L1Calo Installation Status Murrough Landon, QMUL Level-1 Calorimeter Trigger (University of Birmingham, University of Heidelberg, University of Mainz,

Slides:



Advertisements
Similar presentations
Pixel Chip Testing S. Easo, RAL Current Status of the Pixel Chip Testing. Plans for an LHCb Test Setup at CERN.
Advertisements

TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Scintillation counter installation on EBC cryostat scintillators gap scintillators location of MBTS scintillators MBTS counters will be plugged into fiber.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
Uli Schäfer 1 JEM: Status and plans Pre-Production modules Status Plans.
Uli Schäfer 1 JEM: Status and plans JEM1.2 Status Test results Plans.
Uli Schäfer 1 Production modules Status Plans JEM: Status and plans.
Run 2 Upgrade of the ATLAS Minimum Bias Trigger Scintillators Rachel Hyneman, College of William & Mary Advisor: Antonio Sidoti, Instituto Nazionale di.
EE Mainz meeting 5/3/03 Calorimeter-to-trigger connectivity u Documentation t Excel tables by Steve and Murrough give full detail t LAr has been checked.
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
1 Status of receivers related activities Damien Prieur University of Pittsburgh 12/01/2010L1Calo Joint Meeting - Heidelberg.
Multistep Runs with ROD Crate DAQ Murrough Landon, QMUL Outline: Overview Implementation Comparison with existing setup Readout Status ModuleServices API.
Ideas about Tests and Sequencing C.N.P.Gee Rutherford Appleton Laboratory 3rd March 2001.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
SL1Calo Input Signal-Handling Requirements Joint Calorimeter – L1 Trigger Workshop November 2008 Norman Gee.
Adders in drawer Test of TileCal Level 1 Interface drawer patch panel trigger cable ca 70 m receiver pre-processor TileCal patch panel RP patch panel TileCal.
Tracker Week October CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK Brunel University,
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Analysis for QA (temporary) Hideyuki Sakamoto 1 st October 2007 MICE Tracker Phone Meeting.
Hardeep Bansil (University of Birmingham) on behalf of L1Calo collaboration ATLAS UK Meeting, Royal Holloway January 2011 Argonne Birmingham Cambridge.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN PS/SPD LED monitoring system status In December 2005: –All splitters and drivers are delivered.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
L1Calo Databases ● Overview ● Trigger Configuration DB ● L1Calo OKS Database ● L1Calo COOL Database ● ACE Murrough Landon 16 June 2008.
Schedule ● External Links ● Calorimeter Signals ● Internal Tests ● System Tests ● Combined Runs ● Schedule Murrough Landon 19 April 2007 A brief update.
L1Calo DBs: Status and Plans ● Overview of L1Calo databases ● Present status ● Plans Murrough Landon 20 November 2006.
Phases: to be 2 or to be B? The question of new timescales ● L1Calo phase 2 → phases B and C? ● Implications for design ● Example timescales ● Organising.
DB and Information Flow Issues ● Selecting types of run ● L1Calo databases ● Archiving run parameters ● Tools Murrough Landon 28 April 2009.
L1Calo Databases ● Overview ● Recent Activitity ● To Do List ● Run types Murrough Landon 4 June 2007.
Online Database Developments ● Overview ● OKS database status and plans ● COOL database developments ● Validating calibrations ● Tools ● Summary Murrough.
Phase2 Level-0 Calo Trigger ● Phase 2 Overview: L0 and L1 ● L0Calo Functionality ● Interfaces to calo RODs ● Interfaces to L0Topo Murrough Landon 27 June.
Calibration Operations ● Recent Changes ● Required Changes ● Calibration by Shifters Murrough Landon 23 March 2011.
Rainer Stamen, Norman Gee
Online Database Work Overview Work needed for OKS database
The PSD at Pb-Pb run PSD drawbacks at Ar beam
Minimum Bias Trigger Scintillators
LKr status R. Fantechi.
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Online Database Status
Online Software Status
Online SW, DB & Calibration
Nearly the end of a long story...
Online Software Status
Remaining Online SW Tasks
Level 1 (Calo) Databases
Cabling Lengths and Timing
Online Software “To Do” List
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
Level-1 Calo Monitoring
ATLAS: Level-1 Calorimeter Trigger
L1Calo Joint Meeting Introduction
Update on Laser ‘Aftershock’ Triggers
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Presentation transcript:

L1Calo Installation Status Murrough Landon, QMUL Level-1 Calorimeter Trigger (University of Birmingham, University of Heidelberg, University of Mainz, Queen Mary University of London, Rutherford Appleton Laboratory, University of Stockholm) Outline: Overview Setup for tests First look

CERN, 26 Jan 2006 Murrough Landon, QMUL L1Calo Installation Overview Short analogue cables –Delayed by new discussions over routing. Now doing receiver to PPM cables, TCPPs later (schedule can be tuned). Measure lengths in place, then connectors added by Cegelec, then completed cables laid again. Cable supports (“stocks”) –Supports for TCPPs now delivered, one installed, need to check position eg with Irakli? Patch panels –TCPP production complete, shipped from RAL yesterday –Other patch panels (receiver to PPM) in design or preproduction Trigger Electronics –Most module types in or near production - but ROD & PPM are last –Electronics installation not before spring/summer

CERN, 26 Jan 2006 Murrough Landon, QMUL Cable Tests: Setup HW infrastructure –1 final Receiver and 1 prototype PPM (four cables) each side, connected by four sets of “flying” cables starting from TCPPs –Can test four TileCal modules on one or both sides at a time Software –Still using standalone VME readout of PPMs (no ROD for a while) –Rather slow (eg 2 mins per run) but it works Test procedure –Connect set of 4 Tile cables, couple of setup runs (check DAC level, pedestals) –Ideally run through a set of tests: pulse one PM/tower separately * 5 PMs a few different energies per tower (all PMs) saturated and unsaturated Pattern of different energies in each tower for mapping check –Minimum: one run with 50GeV per tower –Logistics/coordination needs more discussion…

CERN, 26 Jan 2006 Murrough Landon, QMUL Cable Tests: Results Data –So far only from 5 modules (47C,48C,50C,51C,52C) –Mostly the weekend run with saturated pulses (>250GeV) via receivers –Some earlier tests with non-saturated pulses (just 51C) not via the receiver What we see –Pulses look OK on all the expected channels –Details to be checked (eg shape, noise, mapping, etc) –Some tiny (~1%) pulses on other channels (calibration artefact?) Problems –One faulty MCM replaced on PPM (to be checked in Heidelberg) –Dead receiver rear transition module - cause to be investigated by Pittsburgh (Chaouki). This board sees the Tile signals first. Might its death be connected with Tile PS problems??

CERN, 26 Jan 2006 Murrough Landon, QMUL Some pulses: noise and ~50GeV (51C)

CERN, 26 Jan 2006 Murrough Landon, QMUL Some pulses: saturated (47/48C)