US AFEB timing in CSCs in splash events, run 120042 N. Terentiev, CMU CSC Synchronization meeting Nov. 16, 2009, CERN.

Slides:



Advertisements
Similar presentations
Improvements to ME1/1 TMB Algorithm from Simulation Studies US CMS EMU Workshop Vadim Khotilovich, Texas A&M University.
Advertisements

Calibration for different trigger sources (DT,CSC,RPC) S.Bolognesi for the Torino group (with a big help from M. Dalla Valle) DT Cosmic Analysis meeting.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* EMU Meeting University of Florida 01/09/2004.
First CMS Results with LHC BeamToyoko Orimoto, Caltech 1 First CMS Results with LHC Beam Toyoko Orimoto California Institute of Technology On behalf of.
US Beam Test Results and ORCA validation for CMS EMU CSC front-end electronics N. Terentiev Carnegie Mellon University CMS EMU Meeting, CERN June 18, 2005.
CMS ECAL Prompt Feedback Group Toyoko J. Orimoto, California Institute of Technology A Brief History: From GRUMM to First BeamThe Future of the ECAL PFG.
US Some Preliminary Test Beam Results T. Ferguson, N. Terentiev*, I. Vorobiev CMS EMU Meeting Fermilab Oct , 2004.
CMS Physics Meeting, Dec. 6, Analysis Note on the Validation of the ORCA Simulation of the Endcap Muon CSC Front-end Electronics S. Durkin -- Ohio.
First CMS Results with LHC BeamToyoko Orimoto, Caltech 1 First CMS Results with LHC Beam Toyoko Orimoto California Institute of Technology On behalf of.
US FAST site EMU CSC test results – a global view from ROOT N. Terentiev (Carnegie Mellon University) Fermilab July 23, 2004.
J. Leonard, U. Wisconsin 1 Commissioning the Trigger of the CMS Experiment at the CERN Large Hadron Collider Jessica L. Leonard Real-Time Conference Lisbon,
US Test Beam Results Of Front End Timing T. Ferguson, N. Terentiev* (Carnegie Mellon University) CMS EMU Meeting University of California, Davis Feb 25.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* EMU Meeting University of Florida 01/09/2004.
US Test beam data analysis & validation of OSCAR/ORCA Tim Cox, UC Davis Nikolai Terentiev*, CMU CMS Physics Week Fermilab Apr , 2005.
Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 1 CSC Trigger Primitives Test Beam Studies Main Test Beam 2003 Goals: Verify the peripheral crate.
D. Peterson, “ILC Detector Work”, Cornell Group Meeting, 4-October ILC Detector Work This project is supported by the US National Science Foundation.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
US Beam Test Results and ORCA validation for CMS EMU CSC front-end electronics N. Terentiev Carnegie Mellon University CMS EMU Meeting, Fermilab October.
DRAFT version Oct. 15, 2004 Hauser/Mey UCLA 1 Analysis of Oct. 04 Test Beam RPC Data Jay Hauser, Martin von der Mey University of California Los Angeles.
1 ME 234/2 HV noise investigation N.Bondar CMU. 12/18/02.
US LPC Muon Group CMSSW code development efforts N. Terentiev Carnegie Mellon University CMS EMU Meeting, Florida Institute of Technology February 17-18,
Preliminary Results from Structured Beam Test CMS Trigger Meeting June 3, 2003 Brian Mohr UCLA Dept. of Physics.
5-Jan-2010 XEB Meeting at CERN 1 Debriefing from first data: CSC muons n Lessons learned u LHC is a quiet machine  CSC HV can remain on at all times,
Neutron Background Simulation R. Wilkinson. 2 Neutron Background Simulation Long-lived neutrons created, diffuse around collision hall They get captured.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
DRAFT version Oct. 15, 2004 Hauser/Mey UCLA 1 Analysis of Oct. 04 Test Beam RPC Data Jay Hauser, Martin von der Mey University of California Los Angeles.
SPD spill-over and the subtractor Míriam Calvo 23 June 2010.
An Asynchronous Level-1 Tracking Trigger for Future LHC Detector Upgrades A. Madorsky, D. Acosta University of Florida/Physics, POB , Gainesville,
Approved Plots from CMS First Beam Runs 2-October-2008.
Toward Assessing HF with Beam Halo Muons & Beam-Gas Events …tuning HF when beam returns excerpts from US-CMS presentation 9/26/08 Michael Schmitt, NWU.
RPC PAC Trigger system installation and commissioning How we make it working… On-line software Resistive Plate Chambers Link Boxes Optical Links Synchronization.
7 Nov 2007Paul Dauncey1 Test results from Imperial Basic tests Source tests Firmware status Jamie Ballin, Paul Dauncey, Anne-Marie Magnan, Matt Noy Imperial.
Design and development of micro-strip stacked module prototypes for tracking at S-LHC Motivations Tracking detectors at future hadron colliders will operate.
Andrey Korytov, University of Florida IEEE Nuclear Science Symposium, Honolulu, 31 October Performance of CMS Cathode Strip Chambers Andrey Korytov.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
Draft of talk to be given in Madrid: CSC Operations Summary Greg Rakness University of California, Los Angeles CMS Run Coordination Workshop CIEMAT, Madrid.
10/06/09 UCLA Meeting Hauser 1/14 really Various updates Update on LHC schedule: Beam to Alice starts ~Oct. 24. Not all sectors are cold. Circulating beam.
The Status of the ATLAS Experiment Dr Alan Watson University of Birmingham on behalf of the ATLAS Collaboration.
4 Dec 2008G. Rakness (UCLA)1 Online Software Updates and RPC data in the RAT …including Pad Bit Mapping and Efficiency… Greg Rakness University of California,
Сессия Ученого Совета ОФВЭ 27 декабря 2006 Проект CMS в 2006 Ю.М.Иванов В.В.Сулимов.
Сессия Ученого Совета ОФВЭ 25 декабря 2008 Проект CMS в 2008 В.В.Сулимов.
The experimental setup of Test Beam HE EE ES BEAM  A slice of the CMS calorimter was tested during summer of 2007 at the H2 test beam area at CERN with.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
First CMS Results with LHC Beam
Track Selection Performance of the CMS Cathode Strip Chamber Track Finder and Level 1 Trigger Kristin Beck Advisors: Dan Holmes, Darin Acosta 14 August,
1 Plans for first beams - - triggers from the BRM group (BSC, BPTX) Gábor Veres for the BRM group CMS Trigger Technical Coordination Meeting 8 October,
13 March 2007G. Rakness (UCLA) 1 RPC efficiency in RAT Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007.
H C A L 11 th International Conference on Advanced Technology and Particle Physics Villa Olmo (Como - Italy), October 5 - 9, 2009 THE PERFORMANCE OF THE.
1. Last measurement of the distances between schools gave following results: G.Ferraris – A.Volta 1.41 km A.Volta – M.D’Azeglio 1.15 km G.Ferraris – M.D’Azeglio.
Recall: CFEB inefficiencies Collision Run June 2010G. Rakness (UCLA)1 validation/run135445/ExpressPhysics/Site/PNGS/hORecHits.png.
The Summer Begins: CERN Kristin Beck University of Michigan REU at CERN2 of 10 Introductions High Technology High School Hometown:
The CMS LEVEL 1 TRIGGER SYSTEM FUNCTIONALITY and PERFORMANCE
RPC Simulation software Raffaello Trentadue. RPC Digi producer RPC Digitizer RPC Synchronizer RPC Simulation model Average model Parametrized model Parametrized.
TeV Muon Reconstruction Vladimir Palichik JINR, Dubna NEC’2007 Varna, September 10-17, 2007.
10/20/09 UCLA Meeting Hauser 1/9 Various updates Update on LHC/CMS schedule: First shots into collimator: Nov. 7 and 8! Circulating beam ~Nov. 18, less.
Effects of Endcap Staging/Descoping D.Acosta University of Florida.
TOTEM Collaboration Meeting 13/12/06 Fabrizio Ferro-INFN-Ge 1 T1 SW status.
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
Status at CERN 8 fills  ~500/pb since last Tuesday – ~5.3/fb delivered, ~4.8/fb recorded, … SEU workshop on Friday – Different detectors have different.
Approved Plots from CRAFT
(University of Sofia “St. Kliment Ohridski”)
Timing/Synchronization Status
CMS muon detectors and muon system performance
Colliding Beams Group Involvement In CMS (see also M
Calorimeter Occupancies University of Cambridge
MDC Data Check Wu Linghui
Analysis of Oct. 04 Test Beam RPC Data
DESY drift chambers efficiency and track reconstruction
The CMS muon system performance
Installation, Commissioning and Startup of ATLAS & CMS Experiments
Presentation transcript:

US AFEB timing in CSCs in splash events, run N. Terentiev, CMU CSC Synchronization meeting Nov. 16, 2009, CERN

N. Terentiev (CMU) CSC Timing meeting Nov. 16, 2009 CERN 2 Introduction Data: run splash events (475 events available) beam 2 goes from ME- to ME+ CMS trigger is provided by ECAL using "collider" mode of CSC timing ME- was delayed by 2 BX to coincide with ME+ Analysis: CMSSW_3_2_2, dataset /BeamHalo/BeamCommissioning09-v1/RAW CSCValidation package (modified module doAFEBTiming) CSCWireDigi collection provides for each hit in CSC layer: wire group number 25 ns time bin number where the hit was latched by ALCT ("time bin ON") up to 16 non empty time bins recorded

N. Terentiev (CMU) CSC Timing meeting Nov. 16, 2009 CERN 3 Introduction doAFEBTiming module outputs for each CSC: 2D distribution of the first time bin number which is ON versus the wire group (presented with use of AFEB channel number, left figure) 2D distribution of the number of time bins ON versus the wire group (right figure) we are using MEAN of the first time bin number ON distribution for timing number of time bins ON is sensitive to AFEB oscillations and pickup noise.

N. Terentiev (CMU) CSC Timing meeting Nov. 16, 2009 CERN 4 Analysis In splash events anode mean timing distributions are not flat within CSC (examples are for ME-3/2/15) To have global picture for all CSCs use MEAN averaged over first 3 AFEBs (narrow part of the chamber, "bottom") and last 3 AFEBs (wide part of the chamber, "top"), see next slides.

N. Terentiev (CMU) CSC Timing meeting Nov. 16, 2009 CERN 5 Analysis In cosmic muons data from CRAFT2009 anode mean timing distribution is within 1 BX in each CSC ( example for ME-3/2/15, right, see also backup).

N. Terentiev (CMU) CSC Timing meeting Nov. 16, 2009 CERN 6 Analysis Timing in ME1/1

N. Terentiev (CMU) CSC Timing meeting Nov. 16, 2009 CERN 7 Analysis Timing in ME1/2

N. Terentiev (CMU) CSC Timing meeting Nov. 16, 2009 CERN 8 Analysis Timing in ME1/3

N. Terentiev (CMU) CSC Timing meeting Nov. 16, 2009 CERN 9 Analysis Timing in ME2/1

N. Terentiev (CMU) CSC Timing meeting Nov. 16, 2009 CERN 10 Analysis Timing in ME2/2

N. Terentiev (CMU) CSC Timing meeting Nov. 16, 2009 CERN 11 Analysis Timing in ME3/1

N. Terentiev (CMU) CSC Timing meeting Nov. 16, 2009 CERN 12 Analysis Timing in ME3/2

N. Terentiev (CMU) CSC Timing meeting Nov. 16, 2009 CERN 13 Analysis Timing in ME4/1

N. Terentiev (CMU) CSC Timing meeting Nov. 16, 2009 CERN 14 Analysis Timing in ME4/2

N. Terentiev (CMU) CSC Timing meeting Nov. 16, 2009 CERN 15 Summary Anode timing in Nov splash events (run ) still different for ME+ and ME- approximately flat in CSCs in inner rings (within 1BX) anode signals come later by ~1-1.5 BX in outer parts of CSCs ("top") of outer rings ME2/2 and ME3/2 in both endcaps splash events hard to interpret due to extremely high occupancy of anode wires and cathode strips in CSCs coming beam halo events should provide more clear picture

N. Terentiev (CMU) CSC Timing meeting Nov. 16, 2009 CERN 16 Backup Timing in ME1/1 (CRAFT 2009 Summer)

N. Terentiev (CMU) CSC Timing meeting Nov. 16, 2009 CERN 17 Backup Timing in ME1/2 (CRAFT 2009 Summer)

N. Terentiev (CMU) CSC Timing meeting Nov. 16, 2009 CERN 18 Backup Timing in ME1/3 (CRAFT 2009 Summer)

N. Terentiev (CMU) CSC Timing meeting Nov. 16, 2009 CERN 19 Backup Timing in ME2/1 (CRAFT 2009 Summer)

N. Terentiev (CMU) CSC Timing meeting Nov. 16, 2009 CERN 20 Backup Timing in ME2/2 (CRAFT 2009 Summer)

N. Terentiev (CMU) CSC Timing meeting Nov. 16, 2009 CERN 21 Backup Timing in ME3/1 (CRAFT 2009 Summer)

N. Terentiev (CMU) CSC Timing meeting Nov. 16, 2009 CERN 22 Backup Timing in ME3/2 (CRAFT 2009 Summer)

N. Terentiev (CMU) CSC Timing meeting Nov. 16, 2009 CERN 23 Backup Timing in ME4/1 (CRAFT 2009 Summer)

N. Terentiev (CMU) CSC Timing meeting Nov. 16, 2009 CERN 24 Backup Timing in ME4/2 (CRAFT 2009 Summer)