "Exploring the Universe with the world's largest radio telescope"
Electromagnetic Design of Broadband Antenna Feed Systems for the Northern Cross Radio Telescope (Bologna, Italy) Designed Broad Band Antenna Feed Systems.
Andrew Faulkner 2 nd SKADS Workshop October 2007 SKADS Benchmark Scenario Andrew Faulkner.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
System designAA Consortium - BolognaOctober 2012 AA Consortium The path to AAVS1 22 October 2012.
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
Andrew Faulkner1 DS4 Deliverables 4 th SKADS Workshop, Lisbon DS4 Deliverables Andrew Faulkner.
Roshene McCool SKADS Workshop 2007 DS3 – T1 Network Infrastructure and Data Transmission Roshene McCool Simon Garrington University of Manchester.
Rosie Bolton 2 nd SKADS Workshop October 2007 SKADS System Design and Costing: Update and next steps Rosie Bolton University of Cambridge.
Contents Jason Tarrant STFC Aim of Presentation to show: l Problem of compressors located at south shield wall l Description of compressor layout and services.
Investigation into the Mounting of the 3M BRCP Splitter Blocks in the Whisper Cabinet 24 October 2008.
High Granularity Calorimeter Workshop Ideas for cooling of a high granularity calorimeter Nick Lumb, IPN-Lyon 02/02/2015.
High Temperature Superconducting (HTS) Cable Project
ATLAS ID Services Mock Up - Proposal Presented by Ian Wilmut at DESY, update from John Hill 4th May, 20101ATLAS Upgrade - RAL.
Kitakami Side AHCAL Assembly or anywhere in any detector.
Redundancy Switching Components
Fujitsu Service Portfolio for SAP IT Infrastructures
A very first look at siting issues
د. حنان الداقيز خريف /28/2016 Software Quality Assurance ضمان جودة البرمجيات ITSE421 5 – The components of the SQA.
Work flow Lyon Karlshrue 14/11/2018 Nick Lumb Preparation (no TEC)
Technical Foundations & Enabling Technologies – DS4
MKTG 2016.
SKADS White Paper - Technologies -
Ceramic grinding media Ceramic Grinding media, as the name suggests, is used for particle size reduction by facilitating interaction between the media.
Aperture Array Simulations
ESS Freia Scope Setting ESS - Lund - 17/10/2016.
Test Beamline System Requirements and Charge to PDR Committee
Presentation transcript:

Georgina Harris 11 th October nd SKADS Workshop – Observatoire de Paris 2-PAD Infrastructure Georgina Harris SKADS System Design and Team Leader

Georgina Harris 11 th October nd SKADS Workshop – Observatoire de Paris 2-PAD Overview

Georgina Harris 11 th October nd SKADS Workshop – Observatoire de Paris 2-PAD 3 Sets of Antennas / Front Ends for Initial Trial –Vivaldi –Bunny Ear –Cross Logarithmic Sparse Use of CAT7 cabling for data transport to bunker Representative RFI Shielded Bunker Representative Signal Processing Mechanical Supporting Structure representative of that proposed for SKA Upgrade path built in for addition of alternative new technologies such as antennas and data processing technologies

Georgina Harris 11 th October nd SKADS Workshop – Observatoire de Paris Element Support Grid, Foundations, and Civil Engineering Although the installation in the Cheshire countryside will not be identical to the desert sites, it will enable us to troubleshoot the basic structural design and test the mechanics of assembling the array. It will also allow us to improve the design for easy modular deployment in the desert.

Georgina Harris 11 th October nd SKADS Workshop – Observatoire de Paris Antennas are mounted on a framework and groundplane and all front end electronics are enclosed underneath these in a thermally insulated space. This allows the temperature of the front end electronics and cables to be stabilised and or cooled.

Georgina Harris 11 th October nd SKADS Workshop – Observatoire de Paris Polythene Tarpaulin for Water and Weatherproofing Once the array is thermally insulated, the antenna assembly will be waterproofed and protected from the effects of direct sunlight using a white (reflecting) polythene tarpaulin. Desert condition testing will be needed to verify that the combination of insulation, weather protection and temperature control does not lead to problems with –Pests –Material Degradation –Moisture Accumulation Problems

Georgina Harris 11 th October nd SKADS Workshop – Observatoire de Paris Cable Routing and Support One of the biggest logistical problems will be the deployment of the CAT7 cable because it will be extremely difficult to prepare the terminations on site (either for 2-PAD or the full SKA). 2-PAD will use pre- terminated cables. For the full SKA we envisage pre-bundled cables, cut to the correct lengths that can be fitted to one tile.

Georgina Harris 11 th October nd SKADS Workshop – Observatoire de Paris Processing Bunker Currently working with a RFI consultancy to develop a custom shielded cable sock. This is to minimise the RFI emitted from the bunker via the cables plugged into the bunker wall. We are intending to use a processing bunker manufactured to the basic pattern of a standard transport container. This also permits the processing bunker to be assembled before it is shipped (i.e. computers in-place).

Georgina Harris 11 th October nd SKADS Workshop – Observatoire de Paris Processing Bunker

Georgina Harris 11 th October nd SKADS Workshop – Observatoire de Paris Potential SKA Station Layout

Georgina Harris 11 th October nd SKADS Workshop – Observatoire de Paris Conclusions 2-PAD aims to demonstrate the technologies that could be used to produce the phased array. We aim to use this demonstrator as a tool with which we can assess –Signal processing –Front-end designs –Temperature stabilisation / cooling strategies –Manufacturing and assembly techniques

Georgina Harris 11 th October nd SKADS Workshop – Observatoire de Paris On-site materials testing should be carried out to verify that the array configuration that the materials we are using in our designs will suffer no unexpected problems once it is in desert conditions.