Dan Cheng S. Kincaide, H. Felice, X. Wang 4/23/2015 MQXFS Mechanical Interfaces (Proposed)

Slides:



Advertisements
Similar presentations
Long HQ coil drawings now available 1 Miao Yu. Dead voltage taps in TQ/LQ/HQ coils Inner layer: 24, outer layer: 12 (33 inner/23 outer per coil for TQ/LQ/HQ)
Advertisements

HQ Coil 18 Test Impregnation LARP Video Meeting November 21, 2013 Dan Cheng.
Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
1 Preparation for MQXF Short Model Tests G. Chlachidze Fermilab.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola February 4th, 2014.
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
Coil parts & Instrumentation issues for LQ/HQ coils tested at Fermilab HQ/LHQ coil parts task force.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola January 29, 2014.
H. Felice - P. Ferracin – D. Cheng 09/11/2013 Update on structure CAD model.
HQ Splice Insulation QXF Coil working group Video Meeting August 22, 2013 Dan Cheng August 22, 2013.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
1 Collar Pack #2 Disassembly Incident Summary and Plan Helene Felice Heng Pan, Dan Cheng, Xiaorong Wang, Soren Prestemon, Maxim Martchevsky, Ahmet Pekedis,
ATLAS Pixel Detector March 2004 Video Conference E. Anderssen LBNL PP1 Opto Connector and Fiber Routing Updated with notes from 23-March Meeting E. Anderssen,
Design Features: still to be determined and open questions P. Ferracin 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 Part 1: Design and Construction.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
MQXF length P. Ferracin Video-meeting Structure WG September 18th, 2014.
Susana Izquierdo Bermudez. SLS parts 2 Our support is in the nose area that the reason we got the deviations in this area. For the next parts we do the.
Support structure working group video- meeting P. Ferracin, D. Cheng, H. Felice, M. Juchno, J.C. Perez July 15th, 2014.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN H. Felice, R. Hafalia, D. Horler, T.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
HQ01e CERN test preparation update CERN Team: H. Bajas, M. Bajko, A. Chiuchiolo, G. Deferne, O. Dunkle, J. Feuvrier, P. Ferracin, L. Fiscarelli, F. Flamand,
SQXF Winding Test Proposal Concept at LBNL Dan Cheng Sept 17, 2013.
LARP CM15 Magnet Testing Working Group SLAC, November 2 nd 2010.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
H. Felice, D. Cheng, H, Pan, M. Reynolds, A. Pekedis, T. Lipton MQXFS1 update 07/27/2015.
Superconducting Corrector Magnet Progress Report P. Wanderer Superconducting Magnet Div; Dec. 15, 2007 T2K US B280 collaboration meeting.
LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich LARP Cable R&D D.R. Dietderich LBNL.
MQXFS Assembly Procedure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, Ph. Grosclaude, M. Juchno, L. Lambert, P. Moyret, J. Parrilla Leal, N. Peray, T.
ATLAS 1 Beam Pipe Support Structure (BPSS) Services Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman, A Smith, LBNL S. Coelli,
Long Quadrupole – G. Ambrosio 1 LARP Collaboration Meeting – FNAL, Oct , 2008 BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio LARP Collaboration.
Helene Felice HQ Test Results Review Thursday December 16 th Overview of HQ coils and Magnet.
MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Dan Cheng J. De Ponte, H. Felice, S. Kincaid, T. Lipton, S. Myers, A. Pekadis, M.
Dan Cheng, Helene Felice 4/8/2015 MQXFS-D Build-up LBNL “Lessons Learned”
MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Dan Cheng J. DiMarco, C. Hernikl, D. Humphries, S. Myers, X. Wang MQXFA Magnet Fiducialization.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
MQXFS Coil V1 Fabrication Status -Winding and Curing Miao Yu
Overview short model design and structures P. Ferracin on behalf of the MQXF collaboration MQXF Workshop on Structure, Alignment, and Electrical QA CERN.
QXF Coil Fabrication: Baseline Decisions QXF Coil Working Group Video Meeting (Revised from discussion during presentation) Dan Cheng April 16, 2013.
ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.
1 MQXF(S) Magnet Interface Document MQXF(S) magnet interface document will describe electrical connection between the magnet and the header assembly Scope.
Dan Cheng, Xiaorong Wang 12/15/2015 MQXFA Connectors Discussion Part II.
MQXFS01 instrumentation, Projecting towards MQXFA D. Cheng, S. Myers, H. Pan, X. Wang 10/14/20151.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
QXF Coil working group 2/11/16 Dan Cheng J. DiMarco, C. Hernikl, D. Humphries, S. Myers, X. Wang MQXFA Coil Fiducialization Proposal.
MQXFS1 Test Results G. Chlachidze, J. DiMarco, S. Izquierdo-Bermudez, E. Ravaioli, S. Stoynev, T. Strauss et al. Joint LARP CM26/Hi-Lumi Meeting SLAC May.
MQXFSM1 results Guram Chlachidze Stoyan Stoynev 10 June 2015LARP meeting.
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
Helene Felice With input from Dan C, Maxim… Possible options for coil wiring.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
Dan Cheng QXF Structures Working Group November 7, 2014 Implications for the split-shell MQXFS concept.
HQ02a Magnet Interfaces at FNAL D.W. Cheng 3/6/2013.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
Pocket and Metric Hole in End Parts Miao Yu 02/25/2014.
Mechanical strain measurements on MQXFS1 Magnet using CERN system M.Guinchard and P.Grosclaude European Organization for Nuclear Research (CERN) 27 April,
QXF Coil Fabrication & Tooling Reaction / Impregnation
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
ERMC/RMM activities May 2017
Voltage tap layout and quench antenna options for the long QXF magnet
MQXF updates P. Ferracin October 9th, 2014.
MQXF coil cross-section status
Presentation transcript:

Dan Cheng S. Kincaide, H. Felice, X. Wang 4/23/2015 MQXFS Mechanical Interfaces (Proposed)

Outline 4/23/2015MQXFS Mechanical Interfaces2 Magnet Packaging envelope & interfaces Pizza box connections Wiring & Connectors Status

MQXFS Assembly 4/23/2015MQXFS Mechanical Interfaces3

MQXFS Assembly Length Requirements 4/23/2015MQXFS Mechanical Interfaces mm 180 mm 145 mm 355 mm* 428 mm * Extended lead length due to CERN coils being produced with 375 mm long copper stabilizers instead of 2 nd NbTi cable

4/23/2015MQXFS Mechanical Interfaces5 MQXFS Assembly Diameter requirements 614 mm Dia. shell 647 mm Guide Plate* CERN-style shell SG connector on OD of shell, approximately ~15 mm proud in one location Connector can be oriented to line up with one of the 647 mm diameter lobes

*LQ Test Configuration 4/23/2015MQXFS Mechanical Interfaces6 Tri-lobed 647 mm dia. Guide Plate was used in the LQ tests

4/23/2015MQXFS Mechanical Interfaces7 MQXFS Assembly Support Interface Typical ¾-10 tapped 4-hole pattern support interface HQ-style support ring and connector skirts

4/23/2015MQXFS Mechanical Interfaces8 MQXFS Connection Box Design Splices (and CLIQ leads) will be made in two layers Current leads CLIQ leads (max. 3) Full-size cables shown

MQXFS Wire Routing 4/23/2015MQXFS Mechanical Interfaces9 All IL wires will pass thru wire guides underneath the axial endplates

4/23/2015MQXFS Mechanical Interfaces10 MQXFS Wire Routing All wires will terminate in Hypertronics connectors on LE of magnet Wires from RE will be routed through wire guides in 1 or 2 cooling holes

Status 4/23/2015MQXFS Mechanical Interfaces11 Pizza box connection box is currently being detailed – RFQs to be issued early May – Fabrications to be complete mid-June Wiring & Connectors – Support rings & connector skirts need to be detailed – IL Wire guides design is complete Real Coils are expected to arrive mid-May (CERN and BNL)