2015-04-27 1 2015-04- 1 Routing of Cables and Tubes at the Target Spectrometer PANDA Mechanics Workshop, April 2015 J. Lühning, GSI Routing at the barrel.

Slides:



Advertisements
Similar presentations
Panda Solenoid Timelines. General Layout constraints and HOLD POINTS.
Advertisements

PANDA Mechanical Workshop Backward Endcap Calorimeter Geometry David Rodríguez Piñeiro GSI Darmstadt PANDA Mechanical Workshop GSI
PANDA Collaboration Meeting Backward Endcap Calorimeter Geometry David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting GSI
Guenther Rosner FAIR Design Study, PANDA 3, GSI, 19/1/06 1 PANDA3: Magnet design and integration of detectors Tasks & participants Progress Milestones.
Effects of Weathering, Erosion and Deposition
Integration & Information Marc and Qian. USTC Laser Pulse TrainLaser Signal from Barrel TOF Counter.
> >
RPC system cable routing Yang Changgen, Guan Mengyun IHEP, Beijing.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
INTEGRATION OF THE CBM SILICON TRACKING SYSTEM U. Frankenfeld for the CBM collaboration supported by BMBF, EU-FP7 HadronPhysics3 and CRISP.
Darmstadt, 15. November 2015 Tobias Stockmanns, FZ Jülich1 A STEP to ROOT converter for the FairRoot framework ALICE-FAIR Computing Meeting, GSI,
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
Alpine pixel layout Integration progress Teddy Todorov For the ATLAS-LAPP group AUW Integration meeting 20/11/2012.
Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
. Si upgrade workshop, 9 June Hubert van Hecke Si Upgrade - Mechanics Review of Hytec study Mounting scheme Services.
Upgrade Infrastructure Workshop Calorimeter upgrade Infrastructure Cooling – piping Frédéric Machefert Laboratoire de l'Accélérateur Linéaire.
IBL Mock up Mounting procedure V.2 François-Xavier Nuiry Simon Feigl
Integration Prototype1 BaBar Integration as a Prototype for SuperB Bill Wisniewski SuperB Workshop at LNF 6 April 2011.
Vacuum conditions in PANDA pbar-line Alexander Gruber, SMI, Vienna, Austria.
Joint Institute for Nuclear Research Status of the magnet for the PANDA Target Spectrometer Report from Dubna A.Efremov, E.Koshurnikov, Yu.Lobanov, A.Makarov,
S TATUS OF B ARREL D IRC M ECHANICAL D ESIGN S TATUS OF B ARREL D IRC M ECHANICAL D ESIGN Doro Lehmann has started to update barrel DIRC in CATIA based.
MVD COOLING STATUS COOLING PLANT UPDATE: -ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC Converter BOARDS IN THE COOLING PLANT -THERMAL STUDY OF GBT AND.
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
Status of the Yoke Interfaces Presented by Evgeny Koshurnikov February 2013.
PANDA Yoke unsolved Interface problems Presented by E. Koshurnikov (Dubna) December 9, 2011, GSI.
/ 11 Updates of PANDA 3D Model CM June 2016 at GSI, MEC Session J. Lühning, GSI Updates for: Panda Hall Target Spectrometer Latest version.
Status of the PANDA Magnet Yoke Presented by E. Koshurnikov GSI, June 26, 2013.
A.Ryazantsev, IHEP-Protvino, RussiaPANDA Russia Workshop at Moscow, May 2015 Status on Barrel Mechanics Andrey Ryazantsev on behalf of the IHEP-Protvino.
G. GIRAUDO - D. ORECCHINI Beam-Target line for PANDA – GSI – 4 February 2013 Beam-Target line for PANDA – GSI – 4 February 2013 Central Trackers assembly.
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
Miscellaneous about Target Spectrometer PANDA Mechanics Meeting, September 2015 J. Lühning, GSI Space around Barrel Target Platform Cable Routing.
MVD COOLING STATUS MVD COOLING PROJECT: CHOICE of COOLING FLUID,
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
Some Updates on Mechanics CM-MEC Session Dec J. Lühning, GSI
Miscellaneous Topics MEC Session, CM March 2017 at GSI J. Lühning, GSI
STRAW TRACKER SYSTEM CAD STATUS :
Platform Design for the Target Spectrometer using Heavy-Weight Rollers J. Lühning, GSI Darmstadt, Three design goals for Platform: Low construction.
Target Spectrometer Updates CM-MEC Session Giessen, March 2015 J
Update of MVD services and requests
- CT INSTALLATION PROCEDURE OVERVIEW -
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Work progress in Turin x the MVD
PANDA Yoke of the Magnet
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
U units for the MVD Close MVD Pixels (Paolo) Strips (Robert and Hans)
Barrel EMC assembling (EDMS DOCUMENT NUMBER /1)
Cooling pipes and Space for Services
Micro Vertex Detector of PANDA Strip Detector
PANDA Mechanical Design
Central Tracker Support Frame MEC Session, CM June 2017 at GSI J
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
IHEP group Shashlyk activity towards TDR
Integration – preliminary ideas on routing and tests
EMC BWE PANDA Insertion
TIDVG-4 TIDVG-4 Dump assembly, welding and installation Process sector BA1 February 2017 J. Humbert, (EN/MME) 06/02/2017 J. Humbert, EN-MME.
Chamber Design and Integration RE3/1 and RE4/1
ATLAS ITk CO₂ Cooling pipe routing CO₂ Meeting, 28 June 2016
First of all we will remind some numbers:
Test beam setup: status report 10/02/2009
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
BARREL 3 FIBRE ROUTE ORDER and HARNESS INSTALLATION ORDER]
Work packages status in Torino and perspectives
Mechanics of the MVD Daniela Calvo on behalf of the MVD group
I250Y-R: Target Expt –(05/31/2011) Viewer as seen by camera
as a prototype for Super c-tau factory
Polarized 3He target installation
Presentation transcript:

Routing of Cables and Tubes at the Target Spectrometer PANDA Mechanics Workshop, April 2015 J. Lühning, GSI Routing at the barrel yoke of the TS Routing to the racks outside of the cave 3D-PDF files available here:

Routing at the barrel yoke of the TS Recess in the barrel for cables and tubes View from downstream side Tube route to the western side?

Routing at the barrel yoke of the TS Eastern manifold box for EMC- cooling View from upstream side Dark brown: inflexible part of the cable chain

Routing to the racks outside of the cave Example for routing: HV-cables for FE-EMC Target Spectrometer in maintenance position Cooling tubes for MVD