Pål Rylandsholm 16 June 2009 DRAFT DDR Phase 2 Status EPIM RUF meeting June 16th 2009.

Slides:



Advertisements
Similar presentations
WP4 – Task 4.4 LCA Activities
Advertisements

(Project) SIGN OFF PROCESS June 21, 2010
1 of 7 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
Preparatory Solvency II Reporting Industry Presentation.
In collaboration with Building XML for Daily Drilling Report Arnt Vegard Espeland October 2006.
Overview 1. 2 WITSML Special Interest Group Members A set of Data Exchange and Web Services Standards First published in 2001 Version 1.4 due in Q3 50+
N. K. SHETH & COMPANY1 THE CHAMBER OF TAX CONSUTANTS Welcomes all Participants to Seminar on e-Filing of Service Tax Returns Subject : E-Filing of Service.
Standards for Technology in Automotive Retail STAR Workbench 1.0 Michelle Vidanes & Dave Carver STAR XML Data Architects, Certified Scrum Masters.
32 nd Session of SIO Thessaloniki Milovan Misic Tuesday, September 26, 2006 Standards for digital archives and electronic records management.
SIP working group status Keith Drage, Dean Willis.
© 2012 IBM Corporation Rational Insight | Back to Basis Series Documents and Record Control Liu Xue Ning.
Managing Projects using Oracle Project Management (PJT) & SPREADSHEETS Neeraj Garg Vice President, Client Services.
And Together. Free your energies New XML schema and HTML report layout Daily Drilling Report Phase II.
MPR Reference Data status MPR Project Meeting June 17 th Pål Rylandsholm, DNV.
A Step by Step Guide How to add your own pages to the website.
ARCHIVISTS’ TOOLKIT WORKSHOP March 13, 2008 Christine de Catanzaro Jody Thompson.
Introduction of PRO WG activities Group Name: TP Source: Shingo Fujimoto, FUJITSU, Meeting Date: Agenda Item:
XRules An XML Business Rules Language Introduction Copyright © Waleed Abdulla All rights reserved. August 2004.
Christer Eriksson 11 March 2010 JWG1 - Wind Turbine Gearboxes IEC/ISO Design Requirements for Wind Turbine Gearboxes.
Edwin Aalders 24 March 2012 Materiality Applying Materiality in the Flexible Mechanism.
1 ONIX Serials Standards Update Forum ONIX for Serials Kathy Klemperer EDItEUR ALA, New Orleans, June 25, 2006.
1 Schema Registries Steven Hughes, Lou Reich, Dan Crichton NASA 21 October 2015.
PREMIS Rathachai Chawuthai Information Management CSIM / AIT.
Symbols relationship class of relationship class of class of relationship Name RDS Identifier/URI Relationships Classes Name Level 2/Class of class Level.
Agenda Introduction Energistics Standards Panorama / History / Participants Web Services Interoperability Standards v1.0 WITSML Version 1.x Services /
DDR Drilling and Well model Status – core group meeting.
WITSML™ Drilling Standards Pemex 21 August 2008 Ciudad de México Alan Doniger, Energistics.
DDR version 1.2 Project meeting - Web Lillian Hella POSC Caesar Association (PCA)
WITSML Technical Team Update Houston May Technical Team Responsible for technical content of WITSML standard XML Schemas XML Schemas Application.
US Army Corps of Engineers BUILDING STRONG ® Submitting a Local Adaptation USACE SDSFIE Training Prerequisites: Creating the local adaptation.
Human Resources 1 G-Top Global Workflow Employee View September 2014.
Water Framework Directive Report of Activity 1 OR Progress with WFD 2005 schemas.
Business Rules for MeF By Greg Martinez & Donna Mucilli.
Yao Bo Lu Stavanger, Daily Drilling Report Elements.
DEX Publication Project OASIS PLCS TC Telecon 22 January 2008 Trine Hansen.
Student Financial Assistance. Session 25-2 Session 25 Review of Institutional Student Information Record (ISIR) and EDE Technical Reference Changes.
Water Framework Directive WISE Items on which to report progress oFinalising schemas for 2005 reporting oDevelop WISE Web site for 2005 oDevelop.
XML blocks XML STRUCTURE The most basic building blocks of an XML file are elements, attributes and comments. Compiled based on Tutorial PhUSE 2008 XML.
BTT presentation to SG-6, Osaka, Japan, March Browse Task Team Progress to date, future plan 6th SG Meeting, Osaka Osamu Ochiai (NASDA) Browse Task.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
Work Related to Senate Bill 2202 (effective January 1, 2001)
External Interface Update 1 External Interface Update April 2, 2007 Daryl Shing.
Transition Plan Network Operations Model Change Requests 5/26/2010.
ProgramContract TypeVersionStart Date Creation End Date Submission End Date Select PlusCorp/Gov’t/Academic Open Value(Non-Japan)Corp/Gov’t
LEARNING AGREEMENT. This is the result of the agreement between the outgoing student and his/her academic tutor at the University of Murcia on the subjects.
Daglig borerapport Project meeting March
M-PEDD Technical Working Group
Michigan Electronic Grants System Plus
Input to project from IIP
AIXM – Work in Progress AIXM CCB – Webex, 24 JAN 2014.
DDR version 1.2 Project meeting - Web
Dossier Completion Timeline
For info only! Expected date of reporting of RBMP as reported informally by SCG Legal deadline 22/03/ MS by deadline 1 MS partly by deadline (BE)
Technical update 05 of April 2017
Curriculum Verification and Results Reporting Portal
Project Meeting June 17th Pål Rylandsholm, DNV
Daily Drilling Report Phase 2
Meeting of Working Group Data & Information Sharing (DIS)
Daily Drilling Report Phase 2
Questionnaire on progress in preparing reports under Nature Directives
San Jose 2008 AICC William Shook
Article 13 RBMP reporting testing 2009
Education and Training Statistics Working Group – 2-3 June 2016
EPIM RUF meeting June 16th 2009
Update on the status of RBMP reporting
Eddy Porosnicu EUROCONTROL
Review plan of the nature reporting – update 6
Eddy Porosnicu EUROCONTROL
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
WISE Working Group D September 2009, Brussels Jon Maidens.
Presentation transcript:

Pål Rylandsholm 16 June 2009 DRAFT DDR Phase 2 Status EPIM RUF meeting June 16th 2009

© Det Norske Veritas AS. All rights reserved. DDR Phase 2 Status 16 June 2009 DRAFT 2 DDR to regulators and license partners - Scope and deliverables of DDR phase 2 Drilling App/DB Drilling data PSA/NPD app Schema/Business validation DDR XSD Daily Drilling reports XML NPD/PSA Fact database Operators Regulators License Partners LicenseWeb Drilling App/DB Daily Drilling reports XML Daily Drilling reports XML pdf PCA RDS

© Det Norske Veritas AS. All rights reserved. DDR Phase 2 Status 16 June 2009 DRAFT 3 Status  As of March 24th EPIM officially owns the DDR XML schema  Partner reporting in License web - Same information content as submitted to PSA Status: - Specification document completed - Build - in progress  Updates to XML schema – documented in separate document - WITSML compliance - Correction of misspelling of enumerated values - Correct use of wrong data types (For example on comments which are limited to 256 characters) - Some elements may be changed from ‘optional’ to ‘mandatory’ in the report. - SAWSDL annotation - Coordination with Energistics Status: - Tested and completed – ready for approval by project group

© Det Norske Veritas AS. All rights reserved. DDR Phase 2 Status 16 June 2009 DRAFT 4 Status  Standard report layout for PDF reports Status: - Completed – approved by project group in meeting February 9th 2009  User guide updates - PSA Status: - Draft version available at ( %20borerapportering/WITSML_drillReport_profiled_schema_for_usermanual.xml)  Schema validation error messages - PSA Status: - Business rule validation error messages will be updated by cut of to new formats

© Det Norske Veritas AS. All rights reserved. DDR Phase 2 Status 16 June 2009 DRAFT 5 Way forward 1.Completion of DDR partner reporting in LW – Responsible Tieto, follow up by LW User forum 2.Communication to EPIM members regarding new DDR formats and date for go live of DDR reporting in Licenseweb – responsible EPIM Report User Forum – Drilling 3.Communicate to operators regarding cut of date for new formats to PSA – Responsible PSA 4.Project documentation will be added to EPIM’s document repository 5.October 1st is the date when PSA will require DDR according to the new formats, and the new DDR partner reporting solution in Licenseweb will be ready for use! 6.Further improvements and extensions of the DDR XML schema will be handled by EPIM RUF – Drilling A possible first case can be increased information scope in DDR. See Next slide

© Det Norske Veritas AS. All rights reserved. DDR Phase 2 Status 16 June 2009 DRAFT 6 Additional information requirements – NB not included project scope Identified during DDR Phase 2  Cost  Report nr -> A sequence number. Each day of operation is a new number increment  Start date -> Start of reporting/operation  Water depth  Bit record (additional info): grading, depth in, depth out, drill lenght (m), duration (hr), rop (m/hr)  Casing (new section): OD (in),top, bottom, weight, grade, estimated top of cement  "Duration" should be included for all time intervals. Identified during DDR Phase 1  Operation codes  Cement  Period of operation  “Drilling like units of measure”  Formation name – selection list  Datum (reference points)  Casing type  Pressurized coring  Well stimulation (At well testing) indicator  Perforation - Shot density  RIGTYPE  Bit data  Side track  Tight wells

© Det Norske Veritas AS. All rights reserved. DDR Phase 2 Status 16 June 2009 DRAFT 7 Safeguarding life, property and the environment