FAF System FAFLDEVN NEW 10-24-2012 REVISED 10-23-1989 SCHID: 1,2,3,4,5,6 CALENDAR: 7D ROLL=D DESCRIPTION: FAFLDEVN FAF825 (/FINAID) /FINAID = Mutually.

Slides:



Advertisements
Similar presentations
Amazing Words A Big Fish for Max. Monday chore – a job chore – a job cooperation – working together cooperation – working together household – your household.
Advertisements

Grade 2 Created by; Kim Smith
Year 10 ISA Controlled assessment Week starting March 4 th 2013.
Operation Research By Anitha Chandran Chitra.R Radha.R Sudhit Sethi.
Today Is Sunday By Dr Jean.
Ain't It A Shame 1-4 Aint it a shame to work on Sunday, Aint it a shame, (a working shame,) Aint it a shame to work on Sunday, Aint it a shame, (a working.
2012 Shift Change Schedules REVISED for new contract language.
9/22 thru 9/26 Monday – Distributive Property – Slides 2 AND 3 Tuesday – Factor Linear Expressions – Slides 4 AND 5 Wednesday – Solutions of Equations.
1 The seven days of the week. 2 Monday is our washing day. Scrub, scrub, scrub.
Planners help to keep you organized and focused!
The Months and The Seasons Prepared by Claudia Doria and Terra Myers.
2012 CALENDAR. JANUARY 2012 Sunday 日 Monday 月 Tuesday 火 Wednesday 水 Thursday 木 Friday 金 Saturday 土
January 2012 Monday Tuesday Wednesday Thursday Friday Sat/ Sun / /8 14/15 21/22 28/
Saturday May 02 PST 4 PM. Saturday May 02 PST 10:00 PM.
Sequences and Series Day 2&3 Happy Monday
MONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAYSATURDAYSUNDAY WEEK WEEK WEEK WEEK WEEK CALENDAR PROJECT.
On Sunday, it was 59° at 10:00. From 8:00 until 10:00 it had cooled off by 4 degrees. What was the temperature at 8:00?
ARISE Summer Institute UC Davis June 17-June 22, 2011.
What day is today? What`s the date?. Sunday Monday Tuesday Wednesday Thursday Friday Saturday What day is today?
(Tentative) Plan for Last Days of School. Friday 5/8 / Monday 5/11 Work on empathy final project Tuesday 5/12 / Wednesday 5/13 (MIN.) Work on empathy.
Online Membership System (OMS) Regional Workshop.
FND System FND801 - FND806 NEW REVISED DESCRIPTION: SCHID: 1, 2, 3, 4, 5, 7 (See FND802S) SCHID: 1 SCHID: 4, 5, 7 SCHID: 6 SCHID: SCHID: 2-6.
 Scribe,  Final presentation:  create setting,  memorize lines,  character reports  HW: make-up work, promptbook, memorize lines  Monday: Scribe,
W20: 12-16, 2015 Week 19. Monday, January 12 Check in… - Homework in to bin Goal – ASWBAT… define what physical characteristics are and identify basic.
Click the button to begin. 12:25 What time does this clock show? 5:00 4:00.
TX SET v2.1 Implementation Plan. Table of Contents A.Shut Down Procedure B.Shut Down Timeline Details C.Conference Calls D.Additional Contingencies.
FRS System FRS600 - FRS810 NEW REVISED DESCRIPTION: SCHID: CALENDAR: FRS802 FRS (JCL) Runs on Request. SBTM = 1800 POSSIBLE OBSOLETION.
By Monica Hilgemann Second Grade Teacher
HR System HRS615 NEW REVISED SCHID: 5, 10 CALENDAR: 5D DESCRIPTION: SCHID 5: Runs 2 wks prior to the last Friday (workday) in Dec. SCHID 10: Runs 2 wks.
PER System PERBSEP NEW REVISED PER843 (JCL) PERBSEP SCHID: 40 CALENDAR: PW DESCRIPTION: Runs 2 nights after RG1 and RG2 Payroll Calc. for all.
Habitat for Humanity Winter Break Winter Break Logistics Taking 15 people (includes 1 adviser and site leader) Depart: Sunday, January 9 th, 2011.
7 th Grade Language Arts Monday, October 5, 2015 No DOL this week Harris and Me Begin writing assessment- “Seventh Grade” Must be submitted by Friday at.
SYS System SYSDAILY NEW REVISED DESCRIPTION: Schid 1: Runs Monday. Schid 2: Runs Tuesday. Schid 3: Runs Wednesday. Schid 4: Runs Thursday. Schid.
HEP System HEPDLY NEW REVISED CALENDAR: PW SCHID: 1, 2, 3, 4, 5, 100 DESCRIPTION: SCHID 1: Runs every Monday except the 2DBP & DOP.
Tuesday December 4th 1. Review Game 2. Open Fall of the Roman Empire letter project Take notes from video 3. Fall of Roman Empire Video (40)
HF System HRF805 - HRF825 NEW REVISED SCHID: 1 CALENDAR: WD DESCRIPTION: SCHID: 1 CALENDAR: 5D Roll = N DESCRIPTION: SCHID: 1, 2 CALENDAR: 5D Roll = F.
RER System RERMONM NEW REVISED SCHID: 2, 3 CALENDAR: RR Roll = B DESCRIPTION: SCHID 2: Runs on Monday of the week of Fall Mass Registration*.
Class Time Modules for the Semester Calendar Additional Senate Discussion
TODAY IS MONDAY THE 16 th OF NOVEMBER 2015 ON MONDAY WE ARE WORKING WITH THE LAPTOP.
Expense Report Total Miles MONDAY 5 5 TUESDAY WEDNESDAY 6 6 THURSDAY FRIDAY SATURDAY 0 SUNDAY0 TOTAL 23.
LM System LMFYEND NEW REVISED DESCRIPTION: SCHID 3: Runs the 1st calendar day in July. CALENDAR: 7D Roll = N SCHID: 3 LMFYEND LMS820 LMS821.
ADW System ADW820 - ADW821 NEW REVISED (JCL) DESCRIPTION: SCHID 2: Runs on the night before Payroll Calc for MARRG2 payroll. SCHID 4: Runs on.
NHS Meetings Calendar All Meetings are at 2:20pm unless otherwise stated This logo denotes a General Meeting. This means that ALL MEMBERS must.
Advent Calendar Christmas Sunday 7 th December Keep the peace. Do not fight with anyone today.
Georgia Institute of Technology Fiscal Year 2006 Closeout Town Hall Meeting March 21, am - 11am Student Services Building, Room 117.
The birthday calendar 2B : Unit 6 Days of the week Days of the week.
CC System CCIMOINV NEW REVISED CCIMOINV SCHID: CALENDAR: WD DESCRIPTION: SCHID 1 - Runs 1st working day of January. SCHID 2 - Runs 1st.
Happy Days by Charles Fox and Norman Gimbel PowerPoint by Camille Page.
The Calendar.
NEW REVISED CCBREORG CALENDAR: SCHID: 1 DESCRIPTION: AF/OPER submits job to CA-7 when DFHSM issues a ‘maintenance required’ message.
January 18 – 22, 2016 Week Home of the Mighty Eagles! Mission High School.
Daily Math Review September 2-6, Monday Solve the following problems with strategies and/or algorithms 5, = 9, = 3, =
REX System REXACTTY NEW REVISED REXACTTY (REX835) REX836A REX836B REX836C (JCL) SCHID 15, 16 SCHID 6,7,8,9 (REX836A) (REX836B) (REX835)
Problem of the Week! Delvin exercised 3 days each week. He ran 2 miles on his treadmill, rode his bike for 30 minutes and lifted weights for 15 minutes.
PA System PADAILY2 NEW REVISED SCHID: 30 CALENDAR: WD DESCRIPTION: Runs every working day. PAD830 (PAPR Application closed) PAD859.
7 th Grade World Geography Text: History Alive! Monday, December 17 Unit 3: Ancient India Chapter 15 “Learning About World Religion: Hinduism” CW – Quizlet.com.
8 th Grade Language Arts Monday, October 5, 2015 No DOL this week Far North Begin essay assessment- “Charles” Must be submitted by Friday at 9 P.M.
My Plan to Go to Around the world By: Benedict/5C.
RSR System RSR803 - RSR804 NEW REVISED DESCRIPTION: DESCRIPTION: SCHID 15: Runs the second Tuesday following 10 th day for Fall. SCHID 16: Runs.
PART OF SPEECH DEFINITION SYNONYM SENTENCE NAME TEACHER AND DATE1 WORDS OF THE WEEK.
PART OF SPEECH DEFINITION SYNONYM SENTENCE NAME TEACHER AND DATE1 WORDS OF THE WEEK.
HEP System HEPDAILY NEW REVISED SCHID: 1, 2, 3, 4, 5 CALENDAR: PM DESCRIPTION: HEPDAILY SCHID 1: Runs every Monday. SCHID 2: Runs every Tuesday. SCHID.
DM System DMC801 - DMC813 DMC801 (#JI) DMC NEW
( ) Parentheses=requirement or dependency
OBSOLETE 9/4/12 no longer needed (ERP)
NOTE: RCX880 has a conditional dependency of RCX844
( ) Parentheses=requirement or dependency
PRK System PRK800 - PRK802 PRK800 PRK801 PRK NEW
ALL JOBS OBSOLETE ON THIS PAGE
NOTE: THIS JOB MIRRORS THE SCHEDULE OF FAA815--
Presentation transcript:

FAF System FAFLDEVN NEW REVISED SCHID: 1,2,3,4,5,6 CALENDAR: 7D ROLL=D DESCRIPTION: FAFLDEVN FAF825 (/FINAID) /FINAID = Mutually Exclusive Jobs FAF803 (/FINAID) FRS836 FAF802 (/FINAID) SBTM=1930 (?FAF835) SBTM=2000 (/FINAID) (FAF825) NOTE: Any changes to this job will affect FAAEVLTR, FAASULTR, FAAODLTR, FAAPARS, FAASPARS, FSLAY, FSLSUMR, & FAFLDODD. FAF899 SBTM=1100 SCHID 1: Runs Sundays in January thru December. SCHID 2: Runs Mondays in January thru December. SCHID 3: Runs Tuesdays in January thru December. SCHID 4: Runs Wednesdays in January thru December. SCHID 5: Runs Thursdays in January thru December. SCHID 6: Runs Fridays in January thru December. (FAF802) Priority 170 If this dummy job needs to be turned off OR on due to annual upgrades, etc., Production Control MUST receive a note from the Financial Aid Office *NOTE: -FAF806 is triggered by FAF899 so that it’s in the queue before FAA815. FAA815 has a conditional dependency of FAF806. -FAF802 is also triggered in by FAF899 so that it’s in the queue before FTR823. FTR823 has a conditional dependency of FAF802. (/FINAID) (FAF802) (FAF806) FAF818 FAF806 (/FINAID) (FAF803) SBTM=2130 Solid line = Trigger Dashed line = logical link ( ) Parentheses=requirement or dependency (? ) conditional dependency (/ ) negative dependency Flow Key OBSOLETE no longer needed 10/24/12

FAF System FAFMLDEV NEW REVISED SCHID: CALENDAR: DESCRIPTION: FAF MOCK LOAD PROCESSING FOR EVEN YEARS LOCATED ON AISDEVL Job on demand by SP/P or triggered in by FAF894V (submitted on WSUMVS1) FAFMLDEV FAF825 FAF803 FAF802 FAF899 FAF806 Solid line = Trigger Dashed line = logical link ( ) Parentheses=requirement or dependency (? ) conditional dependency (/ ) negative dependency Flow Key (FAF802) FAF818 OBSOLETE

FAF System FAFMLDOD NEW SCHID: CALENDAR: DESCRIPTION: FAF MOCK LOAD PROCESSING FOR ODD YEARS Partial mirror of FAFLDODD for annual maintenance/testing LOCATED ON AISDEVL Job runs on demand by SP/P or triggered in by FAF894V (submitted on WSUMVS1) FAFMLDOD FAF815 FAF813 FAF812 FAF898 FAF816 (FAF812) REVISED Solid line = Trigger Dashed line = logical link ( ) Parentheses=requirement or dependency (? ) conditional dependency (/ ) negative dependency Flow Key FAF808 OBSOLETE

FAF System FAFLDODD NEW REVISED SCHID: 2-7 CALENDAR: 7D ROLL=D DESCRIPTION: FAFLDODD FAF813 /FINAID = Mutually Exclusive Jobs FRS837 FAF812 SBTM = 2000 (/FINAID) (FAF815) SBTM = 1100 (/FINAID) FAF815 (/FINAID) (FAF898) SCHID 7: Runs Sundays, January - December. SCHID 2: Runs Mondays, January - December. SCHID 3: Runs Tuesdays, January - December. SCHID 4: Runs Wednesdays, January - December. SCHID 5: Runs Thursdays, January - December. SCHID 6: Runs Fridays, January - December. FAF898 SBTM = 1930 (FAF812) NOTE: Any changes to this job will affect FAAEVLTR, FAASULTR, FAAODLTR, FAAPARS, FAASPARS, FSLAY, FSLSUMR, & FAFLDEVN. Priority 170 If this dummy job needs to be turned off OR on due to annual upgrades, etc., Production Control MUST receive a note from the Financial Aid Office *NOTE: - FAF816 is triggered by FAF898 so that it is in the queue before FAA815. FAA815 has a conditional dependency of FAF FAF812 is also triggered in by FAF898 so that it’ in the queue before FTR823. FTR823 has a conditional dependency of FAF812. FAF816 (/FINAID) (FAF813) FAF808 (/FINAID) (FAF812) (FAF816) SBTM = 2130 Solid line = Trigger Dashed line = logical link ( ) Parentheses=requirement or dependency (? ) conditional dependency (/ ) negative dependency Flow Key OBSOLETE

FAF System FAF802 - FAF806 NEW REVISED DESCRIPTION: SCHID: CALENDAR: FAF805 Runs on Request. SBTM = 2230 OBSOLETE (JCL) AISDEVL: FAFMLDEV (FINAID Application closed) FAF806 (/FINAID) (FAF803) (FAA815 & 815S have cond. dep. of FAF806) (FAA885 & 885S have cond. dep. of FAF806) (FAA817 has a cond. dep. of FAF806) SCHID’s 1-6: FAFLDEVN DESCRIPTION: SCHID: CALENDAR: DESCRIPTION: SCHID: CALENDAR: FAF802 SCHID’s 1-6 : FAFLDEVN (/FINAID) (FTR823 has a cond. dep. of FAF802) (FAF825) DESCRIPTION: Runs on Request SCHID: CALENDAR: DESCRIPTION: SCHID: CALENDAR: FAF803 (/FINAID) SCHID’s 1-6 : FAFLDEVN FAF804 AISDEVL: FAFMLDEV OBSOLETE

FAF System FAF807 - FAF813 NEW REVISED DESCRIPTION: SCHID: CALENDAR: FAF See flow: FAFLDODD AISDEVL: FAFMLDOD (/FINAID) (FTR823 has a cond. dep. of FAF812) (FAF815) DESCRIPTION: SCHID: CALENDAR: DESCRIPTION: SCHID: CALENDAR: FAF813 (/FINAID) DESCRIPTION: SCHID 1-6: FAFLDODD AISDEVL: FAFMLDOD SCHID: CALENDAR: FAF808 DESCRIPTION: SCHID: CALENDAR: FAF807 Runs on Request. SBTM = 2230 OBSOLETE (JCL) (FINAID Application closed) DESCRIPTION OBSOLETE : DESCRIPTION: Runs via Natprocess SCHID: CALENDAR: FAF809 (FINAID Application closed) See flow: FAFLDODD AISDEVL: FAFMLDOD FAF810 OBSOLETE

FAF System FAF815 - FAF825 NEW REVISED DESCRIPTION: SCHID 1 - 6: FAFLDEVN AISDEVL: FAFMLDEV DESCRIPTION: POSSIBLE OBSOLETION DESCRIPTION: SCHID: CALENDAR: FAF819 FAF825 SCHID 1-6: FAFLDEVN FAF818 (?FAF835) (/FAF815) (/FINAID) (FAF802) (FAF806) (FINAID Application closed) DESCRIPTION: SCHID: CALENDAR: DESCRIPTION: SCHID: CALENDAR: FAF816 (/FINAID) (FAF813) (FAA815 & 815S have cond. dep. of FAF816) (FAA885 & 885S have cond. dep. of FAF816) (FAA818 has a cond. dep. of FAF816) FAF815 (/FAF825) CALENDAR: SCHID: DESCRIPTION: CALENDAR: SCHID: DESCRIPTION: SCHID 1 - 6: FAFLDODD AISDEVL: FAFMLDOD SCHID 1 - 6: FAFLDODD AISDEVL: FAFMLDOD AISDEVL: FAFMLDEV ALL JOBS OBSOLETE

NEW REVISED DESCRIPTION: SCHID: CALENDAR: Run on Request. FAF840 (JCL) FAF System FAF835 - FAF850 DESCRIPTION: SCHID: CALENDAR: DESCRIPTION: See FAFLDCPY SCHID: CALENDAR: FAF835 DESCRIPTION: Runs via Natprocess SCHID: CALENDAR: DESCRIPTION: SCHID: CALENDAR: (FAF825 has a cond. dep. of FAF835) POSSIBLE OBSOLETION FAF850 ALL JOBS OBSOLETE

NEW REVISED DESCRIPTION: Runs on Request of SP/P SCHID: SCHID: 1 – WSUMVS1 CALENDAR: FAF890 Run by SP/P FAF891 (JCL) (User Requirement: SP/P: has DSN been modified?) FAF System FAF890 - FAF895V DESCRIPTION: Run on Request SCHID: CALENDAR: FAF892 (JCL) SCHID: CALENDAR: FAF893 DESCRIPTION: Run on Request FAF894 SCHID: 1 – WSUMVS1 CALENDAR: FAF895 DESCRIPTION: Runs on Request of SP/P DESCRIPTION: Runs on Request of SP/P SCHID: 2 – AISDEVL CALENDAR: FAF894V SCHID 2 FAFMLDEV SCHID: 2 – AISDEVL CALENDAR: FAF895V SCHID 2 FAFMLDOD DESCRIPTION: Runs on Request of SP/P ALL JOBS OBSOLETE

NEW REVISED DESCRIPTION: SCHID: CALENDAR: FAF System FAF898 - FAF899 SCHID: CALENDAR: SCHID: CALENDAR: DESCRIPTION: SCHID: CALENDAR: FAF898 SCHIDS 1-6 FAFLDODD AISDEVL: FAFMLDOD DESCRIPTION: SCHIDS 1-6: FAFLDEVN AISDEVL: FAFMLDEV SCHID: CALENDAR: FAF899 CALENDAR: DESCRIPTION: SCHID: DESCRIPTION: ALL JOBS OBSOLETE